Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹11.4 L+₹30,884.58 (2.79%)Rejected-Finance NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | L2 | Rejected-Finance Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 3 24 SOUTH STREET ORAKKADU VILLAGE ORAKKADU POST ORAKKADU TAMIL NADU 607103 | ORAKKADU | CUDDALORE | TAMIL NADU | 607103 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ATLANTIC INFRATEK L1 | M/s. New Mohana Constructions L2 |
|---|---|---|---|---|---|
| 1.00Providing BT road @ Anandheri Colony to Anandheri old village field road in Anandheri Panchayat in Poondi Block | |||||
| 2.00 | Clearing scrub jungle including removing from the site disposal by burying or burning etc. complete. | 429.6 | SQM | 6.3 ₹2,706.48 Lowest | 7 ₹3,007.2 |
| 3.00 | Earthwork excavation from side earth and depositing in bank for widening the embankment as per SS20A. including cost , conveyance and all labour charges etc complete | 96.66 | CUM | 140 ₹13,532.4 Lowest | 150 ₹14,499 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 134.25 | CUM | 2,939.5 ₹3,94,627.88 Lowest | 3,000 ₹4,02,750 |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,342.5 | CUM | 19.4 ₹26,044.5 Lowest | 20 ₹26,850 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,342.5 | CUM | 84.2 ₹1,13,038.5 Lowest | 85 ₹1,14,112.5 |
| 7.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 1,342.5 | CUM | 274.25 ₹3,68,180.63 Lowest | 285 ₹3,82,612.5 |
| 8.00 | Collection and Supply of Gravel including cost , conveyance and all labour charges etc complete Side berms | 42.96 | RM | 454 ₹19,503.84 Lowest | 465 ₹19,976.4 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,68,774.16 ₹1,68,774.16 Lowest | 1,73,485.37 ₹1,73,485.37 |
Tender Value
₹11.3 L
EMD Value
₹11,500
Closing Date
16 Oct 2025, 3:00 pmClosed
BDO (VP) POONDI
BDO OFFICE POONDI
Providing BT road at Ananderi Colony to Ananderi Old Village Field road in Ananderi Panchayat in Poondi Block under PMAGY 2022-23.
2025_RDTN_612461_1
767/2023/A7
Open Tender
Civil Works
Item Rate
180 days
BDO OFFICE POONDI
refer tender documents
5 documents required · 5 mandatory
₹0
₹11,500
Yes
18 Nov 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .