Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | L1 | Accepted-AOC Low | |
| 2 | L2₹23.5 L+₹88,500 (3.91%)Rejected-AOC | L2 | Rejected-AOC High | |
| 3 | L3₹28.9 L+₹6.3 L (27.7%)Rejected-AOC HOUSE NO 44 MASTER COLONY SATROD KHAS HISAR HARYANA 125044 | HISAR | HISAR | HARYANA | 125044 | L3 | Rejected-AOC High |
Tender Value
₹65 L
EMD Value
₹1.2 L
Closing Date
5 Aug 2023, 6:00 pmClosed
Sh Sachin Jaiswal, IDSE, CWE Chandimandir
HQ CWE Chandimandir
CA NO. CWE/CHM-54/2023-24 MAINT REPAIRS AND PERIODICALS SERVICES OF OFFRS MD ACCN IN SEC B AND DEF CIVIL MD ACCN CERTAIN MD ACCN AT UNDER AGE B/R-II AT CHANDIMANDIR
2023_MES_607431_1
CWE/CHM-54/2023-24
Open Tender
Miscellaneous Works
Item Rate
180 days
HQ CWE Chandimandir
Class C category a(i)
8 documents required · 8 mandatory
₹1,000
Yes
GE Chandimandir
₹1.2 L
Yes
19 Sept 2023
30 Jun 2023
12 Aug 2023
30 Jun 2023
5 Aug 2023
22 Jul 2023
1 Jul 2023 - 8 Jul 2023
Amount
Material & labour for rendering 15mm thick cement plaster in CM 1:4 on brick or concrete surface on wall finished even and fair without using extra cement mixed with water proofing compound incl taking down existing plaster complete all as specifed and as directed. NOTE: (WPC will be measured and paid separately)
Material & labour for rendering 10mm thick cement plaster in CM 1:6 on brick or concrete surface of wall finished even and smooth without using extra cement incl taking down existing plaster complete all as specifed and as directed.
Material & labour for rendering 5 mm thick cement plaster in CM 1:3 on brick or concrete surface of ceiling finished even and smooth without using extra cement complete incl taking down existing plaster complete all as specifed and as directed.
Material & labour for taking down, chipping and removing the loose, spailt, damaged cement concrete, cement mortar surfaces of RCC columns, beams, walls, chajjas etc and exposing the reinforced cement, wire brushing and cleaning the exposed steel reinforced bar, apply rust remover over the cleaned re-barsurface wash the re-bar with clean water for removing all rusts from the old re-barsurfaces, fixing new reinforcement for strengthen the members as required, applying two coats of epoxy zinc primer on new and old steel surfaces, saturate the substrate with water applying one coat of polymer modified cement and quartz sand mortar in CM 1:3 mix, 40mm average thick in two coats, with and including polymer @10% by weight of cement, including erecting and dismantling steel scafolding for carrying out the work upto height of 12m (Appx) complete all as specified and as directed. Note:- (The welded steel wire fabric and MS will be measured and paid separately).
Supply & fixing Welded steel wire fabric cut to length. Fixed to steel members/ reinforecement steel, weigh per Sqm n exc 4 Kg. complete all as specifed and as directed.
Supply only Integral waterproofing compound complete all as specifed and as directed. Note:- (This item will be executed when specially ordered by Engr-in- Charge).
Material & labour for preparing new plastered surfaces and applying two coats of Cement base paint on new wall surfaces including all necessary wetting and curing complete all as specifed and as directed.
Material & labour for preparing new plastered surfaces and applying wall care putty of not less than 1.00mm thick incl smoothening the surfaces with sand papers etc, and applying two coats of OBD on wall surfaces complete all as specified.
Material & labour for preparing new plastered ceiling surfaces and applying two coats of white wash complete all as specified and directed.
Material & labour for preparation of old decorated wall/ceiling surfaces by removing spoiled paint/scale dirt with wire brush or mechanical means/grinder including washing rubbing the surfaces and applying two coats of exterior emulsion paint (ultima) as per manufacturer instruction complete all as specified and directed. Make of exterior wall primer: Asian/ Berger/ Nerolac (Best quality). Make of exterior emulsion: Asian (Apex ) / Berger (Weather Coat smooth) / Nerolac (Excel).
Material & labour for preparation of old decorated wall/ceiling surfaces by removing spoiled paint/scale dirt with wire brush or mechanical means/grinder including washing rubbing and Applying wall care putty exterior grade in two coats smoothening the surfaces with sand papers and applying coat of wall primer complete all as specifed and as directed.
Material & labour for preparing old decorated wall surfaces and applying One coat of exterior emulsion paint complete all as specifed and as directed. Make of exterior emulsion: Asian (Apex ) / Berger (Weather Coat smooth) / Nerolac (Excel). Note :- Complete material of qty mentioned in CA will brought at site before execution of work.
Material & labour preparation of old plaster wall/ ceiling surfaces and applying One coat of plastic emulsion using hand roller complete all as specifed and as directed.
Material & labour preparation of old plaster wall/ ceiling surfaces and applying two coat of plastic emulsion using hand roller complete all as specifed and as directed.
Material & labour for Preparing old decorated wall surfaces and applying One coat of distemper oil emulsion (OBD) complete all as specifed and as directed.
Material & labour for Preparing old decorated wall surfaces and applying Two coats of distemper oil emulsion (OBD) complete all as specifed and as directed.
Material & labour for Preparing old decorated wall surfaces and applying One coats of cement base paint including necessary curing, complete all as specified.
Material & labour for Preparing old decorated wall surface and applying Two coats of cement base paint including necessary curing, complete all as specifed and as directed.
Material & labour For Preparaing old decorated ceiling surface and applying One coat of white washing on old ceiling surfaces complete all as specifed and as directed.
Material & labour For Preparaing old decorated ceiling surface and applying One coat of OBD on old ceiling surfaces complete all as specifed and as directed.
Material & labour for writing letters/fiqures/numbers etc. letter size n.exc. 30cm height over black synthentic enamel painted surface all as specfieid.
Material & labour for Preparation of old wooden surface of any description exceeding 10 cm width/girth and applying two coat of synthetic enamel paint complete all as specified.
Material & labour For Preparation of old steel and iron surface of any description not otherwise described, over 10 cm in width or girth and applying One coat of synthetic enamel paint , complete all as specified.
Material & labour for preparing old decorated concrete/plastered surfaces and applying two coats of synthetic enamel paint complete all as specified.
Material & labour for preparing old decorated concrete/plastered surfaces of any description and applying one coats of synthetic enamel paint complete all as specified.
Material and labour for providing 1.0mm to 1.5mm thick dune/ grit finish ready mixed product with natural stone granules / minerals in particle size of 400-600, 600-800, 1000-1200 micros consisting of approved synthetic /acrylic binder anti cracking, anti foaming, anti fungal, anti rusting agents and applied directly over the cement plaster / stone surface with and including a coat of base coat including necessary steel scaffolding work upto 25 meter hight, complete all as per manufacturer instructions complete all as specified and directed.
Gunjan and Gunjan Associates
m/s AR Construction co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .