| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC UTTAR PRADESH | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.7 L+₹5,121 (3.10%)Rejected-AOC 0 ISLAMPUR BELDHA DEVIPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | 2 | Rejected-AOC L2 | |
| 3 | 3₹2.0 L+₹29,831 (18.0%)Rejected-AOC 16F 1K NEW MARKET BAMRAULI NEAR BAMRAULI RAILWAY STATION ALLAHABAD UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | 3 | Rejected-AOC L3 |
Tender Value
₹1.7 L
EMD Value
₹2,000
Closing Date
27 Sept 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
58/ETC-II(P)/ 2021-2022
2021_UPTCL_621228_1
58/ETC-II(P)/ 2021-2022
Open Tender
Electrical Works
Item Rate
90 days
Meja-Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE,ETD-NAINI,PRAYAGRAJ
₹2,000
16 Dec 2021
20 Sept 2021
28 Sept 2021
20 Sept 2021
27 Sept 2021
20 Sept 2021
120 days
Amount
132 KV S/s Karchhana
Erection of 01 no 250 KVA 33/0.4 KV Station Transformer by way of shifting /dragging up to plinth ,lifting it by arranging crane/hydra (to be provided by the contractor at his own cost and placing at proper place on 1.5 meter high plinth)
Erection of 03 no ALP and 01 no ABL auxiliary structure with foundation bolt including sorting, shifting from the store room at 132 KV S/s Karchhana.
Fabricating fuse set by way of converting old and used 33KV isolator set (without jaw and blade) by using its channel post insulator etc and providing arrangement for mounting with ALP structure so mounting steel portion of badly damaged jaw with post insulator and fabricating arrangement for tightening fuse wire by way of cutting, shaping and welding.
Complete erection of 33 KV Bus Isolator by assembling its components and adjusting its alignment in respect of proper contacts of jaw and blade for smooth operation of isolators.
Jumpering of 250 KVA 33/0.4 KV T/F through ACSR panther conductor after taking measurement and cutting of pieces for jointing jumpering from 33 KV main bus to 33 KV isolator through PG clamp.
Shifting & loading of drum of 400 mm2 PVC cable at 132 KV S/S Salayakhurd then carriage it from to 132 KV S/s Salayakhurd to Karchhana with the help of vehicle ,and unloading ,shifting it at the working place of switchyard. (Vehicle provided by contractor at his own cost). Distt -25 km approx.
Laying of 400 mm2 power cable from 250 KVA LV bushing to LT switchgear room by excavation of earth for making on 500 mm dip trench, putting 1st class bricks, filling with Ganga sand and back filling of earth properly including the cost of bricks and sand etc.
Terminating the power cable at both end transformer side and L.T. AC Distribution panel end by opening of suitable size of lugs at both sides
Earthing of ALP ,ABL,structure and transformer neutral bushing and its body and power cable half core by using M.S flat(50x6 mm) with ,earthing rod and G.I.wires etc with extending from earthmat by welding , digging and backfilling of earth etc. MS flat,man ,T&P provided by contractor at his own cost.
132 KV S/s Mejaroad Prayagraj
Loading , safe carriage and unloading of 250 KVA ,33/0.4 KV Station transformer from 132 KV S/s Naini complex to 132 KV S/s Karchana prayagraj. All man,T&P, vehical provided by contractor at his own cost. Dist -25 KM.
Erection of 01 no 250 KVA 33/0.4 KV Station Transformer by way of shifting /dragging up to plinth, lifting it by arranging crane/hydra ( to be provided by the contractor at his own cost and placing at proper place on 1.5 meter high plinth).
Erection of 03 no ALP and 01 no ABL auxiliary structure with foundation bolt including sorting, shifting from the store room at 132 KV S/s Karchhana.
Fabricating fuse set by way of converting old and used 33KV isolator set (without jaw and blade) by using its channel post insulator etc and providing arrangement for mounting with ALP structure so mounting steel portion of badly damaged jaw with post insulator and fabricating arrangement for tightening fuse wire by way of cutting, shaping and welding.
Complete erection of 33 KV Bus Isolator by assembling its components and adjusting its alignment in respect of proper contacts of jaw and blade for smooth operation of isolators.
Jumpering of 250 KVA 33/0.4 KV T/F through ACSR panther conductor after taking measurement and cutting of pieces for jointing jumpering from 33 KV main bus to 33 KV isolator through PG clamp.
Shifting & loading of drum of 400 mm2 PVC cable at 132 KV S/S Naini complex then carriage it from to 132 KV S/s Naini complex to 132 KV S/s Meja road with the help of vehicle ,and unloading ,shifting it at the working place of switchyard. (Vehicle provided by contractor at his own cost). Distt -30 km approx.
Laying of 400 mm2 power cable from 250 KVA LV bushing to LT switchgear room by excavation of earth for making on 500 mm dip trench, putting 1st class bricks, filling with Ganga sand and back filling of earth properly including the cost of bricks and sand etc.
Terminating the power cable at both end transformer side and L.T. AC Distribution panel end by opening of suitable size of lugs at both sides
Earthing of ALP, ABL, structure and transformer neutral bushing and its body and power cable half core by using M.S flat(50x6 mm) with, earthing rod and G.I. wires etc with extending from earthmat by welding , digging and backfilling of earth etc. MS flat man, T&P provided by contractor at his own cost.
132 KV S/s Naini complex
Erection of 01 no 250 KVA 33/0.4 KV Station Transformer by way of shifting /dragging up to plinth ,lifting it by arranging crane/hydra (to be provided by the contractor at his own cost and placing at proper place on 1.5 meter high plinth).
Complete erection of 33 KV Bus Isolator by assembling its components and adjusting its alignment in respect of proper contacts of jaw and blade for smooth operation of isolators.
Jumpering of 250 KVA 33/0.4 KV T/F through ACSR panther conductor after taking measurement and cutting of pieces for jointing jumpring from 33 KV main bus to 33 KV isolator through PG clamp.
Terminating the power cable at both end transformer side and L.T. AC Distribution panel end by opening of suitable size of lugs at both sides
Earthing of ALP, ABL, structure and transformer neutral bushing and its body and power cable half core by using M.S flat (50x6 mm) with,earthing rod and G.I.wires etc with extending from earthmat by welding, digging and backfilling of earth etc. MS flat, man, T&P provided by contractor at his own cost.
Sorting /loading of equipment structure from EFU naini Prayagraj to the vehicle .
Carriage of above equipment structure from EFU naini to substation mentioned on sr no A & B.vehical and man power provided by contractor at his own cost.distt apox-50 KM
Unloading /stacking of equipment structure parts at substation mentioned on sr no 1 &2.
M/S SHIVA CONSTRUCTION
R.S.ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .