| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC AT NEAR RADHA KRUSHNA TEMPLE HANUMANTIA KURAL ODAGAON DIST NAYAGARH | ODAGAON | NAYAGARH | ODISHA | 752090 | 1 | Accepted-AOC Lowest Quotation | |
| 2 | 2₹2.4 Cr+₹9,758.40 (0.04%)Rejected-Finance | 2 | Rejected-Finance Amountquotedhigherthanthequalifiedbidder | |
| 3 | Rejected-Technical AT GUANDO PO GOUDAPUT PS ODAGAON DIST NAYAGARH PIN 752081 | ODAGAON | NAYAGARH | ODISHA | 752081 | - | Rejected-Technical AsthebidderisclassAcontractorandhasnocenteringandshutteringmaterilsrequiredforexecutionofworkinfield |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
18 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO, Nayagada Forest Division
O/o DFO, Nayagada Forest Division
Construction of 19 Nos VSS Buildings in Bahadajhola Section of odagaon Range in Nayagada Division
2026_DFONA_145621_1
03 of 202-27 -02
Open Tender
Civil Works - Buildings
Percentage
90 days
Bahadajhola
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.0 L
25 Nov 2026
12 Nov 2026
19 Nov 2026
12 Nov 2026
18 Nov 2026
12 Nov 2026
12 Nov 2026 - 18 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in hard soil or gravelly soil including dressing and levelling the bed and disposal of the excavated materials within initial leads and lifts as per direction of EIC. | 600.97 | Cum | 282.88 | ₹1,70,002.39 |
| 2 | Filling foundation and plinth with clean river sand with watering and curing including cost, conveyance, royalty and taxes of all materials and labour etc complete. | 471.01 | Cum | 580.39 | ₹2,73,369.49 |
| 3 | Providing Cement Concret (1:3:6) using 4cm size HG Metal including cost, conveyance, royalty and taxes of all materials and labour etc complete. | 160.93 | Cum | 6,229.56 | ₹10,02,523.09 |
| 4 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - Coloumn Base and footing. | 90.35 | Cum | 6,606.86 | ₹5,96,896.77 |
| 5 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - Plinth | 35.95 | Cum | 7,481.28 | ₹2,68,937.05 |
| 6 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Grade Col. Beam | 82.52 | Cum | 15,989.7 | ₹13,19,422.07 |
| 7 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Lintel | 20.73 | Cum | 14,320.58 | ₹2,96,851.3 |
| 8 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Chajja | 237.99 | Cum | 1,241.85 | ₹2,95,552.85 |
| 9 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - Stair case | 23.47 | cum | 15,851.88 | ₹3,71,964.36 |
| 10 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Roof Slab | 105.18 | Cum | 13,924.03 | ₹14,64,585.17 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
DTCNBahadajholaSection.pdf
Tender Documents • 1.77 MB
BOQ_619335.xls
BOQ • 0.32 MB
Corrigendum.pdf
PDF • 1.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .