| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Rejected-Technical JHARKHAND | - | Rejected-Technical Non Responsive |
Tender Value
₹92.4 L
EMD Value
₹1.9 L
Closing Date
17 Apr 2026, 5:00 pmClosed
ZILA ABHIYANTA LATEHAR
ZILA ABHIYNATA OFFICE LATEHAR
Construction of Bridge at Simarbothwa Nala at Village- Darha GP- Darha, Block- Bariyatu, District- Latehar
2026_ZPLAT_112364_1
ZP/LATEHAR/21/2025-26/ Gr_01 (4th call)
Open Tender
Civil Works - Bridges
Percentage
240 days
DARHA BARIYATU
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.9 L
3 Oct 2026
4 Apr 2026
20 Apr 2026
4 Apr 2026
17 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,
backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary Soil | - | M3 | 231.55 | - |
| 2 | Soft Rock | - | M3 | 540.28 | - |
| 3 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M-20 | 363.24 | M3 | - | - |
| 4 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M-20 | 181.24 | M3 | - | - |
| 5 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M-20 | 7.84 | M3 | - | - |
| 6 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications | - | NO | - | - |
| 7 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification | 212.25 | M3 | - | - |
| 8 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 using batching plant transite mixer and concrete Pump | 65.42 | M3 | - | - |
| 9 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications | 9.81 | M3 | - | - |
| 10 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. | 39.02 | M | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Group_21.pdf
Tender Documents • 0.32 MB
BOQ_151713.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .