Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | +0.00% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 L+₹4,167.11 (2.64%)Admitted-Finance 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 | HOWRAH | WEST BENGAL | 711110 | +2.64% | ₹1.6 L+₹4,167.11 (2.64%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹6,455.86 (4.09%)Admitted-Finance | +4.09% | ₹1.6 L+₹6,455.86 (4.09%) | L3 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,500
Closing Date
21 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGR. (C ), BR-XIV
516, D. H. ROAD, KOLKATA-700034
PROVIDING DURMA AND LABOUR AT DIFFERENT IMMERSION GHATS OF BR - XIV ( WARD NOS - 121,127 AND 128 ) FOR YEAR 2026
2026_KMC_1041838_1
KMC/XIV/127/011/26-27/PARK
Open Tender
CIVIL WORKS
Percentage
40 days
Ward-127
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹3,500
24 Sept 2026
12 Sept 2026
23 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(B).
MAINTENANCE WORKS?(11)Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (Payment to be made on length of wall(c) With bamboos of
length above 2.40 m. and up to 3.00 m. each | 82.5 | METER | 1,207 | ₹99,577.5 |
| 2 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A).
ORIGINAL WORKS?.(10)Bamboo walling made of crushed bamboo or split bamboo or bamboo twigs(kanchis) as directed and tied with necessary stiffners of split bamboo (in pairs) made of 100mm dia. Bamboo fitted and fixed complete (but excluding the cost of
supporting frame work) | 45 | SQUARE METER | 127 | ₹5,715 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 195 | EACH | 269.5 | ₹52,552.5 |
| 4 | Sub Total | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_2557728.xls
BOQ • 0.33 MB
TForm.pdf
Tender Documents • 0.40 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .