| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC 14 14 4 BEHARI LAL PAUL STREET BARANAGAR NORTH 24 PARGANAS BARANAGAR 700036 | 24 PARAGANAS NORTH | WEST BENGAL | 700036 | ₹1.3 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹1.3 LRejected-Finance BHAKURI P O BALARAMPUR P S BERHAMPORE DIST MURSHIDABAD WEST BENGAL PIN 742165 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742165 | ₹1.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 LRejected-Finance 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | ₹1.3 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
31 Jan 2026, 2:00 pmClosed
EE(WS)/N
KMC WATER SUPPLY NORTH, 79 BIDHAN SARANI,BOROUGH-II
DEVELOPMENT OF F.W SUPPLY BY LAYING OF 100 MM DIA D.I PIPE AND CUT FLUSH OF U.F.W SERVICE MAIN AT A PORTION OF 381 RABINDRA SARANI IN WARD NO - 20.
2026_KMC_991447_1
KMC/WS/N/25-26/20/170
Open Tender
CIVIL WORKS
7 days
IN WARD NO 20
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,600
11 Mar 2026
21 Jan 2026
2 Feb 2026
21 Jan 2026
31 Jan 2026
21 Jan 2026
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation
D.I SPUN PIPE 100MM (4??) (TYTON JOINT) CONFORMING TO IS : 8329/2000 CLASS K7 SUITABLE FOR PUSH -ON-JIONT (RUBBER GASKET JOINING) WITH INSIDE CEMENT MORTER LINING AND OUTSIDE BITUMINOUS /SYNTHETIC RESIN COATING COMPATABLE WITH THE METALIC ZINC COATING AS PER CLAUSE A-8
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete.
CHAPTER - V HYDRAULIC TESTING Hydraulically testing of C.l./D.I/A.C pipe lines in sections, under a head of water not less than 60m{6Kg/Cm....pressure) or above as per specific requirements by filling the main with supply of water including supply of all specials and equipments like pump sets, gauges, end caps blank flange etc.all complete as per specification and direction of the Engineer-in-Charge.[After successful completion of test. removal of ancillary specials.equipments. plugging arrangements and disposal of water sholl be made at no extra cost] Diameter in mm 100
CHAPTER - VI DISINFECTION OF PIPELINE Disinfection of water main by filling with water containing bleaching powder of sufficient quantity capable of maintaining a residual chlorine concentration of 10mg/l within the main after a detention period of two hours and flushing the same with fresh water all complete as per specification and direction of the Engineer-in- Charge.[After successful completion of the process, disposal of water and bacteriological testing of sample of flushed out water from the mains should be made at no extra cost] Diameter in mm 100
CHAPTER - VII MISCELLANEOUS ITEMS Supplying, fitting and fixing of C.I. Mechanical Compression flexible Collar Couplings suitable for C.I. Spun Pipes (as per IS: 1536) and D. I. Pipes (as per IS: 8329) complete with Sealing Rubber Gasket of EPDM quality (IS:5382/1985 Type - 4), Cast Iron Follower Glands and Mild Steel Nut Bolts (Zinc Coated). The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS: 1538. Fitting and fixing should be in proper position with proper care of main pipe line for leak proof condition. Diameter in mm 100
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.13 Hire & labour charges for diesel generating set for lighting including fuel,300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period.
CHAPTER - III TAKING OUT PIPES AND SPECIALS Cast Iron / Ductile Iron Pipes and Specials M.S. Pipes and Specials Shifting house connection or stand post connection from existing main to new main after excavation through any kind of soil and road materials up to required depth. dismantling existing ferrule with all fittings. plugging hole of old main with G.I. plug. drilling and tapping the new main. refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials. if required to be installed shall be paid extra) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-Charge.
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (i) 15 mm dia. medium quality
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.93 MB
Tendernotice_2.pdf
PDF • 1.93 MB
Tendernotice_3.pdf
PDF • 1.73 MB
BOQ_2424071.xls
BOQ • 0.37 MB
price20170.pdf
Additional Documents • 0.79 MB
Download all tender documents and submit your bid