| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Submit all necessary documents as per the bid conditions. |
| 2 | Accepted-Technical | Accepted-Technical Submit all necessary documents as per the bid conditions. |
| 3 | Accepted-Technical | Accepted-Technical Submit all necessary documents as per the bid conditions. |
| 4 | Accepted-Technical | Accepted-Technical Submit all necessary documents as per the bid conditions. |
| 5 | Accepted-Technical | Accepted-Technical Submit all necessary documents as per the bid conditions. |
Tender Value
₹20.7 L
EMD Value
₹41,500
Closing Date
6 May 2026, 4:00 pmClosed
DC (ENGR) SHQ Tezpur
SHQ TZP ITB Police Rangamati Bihaguri sonitpur Assam
Construction of Jawan kitchen come dining hall at kanakspur BOP of 55th Bn ITBP
2026_ITBP_905427_1
ITBP/SHQ-TZP/Work/55 Bn Const/ 2026-273
Open Tender
Civil Works - Buildings
Percentage
365 days
kanakspur BOP of 55th Bn ITBP
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹41,500
5 Jun 2026
15 Apr 2026
7 May 2026
15 Apr 2026
6 May 2026
15 Apr 2026
15 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dresing of sides and ramming of bottoms lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed , within a lead of 50 m: All kind of soil. | - | Cum. | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum. | - | - |
| 3 | Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m, | - | Cum. | - | - |
| 4 | Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete :. Cement Ordinary portland 43 grade conforming to IS No: 8112- 1989: 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum. | - | - |
| 5 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) over 75 mm bed by dry brick ballast 40 mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth | - | Sqm. | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size) | - | Cum. | - | - |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size) | - | Cum. | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | Cum. | - | - |
| 9 | Centering and shutturing incl. strutting, proping etc and removal of form work for all heights: Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm. | - | - |
| 10 | Centering and shutturing incl. strutting, proping etc and removal of form work for all heights:Suspended floors, roofs, landings, balconies and access platform | - | Sqm. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
tenderform.pdf
Tender Documents • 13.84 MB
BOQ_951692.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .