| 1 | L1₹7.2 CrAccepted-AOC VPO JAGRAM BASS TEHSIL BADHRA DISTT CH DADRI 127308 | JAGRAM BASS | CHARKHI DADRI | HARYANA | 127308 | ₹7.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.7 Cr+₹51.1 L (7.11%)Rejected-AOC | ₹7.7 Cr+₹51.1 L (7.11%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹8.0 Cr+₹77.7 L (10.8%)Rejected-AOC HOUSE NO 399 NEAR UNION BANK BARWALA 125121 | HISAR | HARYANA | 125121 | ₹8.0 Cr+₹77.7 L (10.8%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹8.0 Cr+₹85.7 L (11.9%)Rejected-AOC ROHTAK | ROHTAK | HARYANA | 124001 | ₹8.0 Cr+₹85.7 L (11.9%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹8.5 Cr+₹1.3 Cr (17.8%)Rejected-AOC 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | ₹8.5 Cr+₹1.3 Cr (17.8%) | L5 | Rejected-AOC Rejected |
Tender Value
₹8.0 Cr
EMD Value
₹16.1 L
Closing Date
6 Dec 2022, 5:00 pmClosed
ANAND
M/Garh W.S.Divn. Ch-Dadri
Reconstruction of Bridges
2022_HRY_246222_1
202234CF24AD CF4E 4535 99CD 96F935A0DD68140IRR
Open Tender
Civil Works
Works
550 days
MAI KALAN
Reconstruction of 9 Bridges at RD 9.140 km, 10.104 Km, 17.904 Km, 24.017 Km, 25.794 Km , 27.740 km , 28.956 Km ,30.000 Km , 33.660 Km At Satnali Feeder
2 documents required · 2 mandatory
₹20,000
₹16.1 L
Yes
Charkhi Dadri
9 Feb 2023
21 Nov 2022
7 Dec 2022
22 Nov 2022
6 Dec 2022
22 Nov 2022
2 Dec 2022
Amount
[10.34]Providing and laying dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. Through Rate
[11.64.1]Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : 1. New work (two or more coats) over and including water thinnable priming coat with cement primer Through Rate
[11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. Through Rate
[12.1.1.3]Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or dash fastener shall be paid separately). 1.3. Kiln seasoned and chemically treated Hollock wood Through Rate
[17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications Through Rate
[17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications Through Rate
[17.23.1]Water Bound Macadam Grading - II 1. Water Bound Macadam Grading II (without screenings for low volume roads (undesignated) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications Through Rate
[17.25]Prime Coat @ 0.85kg per sqm Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications Through Rate
[17.26.3]Tack Coat 3. Providing and applying tack coat with penetration grade bitumen VG-10 pressure distributor at the rate of 1.0 kg per sqm on the prepared granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications Through Rate
[17.3]Dismantling of flexible pavement by Mechanical Means Bituminous course Through Rate
[17.30.2]Dense Graded Bituminous Macadam with Batch Type HMP 2. Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Through Rate
[17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Through Rate
[17.72]Construction of unreinforced plain cement concrete pavement in M-30 mix design over a prepared sub base with OPC 43 grade conforming to IS:383 mixed with concrete mixer using batch type concrete mixer as per IS:1791, laid in position, compacted with needle vibrator, screed vibrator and plate vibrator, dewatering of free water with vaccum pump, finishing the surface with power floater, finishing to required lines and grades as per drawings and technical clause 1501 of MORTH specifications Through Rate
[27.44.2]Drainage Spouts complete as per drawing no. SD/205 and MoRTandH MoRTandH specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges) 2. For fixing in position Through Rate
[27.51.1]Filler joint 1. Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing & MoRTH Specification (5th Revision, 2013) clause 2604. Through Rate
[27.51.2]Filler joint 2. Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & MoRT&H Specification. Material Rate
[27.51.2]Filler joint 2. Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & MoRT&H Specification. Through Rate
[27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications. Through Rate
[27.51.4]Filler joint 4. Providing and filling joint sealing compound as per drawings and MoRT&H specifications with coarse sand 6 per cent bitumen by weight - 10 mm depth Through Rate
[28.9]`Supplying and installing positive side waterproofing treatment for `Raft Slab` using 4-5mm thick blended polyethylene / polypropylene membrane incorporating a cell mesh, enabling the membrane to mechanically bond with the poured concrete. The membrane shall be supplied with one self-adhesive selvedge to provide sealed laps and comply with British Standard 8102 2009. Membrane shall have 125 years of certificate of durability and Water tightness test. The membrane should have the following typical properties : 1. Resistance to static loading (EN 12730 method B): 15 Kg 2. Tensile Strength (EN 12311-2): L: )18MPa, T: )10MPa 3. Elongation at break (EN 12311-2): L: )800%, T: )600% 4. Elongation at peak load (EN 12311-2): L: )800%, T: )600% 5. Crack Bridging (ASTM C1305): up to 5mm (100 cycles) 6. Durability of water tightness against durability (EN 1296/ EN 1928): Pass 7. Resistance to impact (EN 12691 Method A): 1500mm 8. Puncture Resistance (ASTM E154-08): 672N 9. Resistance to tear (nail shank): EN 12310-1): 720N (Longitudinal) 10. Reaction to fire (EN ISO 11925-2): Pass 11. Joint Strength (EN 12317-2): =220N (Lap) and =150N (Butt) 12. Resistance to Alkali(EN 1847/EN 1928)-Pass Membrane shall be installed over the entire PCC area with standard 80 mm selvedge laps and end laps overlaid as per manufacturer`s instructions. The rates are inclusive of supply and installation of membrane as per manufacturer methodology. The rates are inclusive of surface preparation, injection grouting at honeycombed areas all complete as per manufacturer methodology. ` Through Rate
[32.25]Designing, Providing, installing and fixing factory finished customed design Pregalvanized high tensile steel joists manufactured from G350 Z275 confirming to IS:277-1992, minimum coating of galvanizing 275 gm/sqm, minimum yield stress 35 MPa and minimum tensile strength of 380 MPa placed 1.23 metre apart to support the load of slab etc as per the design and directions of Engineer-in-Charge. Through Rate
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Through Rate
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Through Rate
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Through Rate
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Through Rate
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar Through Rate
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Through Rate
[6.22.2.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.2. All works up to Plinth Level : M-15 grade plain cement concrete. (cement content considered @ 240 kg/cum) Through Rate
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level Through Rate
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns Through Rate
[6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts Through Rate
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform Through Rate
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. Through Rate
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
credit of bricks
Credit of steel
PARMIL KUMAR
M/s Bishan Parkash and Company
DHARAMPAL AND COMPANY
M/S LAXMI CONSTRUCTION CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .