| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹7.3 L (5.52%)Admitted-Finance | ₹1.4 Cr+₹7.3 L (5.52%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GVR ASSOCIATES L1 | N.Rajasekaran L2 |
|---|---|---|---|---|---|
| 1.00Part 1: Strengthening of the Road from Vedathiri Nagar Road KM 0/0 - 2/2 Estimate Amount Rs.78.20 lakhs | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 2,640 | Sqm | 4.1 ₹10,824 Lowest | 5 ₹13,200 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 2,756.25 | cum | 15.31 ₹42,198.19 Lowest | 20 ₹55,125 |
| 4.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 5.00 | Bell mouth | 471.09 | cum | 1,793.04 ₹8,44,683.21 Lowest | 1,793.04 ₹8,44,683.21 Lowest |
| 6.00 | Km 1/0 - 2/00 | 468.75 | cum | 1,793.04 ₹8,40,487.5 Lowest | 1,793.04 ₹8,40,487.5 Lowest |
| 7.00 | Km 2/0 - 2/2 | 93.75 | cum | 1,793.04 ₹1,68,097.5 Lowest | 1,793.04 ₹1,68,097.5 Lowest |
| 8.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 8,268.75 | Sqm | 56.44 ₹4,66,688.25 Lowest | 70 ₹5,78,812.5 |
| 9.00Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | |||||
| 10.00 | Km 0/0 - 1/00 | 8,268.75 | sqm | 11.6 ₹95,917.5 Lowest | 15 ₹1,24,031.25 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Nov 2020, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGULv
THE PROJECT DIRECTOR DRDA, DINDIGULv
Dindigul District TNRRIS 2020-2021 Additional - Road works Dindigul block TN-05-43
2020_RDTN_184694_1
DIPR/4102/TENDER/2020 TN-05-43 Dindigul Block
Open Tender
Civil Works - Roads
Item Rate
180 days
DINDIGUL
Dindigul District TNRRIS 2020-2021 Additional - Road works Dindigul block TN-05-43
5 documents required · 5 mandatory
₹0
₹1.4 L
THE PROJECT DIRECTOR DRDA, DINDIGULv
17 Dec 2020
10 Nov 2020
27 Nov 2020
10 Nov 2020
27 Nov 2020
10 Nov 2020
20 Nov 2020
Amount
Part 1: Strengthening of the Road from Vedathiri Nagar Road KM 0/0 - 2/2 Estimate Amount Rs.78.20 lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Bell mouth
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Supply and fixing of HM stone
Supply and fixing of KM stone
Provision for Name board charges
Provision for Sign board charges
Construction of Drainage CH 0/500 - 0/400
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and Erecting Centering for Drainage side with cost and conveyance of all materials and all labour charges etc., completed.
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1.1.5.3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.
Construction of Drainage CH 1/0 - 1/2
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and Erecting Centering for Drainage side with cost and conveyance of all materials and all labour charges etc., completed.
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1.1.5.3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2: Strengthening of the Road from Indira Nagar to Chennamanaickenpatty Road KM 1/0 - 3/0 Estimate Amount Rs.55.96 lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Construction of Granular sub base by providing and laying spreading and compacting graded stone aggregate to Wet mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Supply and fixing of HM stone
Supply and fixing of KM stone
Provision for Name board charges
Provision for Sign board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.Rajasekaran
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .