| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l 1₹1.9 LAccepted-Finance | ₹1.9 L | l 1 | Accepted-Finance l 1 |
| 2 | l 2₹1.9 LRejected-Finance 5 73 SIVALINGAPATTI STREET KULASEKARAPATTI TALUK KULASEKARAPATTI TIRUNELVELI 627806 | KULASEKARAPATTI | TIRUNELVELI | TAMIL NADU | 627806 | ₹1.9 L | l 2 | Rejected-Finance l 2 |
| Sl No | Description | Qty | Unit | Arunachalam L2 | Thenraj L1 |
|---|---|---|---|---|---|
| 1.00Renovation of Anganwadi Building at Ramnagar Village in Kuthapanchan Panchayat. | |||||
| 2.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 17.75 | Sqm | 290 ₹5,147.50 | 283 ₹5,023.25 |
| 3.00 | Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc | 32.23 | Sqm | 330 ₹10,635.90 | 325 ₹10,474.75 |
| 4.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including flling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly etc., complete | 12.56 | Sqm | 315 ₹3,956.40 | 309 ₹3,881.04 |
| 5.00 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete | 332.12 | Sqm | 220 ₹73,066.40 | 211 ₹70,077.32 |
| 6.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete | 219.51 | Sqm | 280 ₹61,462.80 | 268 ₹58,828.68 |
| 7.00 | Painting two coats over old iron work such as dours windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat et.., complete | 34.86 | Sqm | 160 ₹5,577.60 | 156 ₹5,438.16 |
| 8.00 | Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc., | 8 | Sqm | 590 ₹4,720 | 585 ₹4,680 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 29,622 ₹29,622 | 28,513 ₹28,513 |
Tender Value
Refer Docs
EMD Value
₹2,150
Closing Date
26 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYAT ALANGULA
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYAT ALANGULAM
Renovation of Community Hall at Kadanganeri Village and Panchayat
2026_RDTN_662601_1
RBMS 2025-26 Renovation of Community Hall at Kadanganeri Village and Panchayat
Open Tender
Civil Works - Others
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYAT ALANGULA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,150
Yes
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYAT ALANGULA
11 Mar 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
20 Feb 2026
Renovation of Anganwadi Building at Ramnagar Village in Kuthapanchan Panchayat.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including flling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly etc., complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete
Painting two coats over old iron work such as dours windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat et.., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
NOTICE.pdf
Tender Documents • 2.60 MB
BOQ_795446.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid