| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.9 L+₹21,311 (7.82%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.0 L+₹26,994.75 (9.90%)Rejected-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | L3 | Rejected-Finance L3 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
10 Jan 2024, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Construction of line and Installation of Transformer in Different Places at State Tubewell and Shifting of 11 KV line Under Electricity Distribution Division-IInd, Ayodhya
2024_MVVNL_877793_1
166 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Faizabad
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹3,000
19 Jan 2024
5 Jan 2024
11 Jan 2024
5 Jan 2024
10 Jan 2024
5 Jan 2024
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 70 Km.)
PCC Pole 8.5 Mtr. long
S.T. Pole 11 Mtr. long
ACSR Weasel Conductor
AB Cable (1x16+1x25)
AB Cable 3x50
Distribution Box Single Phase
Transformer 25 KVA
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of PCC/ST Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms
Erection & Commissioning of of Single Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Rect. Back old and Used Conductor
ANCHAL CONSTRUCTION
M/S ALOK CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .