| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | ₹6.6 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹6.7 L+₹5,614.50 (0.85%)Rejected-Finance | ₹6.7 L+₹5,614.50 (0.85%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹6.7 L+₹9,145.40 (1.38%)Rejected-Finance | ₹6.7 L+₹9,145.40 (1.38%) | L3 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | Arun Malhotra L1 | Malhotra Associates L2 | Vishal Suri L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/ soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in -Charge. | 12 | Cum | 495 ₹5,940 Lowest | 500 ₹6,000 | 500 ₹6,000 |
| 2.00 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in-Charge | 4.25 | Cum | 750 ₹3,187.5 | 750 ₹3,187.5 | 725 ₹3,081.25 Lowest |
| 3.00 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge | 5.54 | Cum | 10,900 ₹60,386 Lowest | 11,000 ₹60,940 | 11,000 ₹60,940 |
| 4.00Providing and laying cement concrete work 1: 1.50:3 (1 cement: 1.50 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 4.10 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of 2.7 Engineer-in-Charge | 1.81 | Cum | 12,400 ₹22,444 Lowest | 12,600 ₹22,806 | 12,500 ₹22,625 |
| 4.20 | Lintel beam, girder bressumers upto floor within all leads and lifts as per the direction of Engineer-in-charge. | 2.77 | Cum | 12,900 ₹35,733 | 12,950 ₹35,871.5 | 12,800 ₹35,456 Lowest |
| 5.00Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | ||||||
| 5.10 | Beam, cantilever girder and lintel side and soffit of beam, beam haunching, cantilever bressumers and lintel not exceeding one meter indepth in all height within all leads and lifts as per the direction of Engineer-in-charge. | 12.29 | SQM | 695 ₹8,541.55 Lowest | 695 ₹8,541.55 Lowest | 730 ₹8,971.7 |
| 6.00 | Fine sand filling upto tank base beam level. | 1.79 | Cum | 4,750 ₹8,502.5 Lowest | 4,750 ₹8,502.5 Lowest | 5,000 ₹8,950 |
| 7.00 | Providing and fixing zinc aluminium storage tank rising capacity 30000 ltrs Heaving 1 No. inlet, 1No. Outlet, 1No. Scour pipe each of dia 80mm, conical roof with HDG roof trusses and lockable and Access hatch including all fittings including 1No. hanger heavy duty cage ladder nylone roof Gl 1No. and aluminium steps access ladder hatch on roof outlet and over flow nozzels level indicator material of approved by STAC and warrenty of 10 years including fixing of three laps under the roof complete within all leads and lifts as per the direction of Engineer-in-charge | 30,000 | Ltr | 16.55 ₹4,96,500 Lowest | 16.7 ₹5,01,000 | 16.85 ₹5,05,500 |
Tender Value
₹6.6 L
EMD Value
₹13,269
Closing Date
15 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVIISON CHOWARI
SH CO Zinc Aluminium Steel Storage Tank 30000 Itr Capacity at Swami Harigiri Asharam Kakira
2026_HPIPH_138418_1
NIT NO 6747-6846 DATED 07-07-2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
CHOWARI CHAMBA HP
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹13,269
7 Aug 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/ soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in -Charge. | 12 | Cum | - | - |
| 2 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in-Charge | 4.25 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge | 5.54 | Cum | - | - |
| 4Providing and laying cement concrete work 1: 1.50:3 (1 cement: 1.50 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.1 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of 2.7 Engineer-in-Charge | 1.81 | Cum | - | - |
| 4.2 | Lintel beam, girder bressumers upto floor within all leads and lifts as per the direction of Engineer-in-charge. | 2.77 | Cum | - | - |
| 5Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 5.1 | Beam, cantilever girder and lintel side and soffit of beam, beam haunching, cantilever bressumers and lintel not exceeding one meter indepth in all height within all leads and lifts as per the direction of Engineer-in-charge. | 12.29 | SQM | - | - |
| 6 | Fine sand filling upto tank base beam level. | 1.79 | Cum | - | - |
| 7 | Providing and fixing zinc aluminium storage tank rising capacity 30000 ltrs Heaving 1 No. inlet, 1No. Outlet, 1No. Scour pipe each of dia 80mm, conical roof with HDG roof trusses and lockable and Access hatch including all fittings including 1No. hanger heavy duty cage ladder nylone roof Gl 1No. and aluminium steps access ladder hatch on roof outlet and over flow nozzels level indicator material of approved by STAC and warrenty of 10 years including fixing of three laps under the roof complete within all leads and lifts as per the direction of Engineer-in-charge | 30,000 | Ltr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
FORM68.pdf
Tender Documents • 2.11 MB
BOQ_205015.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .