| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | ₹3.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.9 L+₹19,227.62 (5.12%)Rejected-AOC | ₹3.9 L+₹19,227.62 (5.12%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹4.1 L+₹32,941.62 (8.77%)Rejected-AOC | ₹4.1 L+₹32,941.62 (8.77%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹4.2 L+₹40,951.62 (10.9%)Rejected-AOC | ₹4.2 L+₹40,951.62 (10.9%) | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | PALLI PARAMBIL CONSTRUCTION L4 | ZAHID TRADING COMPANY L2 | SHARVESH AND COMPANY L1 | P A THOMAS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 6 | Cum | 220 ₹1,320 | 220 ₹1,320 | 198.02 ₹1,188.12 Lowest | 220 ₹1,320 |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 1 | Cum | 5,962 ₹5,962 | 5,500 ₹5,500 | 5,366.77 ₹5,366.77 | 5,000 ₹5,000 Lowest |
| 3.00 | Random Rubble masonry in Cement mortar 1:5 mix using Hard Granite Jells Stones for 10m3 including all cost etc., Completed | 6 | Sqm | 6,383 ₹38,298 | 5,900 ₹35,400 | 5,746.06 ₹34,476.36 | 5,500 ₹33,000 Lowest |
| 4.00 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 4 | Sqm | 1,181 ₹4,724 | 1,000 ₹4,000 Lowest | 1,063.02 ₹4,252.08 | 1,000 ₹4,000 Lowest |
| 5.00 | Fly ash Brick work in CM 1:5 (one cement & five sand) using size 9"X4 3/8"X 2 3/4" including finishing, curing etc., complete complying with standard specification - | 2 | Cum | 6,984 ₹13,968 | 6,300 ₹12,600 | 6,286.7 ₹12,573.4 Lowest | 6,984 ₹13,968 |
| 6.00 | Plastering with cement mortar 1:5 mix (one cement, five sand) to 12mm thick etc. completed | 15 | Sqm | 309 ₹4,635 | 300 ₹4,500 | 278.13 ₹4,171.95 Lowest | 309 ₹4,635 |
| 7.00 | Filling with Quarry Rubbish including watering and consolidation etc., | 9 | Cum | 523 ₹4,707 | 480 ₹4,320 | 470.75 ₹4,236.75 Lowest | 523 ₹4,707 |
| 8.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 3 | Qtl | 9,542 ₹28,626 | 8,800 ₹26,400 | 8,588.59 ₹25,765.77 Lowest | 9,200 ₹27,600 |
| 9.00 | Towards the charges for EB line shifting etc., Completed | 1 | Each | 5,000 ₹5,000 | 5,000 ₹5,000 | 4,500.5 ₹4,500.5 Lowest | 5,000 ₹5,000 |
| 10.00 | Cement concrete 1:1.1/2:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 3 | Cum | 9,841 ₹29,523 | 9,000 ₹27,000 | 8,858.78 ₹26,576.34 Lowest | 9,841 ₹29,523 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
1 Jul 2026, 3:00 pmClosed
Assistant Commissioner, South Zone
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Providing and laying of well water and drinking water pipeline at Echanari areas and Construction of Sintex tank with stage at Echanari Padasalai street in Ward No 97, South Zone.
2026_MAWS_681829_26
E2 / South Zone / 2026
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
17 Aug 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 6 | Cum | - | - |
| 2 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 1 | Cum | - | - |
| 3 | Random Rubble masonry in Cement mortar 1:5 mix using Hard Granite Jells Stones for 10m3 including all cost etc., Completed | 6 | Sqm | - | - |
| 4 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 4 | Sqm | - | - |
| 5 | Fly ash Brick work in CM 1:5 (one cement & five sand) using size 9"X4 3/8"X 2 3/4" including finishing, curing etc., complete complying with standard specification - | 2 | Cum | - | - |
| 6 | Plastering with cement mortar 1:5 mix (one cement, five sand) to 12mm thick etc. completed | 15 | Sqm | - | - |
| 7 | Filling with Quarry Rubbish including watering and consolidation etc., | 9 | Cum | - | - |
| 8 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 3 | Qtl | - | - |
| 9 | Towards the charges for EB line shifting etc., Completed | 1 | Each | - | - |
| 10 | Cement concrete 1:1.1/2:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 3 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
TenderDocument.pdf
Tender Documents • 0.23 MB
ITB.pdf
Additional Documents • 0.09 MB
BOQ_819915.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .