Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.0 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹57.9 L+₹58,017.40 (1.01%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹59.2 L+₹2.0 L (3.43%)Rejected-AOC 07 KADAURA KADAURA NEAR MAIN MARKET JALAUN UTTAR PRADESH 285203 | JALAUN | UTTAR PRADESH | 285203 | L3 | Rejected-AOC Found 3rd Highest |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
4 May 2024, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER, EDC, BANDA
Chilla Road, Indira Nagar, Banda
Shifting/UG work of 33 KV electrical utilities due to widening of Banda-Bahraich Marg (Kachehari Chauraha to Mawai-by-pass Chauraha) under EUDD, Banda
2024_DVVNL_921729_2
EDCBNDA-107/2023-24
Open Tender
Electrical Works
Turn-key
60 days
BANDA
As per annexured
2 documents required · 2 mandatory
₹3,540
DVVNL
₹50,000
O/O SE, EDC, BANDA
6 Oct 2024
19 Apr 2024
4 May 2024
19 Apr 2024
4 May 2024
19 Apr 2024
20 Apr 2024
The work of erection of new 33 KV DISTRICT COURT OVERHEAD Line by shifting of underground 33 KV Lines of District Court, Banda with hoisting of 33 KV Cable at double pole structure District Hospital side from 132 KV Sub-Station to Court gate no. 2 via Maharana Pratap Chauk due to road widening of Banda-Bahraich Marg (Chilla Road to Ghoda Chauraha & Kachehari Chuaraha) from 33/11 KV Sub-Station, Chilla Road, Banda UNDER FULL DEPOSIT SCHEME YEAR 2023-24 under EUDD, BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. All steel material supplied by firm have to Galavanised, Details of the work as given below :-
SUPPLY OF MATERIAL -
ST Pole 11.0 Mtr. Long SP-55
F/E-Bracket with N & B for fitting Top Insulator 33 KV
33 KV Pin Insulator
33 KV GI Pin with Nut
Cable All. 3x120 Sq.mm. XLPE 33 KV
33 KV Cable Jointing Kit for 3x120 Sq.mm. XLPE Cable
GI Pipe 6 Inch Dia (3 Mtr. Each Pipe) with supporting clamps.
MS Angle Iron 65x65x6x2700 mm Long Bracing with 4 Clamps & Nut-Bolts.
Top Channel 125x65x6x2240 mm
MS Dropper Channel 100x50x2028 mm
PG Clamp
Danger Board with clamp & Nut/Bolt for 33 KV
Clamp with Nut-Bolts for Channel and for supporting cable
Stay Set Complete (GI Stay rod 20x1800 mm, Stay wire 7/8 SWG 10 Kg., Stay clamp, Bolt-Nut & Washer with Grounting) for ST Pole.
Earthing Rod Complete
Nut, Bolt & Washer of suitable sizes
ERECTION WORK -
Erection & fixing of ST Pole 11.0 Mtr. Long SP-55 as single/double pole structure with 33 KV fittings.
Erection & fixing of F/E-Bracket with N & B for fitting Top Insulator 33 KV
Erection & fixing of 33 KV Pin Insulator
Erection & fixing of 33 KV GI Pin with Nut
Erection & fixing of GI Pipe 6 Inch Dia (3 Mtr. Each Pipe) with supporting clamps.
Erection & fixing of MS Angle Iron 65x65x6x2700 mm Long Bracing with 4 Clamps & Nut-Bolts.
Erection & fixing of Top Channel 125x65x6x2240 mm
Erection & fixing of MS Dropper Channel 100x50x2028 mm
Erection & fixing of PG Clamp
Erection & fixing of Danger Board with clamp & Nut/Bolt for 33 KV
Erection & fixing of Clamp with Nut-Bolts for Channel and for supporting cable
Erection & fixing of Stay Set Complete
EARTHING OF POLE BY EARTHING ROD
Concreting/Grouting of erected 11 Mtr. long STP Poles with muffing as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast /stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Making of Cable J/Kit 33 KV & Hanging and fixing on double pole with proper contact.
Laying of XLPE Cable in trench with required sand.
Dismentalling of line material/poles and deposit to central store.
M/S AARADHYA AND ADHYATM ASSOCIATES
AKSHITA CONSTRUCTION COMPANY
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .