Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹3.1 LAccepted-AOC | L 1 | Accepted-AOC L 1 | |
| 2 | L 2₹3.4 L+₹27,327 (8.73%)Rejected-Finance | L 2 | Rejected-Finance L 2 | |
| 3 | L 3₹3.4 L+₹27,530 (8.79%)Rejected-Finance | L 3 | Rejected-Finance L 3 | |
| 4 | L 4₹3.6 L+₹47,532 (15.2%)Rejected-Finance | L 4 | Rejected-Finance L 4 |
Tender Value
Refer Docs
EMD Value
₹8,035
Closing Date
27 Jun 2024, 3:00 pmClosed
Chief Engineer
VOC Port Authority
Rectification of damage in compound wall at Port Guest House during the flood in VOC Port
2024_VOCPT_198304_1
11CE/RCM BMR/2024-25
Open Tender
Civil Works
Works
60 days
VOC Port Authority
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,035
23 Jul 2024
13 Jun 2024
28 Jun 2024
13 Jun 2024
27 Jun 2024
13 Jun 2024
Amount
Earthwork excavation in trenches for foundation in sand and other loose soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers.
Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of M. Sand (Crushed Stone Sand) & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers.
Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers.
Filling basement with available excavated earth in trenches, plinth, sides of foundation etc., in layers not exceeding 20cm in depth, consolidating and watering etc., complete complying with AISS and as directed by the departmental officers.
Providing Form work including centring, shuttering for foundation footings of columns, mass concrete so as to give a rough finish shuttering and propping etc., complete complying with AISS and as directed by the departmental officers.
Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers.
Brick work in Cement Mortar 1:5 (M. Sand (Crushed Stone Sand)) ( One cement, five M. Sand (Crushed Stone Sand)) using chamber burnt bricks for walls in Ground Floor of the building including cost of all materials, labour, curing etc., complete complying with AISS and as directed by the departmental officers.
Plastering the Brick work 15 mm thick in Cement Mortar 1:3 (Plastering Sand (P-Sand)) (One cement, three Plastering Sand (P-Sand)) for all faces of walls (even and uneven) in all floors upto full height of the building including necessary scaffolding, racking of masonry joints, cleaning, curing etc., complete complying with AISS and as directed by the departmental officers.
White washing with lime powder on new wall surfaces One COAT to give an even shade including cleaning the surfaces, preparaton of wall, cost of lime powder, brushes, scaffolding, etc., complete complying with AISS and as directed by the departmental officers.
Applying One coat of Alkali Resistant Primer and Two coats of APEX - Exterior Emulsion Paint of approved colour and quality over the New wall surface in all floors to give an even shade after thoroughly brushing the surface free from mortar droppings and other foreign matter and also including preparing the surface even and sand paperes smooth including all materials, labour, brushes, scaffolding, etc., complete complying with AISS and as directed by the departmental officers.
Deploying earth moving machinery JCB wherever required for the following works viz., Earthwork excavation, filling, levelling the undulated area, cleaning the vegetation along with roots, removal of unwanted debris / juliflora trees, loading into lorry and for any other works required etc., including cost of diesel, oil, operator charges etc., complete and as directed by the departmental officers.
MARIA ANTONY JUDERAJA
EDDY ENGINEERING
KSR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .