| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC OFFICE NO 126 127 PLOT NO GP 185 186 SECOND FLOOR KOHINOOR MAJESTIC CHINCHWAD PUNE 19 PUNE MAHARASHTRA INDIAN 411019 | PUNE | MAHARASHTRA | 411019 | ₹29.5 L | L1 | Accepted-AOC accepted |
| 2 | L2₹30.2 LRejected-AOC | ₹30.2 L | L2 | Rejected-AOC rejected |
| 3 | L3₹30.5 LRejected-AOC | ₹30.5 L | L3 | Rejected-AOC rejected |
| 4 | Not Admitted-Fee/PreQual/Technical AT ALIBAG TAL ALIBAG DIST RAIGAD | ALIBAG | RAIGAD | MAHARASHTRA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹29.5 L
EMD Value
₹29,490
Closing Date
20 Apr 2026, 10:00 amClosed
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction Of RCC Protection Wall Near River At.Umate, Tal.Alibag Dist.Raigad
2026_RAIGA_1294319_3
RAIGAD/RWSS/4/2026-27
Open Tender
Civil Works - Water Works
180 days
At.Umate, Tal.Alibag Dist.Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹29,490
8 May 2026
10 Apr 2026
21 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soil of all types ,sand,gravel and soft murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed , normal dewatering, preparing the bed for foundation and excluding backfilling , etc. complete | - | Cum. | - | - |
| 2 | Item No.2:- Excavation for foundation / pipe trenches in hard murum and boulders ,W.B.M. Road including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling , etc. complete | - | cum | - | - |
| 3 | Item No. 3 : Providing dry/trap/granite/quartzite rubble stone soling 15 cm … etc complete | - | cum | - | - |
| 4 | Item No. 4 : Providing & laying in situ. C.C of trap granite/ quartzite / gneiss/ metal for foundation & bedding including dewatering , from work,compacting, curing, finishing etc. complete. M 150 | - | cum | - | - |
| 5 | Item No.5:- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade chajjas/ paropels/ qurtain boalls/ partition wall / pardies | - | cum | - | - |
| 6 | Item No.6:- Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing, foundation,slab,beams,columns,canopies, staircase, newels,chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars,bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). With Lebour Rate Tor Steel | - | mt | - | - |
| 7 | Itemno:7 - Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. | - | RMT | - | - |
| 8 | Item No.8:- Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. | - | bhp.hr | - | - |
| 9 | Item No 9:-Providing and fixing Sign Board of Standard Size | - | nos | - | - |
| 10 | Item No.10-Test Report Charges | - | nos | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_2224080.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid