| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.6 LAccepted-Finance | ₹39.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹43.9 LAccepted-Finance | ₹43.9 L | L2 | Accepted-Finance L2 |
| 3 | L3₹44.3 LAccepted-Finance | ₹44.3 L | L3 | Accepted-Finance L3 |
| 4 | L4₹47.1 LAccepted-Finance | ₹47.1 L | L4 | Accepted-Finance L4 |
| 5 | L5₹47.4 LAccepted-Finance | ₹47.4 L | L5 | Accepted-Finance L5 |
| Sl No | Description | Qty | Unit | M/S CLEAR LINE ENGINEERS CONTRACTOR L6 | ASIF IQBAL KHAN (KHAN CONSTRUCTIONS) L5 | M/S R. V ENTERPRISES L4 | M/S NAIK ELECTRICAL CONSTRUCTION AND SUPPLIERS L2 | Madina Electrical Works L1 | VEENA CONSTRUCTION CO. L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SITC of following materials as per REC standards for Creation of 400 KVA Sub-Station alongwith HT/LT network & Street lights at IRP Bn.-22nd Headquarters Indra Nagar Kishtwar in respect of Electric Division JPDCL Kishtwar. | |||||||||
| 1.01 | 400KVA (11/0.433-0.250KV, 50Hz, Copper wound Distribution Transformer of Energy Efficiency Level-2 (New) with Bimettalic Connectors | 1 | Nos | 8,50,000 ₹8.5 L | 8,00,000 ₹8 L | 8,70,000 ₹8.7 L | 10,50,000 ₹10.5 L | 7,00,000 ₹7 L | 10,50,000 ₹10.5 L |
| 1.02 | ST Pole 9 mtr long (HT & Sub-station) 410-SP-33 | 18 | Nos | 18,000 ₹3.2 L | 22,500 ₹4.0 L | 15,300 ₹2.8 L | 17,000 ₹3.1 L | 17,500 ₹3.1 L | 18,500 ₹3.3 L |
| 1.03 | ST Pole 9 mtr long (LT) 410-SP-33 | 50 | Nos | 18,000 ₹9 L | 21,000 ₹10.5 L | 15,300 ₹7.7 L | 17,000 ₹8.5 L | 17,500 ₹8.8 L | 18,500 ₹9.3 L |
| 1.04 | 50 mm sq. AB (HT) Cable (11KV), standard company make | 0.75 | Kms | 7,40,000 ₹5.5 L | 6,50,000 ₹4.9 L | 9,00,000 ₹6.8 L | 6,00,000 ₹4.5 L | 60,000 ₹45,000 | 7,00,000 ₹5.3 L |
| 1.05 | 11KV, 50 mm sq. Termination AB Cable Kit Heat Shrinkable | 4 | Nos | 3,500 ₹14,000 | 2,500 ₹10,000 | 5,000 ₹20,000 | 2,000 ₹8,000 | 2,500 ₹10,000 | 6,500 ₹26,000 |
| 1.06 | 120 mmsq. AB (LT) cable (3x120+1x50+1x16 mm sq.) | 0.6 | Kms | 8,25,000 ₹5.0 L | 8,00,000 ₹4.8 L | 5,20,000 ₹3.1 L | 4,50,000 ₹2.7 L | 8,50,000 ₹5.1 L | 3,50,000 ₹2.1 L |
| 1.07 | 70 mmsq. AB (LT) cable (3x70+1x50+1x16 mm sq.) | 0.8 | Kms | 4,95,000 ₹4.0 L | 700 ₹560 | 5,10,000 ₹4.1 L | 4,00,000 ₹3.2 L | 3,90,000 ₹3.1 L | 2,25,000 ₹1.8 L |
| 1.08 | 120mmsq. /70 mm sq. LT AB Cable Kit Heat Shrinkable | 20 | Nos | 3,000 ₹60,000 | 4,750 ₹95,000 | 4,000 ₹80,000 | 50 ₹1,000 | 2,500 ₹50,000 | 6,500 ₹1.3 L |
| 1.09 | ACSR Weasel conductor 30mmsq. | 0.1 | Kms | 35,000 ₹3,500 | 90,000 ₹9,000 | 35,000 ₹3,500 | 30,000 ₹3,000 | 36,000 ₹3,600 | 39,000 ₹3,900 |
Tender Value
₹58.5 L
EMD Value
₹1.5 L
Closing Date
9 Feb 2026, 4:00 pmClosed
EX ENGINEER ED KISHTWAR
JPDCL ED Kishtwar
SITC as per REC Standards for Creation of 400KVA substation along with HT-LT network and Street Lights at IRP 22nd Battalion Headquarters, Indra Nagar Kishtwar in respect of Electric Division JPDCL Kishtwar on turnkey basis
2026_PDD_302063_1
enit no. 27 of 2025-26
Open Tender
Electrical Works
Kishtwar
Please refer Tender documents
4 documents required · 4 mandatory
₹2,000
EX ENGINEER ED JPDCL KISHTWAR
₹1.5 L
28 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
2 Feb 2026 - 9 Feb 2026
SITC of following materials as per REC standards for Creation of 400 KVA Sub-Station alongwith HT/LT network & Street lights at IRP Bn.-22nd Headquarters Indra Nagar Kishtwar in respect of Electric Division JPDCL Kishtwar.
400KVA (11/0.433-0.250KV, 50Hz, Copper wound Distribution Transformer of Energy Efficiency Level-2 (New) with Bimettalic Connectors
ST Pole 9 mtr long (HT & Sub-station) 410-SP-33
ST Pole 9 mtr long (LT) 410-SP-33
50 mm sq. AB (HT) Cable (11KV), standard company make
11KV, 50 mm sq. Termination AB Cable Kit Heat Shrinkable
120 mmsq. AB (LT) cable (3x120+1x50+1x16 mm sq.)
70 mmsq. AB (LT) cable (3x70+1x50+1x16 mm sq.)
120mmsq. /70 mm sq. LT AB Cable Kit Heat Shrinkable
ACSR Weasel conductor 30mmsq.
11KV Pin insulator 12kV,5kN Polymer
11KV Disc insulator Polymer with fittings 12kV 45kN
C. I Cross Arm 8ft Long GI (S.stn & Link set) (75x40x6) mm
Angle Brace 8ft long GI for sub station (40x40x6) mm
C. I. Cross Arm 5ft Long GI (75x40x6) mm
GI V-Cross Arms with F-Clamps/Top Clamps & Back Clamps
Angle Brace 1 Mtr. long GI (40x40x6) mm
11KV GO AB Switch 3-phase,3-pole 400A
11KV Horn Gap fuse single phase 400 Amp.
Gapless Surge Arrestor, 9KV, 10KA, Lightening arrestor with polymer housing station type
Suspension clamp with Eye Hook and other assembly complete
Earthing complete by GI Pipe 40mm or GI Rod 20mm, 2.5 mtr. long through GI Strip, (for line poles)
Back Clamps 50x6mm GI
G.I Strip for earthing of LA set with Bobbin insulator assembly
LT Galvanised stay set with 50x8mm Stay clamp, Guy insulators (2No.), Anchor plate (200x200x6), Nut Bolts, 2 no. Turn Buckels, 1.8 mtr. long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
PVC cable 120mmsq 3.5 core
LT Distribution Box for 400 kVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
3 Phase CT/PT Unit (30/5) with Trivector meter Complete set
PVC Cable 300mmsq Single core (Armoured) ,XLPE
Al Thimbles 300mmsq.
Al Thimbles 120mmsq.
Al Thimbles 70mmsq.
Earthing of sub station - excavation of earth pit of dia 650 mm & depth 3000 mm, installation of earthing pipe of 40mm nominal bore & 4 mm wall thickeness and length 2.5 meter long. GI strip for neutral earthing of size 25mm x 3mm for connection of Transformer body, GO set & LA, GI nuts & bolts, Reffiled with enchancement materials.
Cement Bottoming 1:2:4 Mix as per REC Standards of ST Poles 9mtr (2'x2'x2.5')
Construction of RCC Bed for 400KVA transformer (for specifications/size read GTP)
LT Distribution Box (415V,AC) for service cable, 8 terminal output
GI Barbed wire/ Anti climing device for 20 no. ST Poles HT
Bus Bar Insulators
Shifting of Old existing HT Line 0.3Km line length
Almunium Strip
IPC of sorts
Fixing of Danger Plates with clamps
Nuts & Bolts Of Sorts Galnvanized
Applying coating of Red oxide & Almunium Paint on all ST Poles
200W Flood light with mounting, & MCB complete (make Crompton/Havells)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 1.62 MB
Tendernotice_3.pdf
PDF • 0.10 MB
Tendernotice_4.pdf
PDF • 6.54 MB
Tendernotice_5.pdf
PDF • 0.32 MB
Tendernotice_6.pdf
PDF • 0.08 MB
BOQ_980058.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid