Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
23 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
POWER
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N crores or V, whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI. No Technical and Financial credentials are required for tenders having advertised value up to Rs 50 lakh. Tenderer must fulfil Clause 10 of GCC: April 2022 with latest ACS.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar nature of work shall mean: "As specified in IREPS window given below." (b)(1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories o f work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. Special Note:- Tenderer must fulfil Clause 10 of GCC: April 2022 with latest ACS.
Defination of Similar Work :- Any Type of Electrical work
6 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
In support of their credentials, the Tenderers should submit along with their tenders document - List of works completed in the last three financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, date of actual start, actual completion and final value of contract. Supportive documents/certificates from the organizations with whom worked/are working should be enclosed. A proper balance sheet for turn over from the paying / contracting authorities with list of contractual payment made to the party during qualifying period should be enclosed along with offer for verification.
Tenderer is advised that the Contractual Turnover shall be clearly mentioned in Annexure-VIB (containing Annual Contractual Turnover Data for the Previous 3/4 Years) and Audited Balance Sheet.
Work experience certificate issued by Central Govt. /State Govt./Semi Govt. Organizations/Authorities, PSUs Govt. of India/State Govt. shall only be considered .Certificate issued from Private Individual/Private firms will not be considered
General Service Electrification works for provision of Stabling lines at Ujjain NC yard/Loco yard, Relocation of PQRS siding lines at Ujjain Loco Yard, Provision of Additional loop line at Chintaman Ganesh Station yard of Ratlam Division of Western Railway, in connection with Simhastha 2028.
EL-C-RTM-2026-02-T
EL-C-RTM-2026-02-T
Open
Works - General
18 Months
Ratlam, Madhya Pradesh
₹0
₹3.7 L
23 Jun 2026
2 Jun 2026
9 Jun 2026
117 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,86,15,498.24 | ||
| — | 124.00 | — | — | ||
| Supply of material, erection, testing & commissioning of Battery charging boxes (EFT) complete. | — | — | — | 4,23,114.04 | |
| — | 4.00 | — | — | ||
| Supply of material , erection , testing & commissioning of battery charger complete 200 Amp. | — | — | — | 6,36,451.56 | |
| — | 68.00 | — | — | ||
| Supply erection ,testing & commissioning of AC coach Charging & pre cooling facilities. | — | — | — | 10,51,854.6 | |
| — | 264.00 | — | — | ||
| Design Supply, fixing and commissioning of the LED based pit/inspection light fitting 18watt, input voltage 48 V AC, Size of light fitting & fixture should be installation and fixing & grouting work should be done as per site requirement. | — | — | — | 8,30,607.36 | |
| — | 18.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of step down transformer 1 Ph. 5KVA 240 Volts AC and out put 48 VAC with Volt meter and Ammeter complete with Enclosure suitable for pit/inspection light and catwalk light including connection etc as per site requirement. | — | — | — | 2,70,000 | |
| — | 192.00 | — | — | ||
| Supply erection ,testing & commissioning of 22 ,110V flood light, suitable for examination/pit line IP 65 outdoor type. | — | — | — | 6,56,188.8 | |
| — | 13.00 | — | — | ||
| Supply erection ,testing & commissioning of step down transformer 03KVA Three phase 415/110V with wiring. | — | — | — | 98,204.6 | |
| — | 1080.00 | — | — | ||
| Supply of material with fabrication and erection of MS Channel 100X50X6 mm with hardwares. | — | — | — | 2,80,594.8 | |
| — | 514.00 | — | — | ||
| Supply of material , erection, testing & commissioning of cable junction box with bus bar. | — | — | — | 11,82,492.98 | |
| — | 358.00 | — | — | ||
| Supply of material , erection, testing & commissioning of cable junction box with MCB S/P. | — | — | — | 4,15,208.4 | |
| — | 384.00 | — | — | ||
| Supply of material , erection, testing & commissioning of cable junction box with cut out/ bus bar. | — | — | — | 3,17,564.16 | |
| — | 6.00 | — | — | ||
| Supply , erection , testing & commissioning of 16 Mt. High mast Complete with head frame to install Luminaries and canopy complete with all accessories. | — | — | — | 8,67,803.4 | |
| — | 48.00 | — | — | ||
| Supply , erection , testing & commissioning of LED High Bay 250 Watt Luminaries. | — | — | — | 7,53,152.64 | |
| — | 6.00 | — | — | ||
| Fabrication, supply and erection of GI pipe fencing around the high mast, with 8 mast numbers B classGI pipes of 50mm dia., as per specifications in annexure. | — | — | — | 1,27,796.76 | |
| — | 68.00 | — | — | ||
| Supply , erection , testing & commissioning of 5Mtr Octagonal pole with pit foundation ,Double arm bracket including connection. | — | — | — | 7,21,513.32 | |
| — | 24.00 | — | — | ||
| Supply , erection , testing & commissioning of 5Mtr Octagonal pole with pit foundation ,single arm bracket including connection. | — | — | — | 2,38,896 | |
| — | 116.00 | — | — | ||
| Supply and fixing of LED street light 70W including connection. | — | — | — | 4,51,313.85 | |
| — | 200.00 | — | — | ||
| Supply and fixing of Perforated GI cable Tray 300x50mm. | — | — | — | 2,05,934 | |
| — | 6660.00 | — | — | ||
| Supply and fixing of Perforated GI cable Tray 100x50mm. | — | — | — | 28,49,281.2 | |
| — | 4700.00 | — | — | ||
| Supply of materials & erection of Perforated GI Tray with cover 50x50 mm. | — | — | — | 20,29,648 | |
| — | 2.00 | — | — | ||
| Supply & fixing of Control panel 400 Amp. Cap. Complete with MCCB , change over switch with. | — | — | — | 4,46,222.39 | |
| — | 4.00 | — | — | ||
| Supply & fixing of Control panel 200A Complete with MCCB As per specification. | — | — | — | 3,02,753.28 | |
| — | 8.00 | — | — | ||
| Supply and fixing of Control panel with MCCB& MCB's etc. | — | — | — | 1,20,645.76 | |
| — | 7.00 | — | — | ||
| Supply & fixing of Distribution box 63A complete. | — | — | — | 86,303 | |
| — | 32.00 | — | — | ||
| Supply of material , erection, testing & commissioning of GI pipe earthing arrangement. | — | — | — | 67,319.68 | |
| — | 320.00 | — | — | ||
| Supply of GI Strip 25mm x 6mm for earthing. | — | — | — | 13,330.13 | |
| — | 2.00 | — | — | ||
| Supply, fixing, testing and commissioning of On load manual change over with enclouser of cap. 200A as per specification. | — | — | — | 44,300 | |
| — | 3.00 | — | — | ||
| Supply of material , erection, testing & commissioning of Auto change over switch 63 Amp. | — | — | — | 19,916.73 | |
| — | 3800.00 | — | — | ||
| Supply & Laying of un armoured XLPE cable Single core 120 sqmm. | — | — | — | 4,40,990 | |
| — | 2000.00 | — | — | ||
| Laying of 4core 240sqmm UGAC with heat resisting insulation PVC Insulated and strip type Sheathed Armoured Aluminum Conductor cable with 1x8SWG GI wire in existing trench/Pipe/ in air | — | — | — | 44,060 | |
| — | 3000.00 | — | — | ||
| Laying of 4core 120sqmm UGAC with heat resisting insulation PVC Insulated and strip type Sheathed Armoured Aluminum Conductor cable with 1x8SWG GI wire in existing trench/Pipe/ in air | — | — | — | 66,090 | |
| — | 3000.00 | — | — | ||
| Laying of 4core 70sqmm UGAC with heat resisting insulation PVC Insulated and strip type Sheathed Armoured Aluminum Conductor cable with 1x8SWG GI wire in existing trench/Pipe/ in air. | — | — | — | 66,090 | |
| — | 7000.00 | — | — | ||
| Laying of four Core 25sqmm UGAC with heat resisting insulation PVC Insulated and strip type Sheathed Armoured Aluminum Conductor c a b l e with 1x8SWG GI wire in existing trench/Pipe/ in air | — | — | — | 1,54,210 | |
| — | 6500.00 | — | — | ||
| Laying of four Core 16sqmm UGAC with heat resisting insulation PVC Insulated and strip type Sheathed Armoured Aluminum Conductor c a b l e with 1x8SWG GI wire in existing trench/Pipe/ in air | — | — | — | 1,43,195 | |
| — | 50.00 | — | — | ||
| Supply of double walled corrugated HDPE Pipes of size 120mm Outer dia &103mm inner dia | — | — | — | 78,859 | |
| — | 3310.00 | — | — | ||
| Supply and laying of 65 mm dia. DWC pipe complete. | — | — | — | 1,89,232.7 | |
| — | 2900.00 | — | — | ||
| Digging of trench. | — | — | — | 3,57,599 | |
| — | 1110.00 | — | — | ||
| Digging of Pacci trench. | — | — | — | 3,47,796.3 | |
| — | 245.00 | — | — | ||
| Providing 100mm dia. GI/MS Pipe under track by pushing method. | — | — | — | 4,07,192.45 | |
| — | 260.00 | — | — | ||
| Supply of material & wiring of light point/ceiling rose point by 1.5mm² copper PVC cable casing-capping pipe/PVC pipe with earth wire without switch. | — | — | — | 34,595.6 | |
| — | 40.00 | — | — | ||
| Supply of material & wiring of ceiling rose/ light point by 1.5mm² copper PVC cable casing-capping pipe/PVC pipe with earth wire. | — | — | — | 12,695.2 | |
| — | 8.00 | — | — | ||
| Supply & fixing of Switch board 8-12 Module as per specification. | — | — | — | 1,154.72 | |
| — | 8.00 | — | — | ||
| Supply & fixing of Switch board 03-04 Module as per specification. | — | — | — | 461.6 | |
| — | 8.00 | — | — | ||
| Supply & fixing of 6Amp Cap. Plug socket 5Pin on existing board including connection. | — | — | — | 494 | |
| — | 8.00 | — | — | ||
| Supply & fixing of 6Amp Cap. Plug socket 5Pin on separate board with wiring by copper cable PVC 2.5mm² including connection. | — | — | — | 2,262.48 | |
| — | 8.00 | — | — | ||
| Supply & fixing of 6/16 Amps Cap. Power Plug socket 5Pin on Separate board with wiring by Copper cable PVC 2.5mm² including connection. | — | — | — | 2,584.72 | |
| — | 8.00 | — | — | ||
| Supply & fixing Double pole MCB On board including connection. | — | — | — | 2,658.24 | |
| — | 100.00 | — | — | ||
| Supply of materials & wiring of sub main by copper cable PVC 2x2.5mm² with earth wire in PVC casing-capping/PVC pipe including connection. | — | — | — | 4,500 | |
| — | 100.00 | — | — | ||
| Supply of materials & wiring of sub main by copper cable PVC 2x4mm² with earth wire in PVC casing-capping/PVC pipe including connection. | — | — | — | 9,967 | |
| — | 100.00 | — | — | ||
| Supply and laying PVC Truncking system 50X50mm for sub main wiring | — | — | — | 22,230 | |
| — | 5.00 | — | — | ||
| Supply & Fixing of LED Tube 18/20W Light fitting including connection. | — | — | — | 3,583.45 | |
| — | 200.00 | — | — | ||
| Supply & Fixing of LED Tube 40W Light fitting including connection | — | — | — | 3,63,444 | |
| — | 4.00 | — | — | ||
| Supply , erection , testing & commissioning of LED High Bay 120 Watt Luminaries. | — | — | — | 49,225.92 | |
| — | 4.00 | — | — | ||
| Supply & fixing of LED Area light 60-70W including connection. | — | — | — | 18,697.6 | |
| — | 45.00 | — | — | ||
| Supply & fixing of Brushless DC (BLDC) Motor Celling Fan, ISI marked, sweep size: 1200/1400 mm with electronic fan regulator | — | — | — | 1,55,183.4 | |
| — | 4.00 | — | — | ||
| Supply & fixing of exhaust fan 300 mm sweep including connection. | — | — | — | 5,822.2 | |
| — | 2.00 | — | — | ||
| Supply & fixing of exhaust fan 250 mm sweep including connection . | — | — | — | 3,019.22 | |
| — | 50.00 | — | — | ||
| Design, manufacture, Erection and installation of display of wall / hanging /floor mounting type LED illuminated sign / direction boards in full elliptical / half elliptical / semi elliptical shape. The display sheet shall be of unbreakable 040 translucent polycarbonate sheet of 2 mm thickness. The text / graphics matter visibility shall be less than 160 deg. The approved color text and graphics shall be printed / router cut on mono mericcalendared vinyl of 70 m thickness and shall be firmly pasted on display sheets. The mounting arrangement shall be hanging, wall mounting, ceiling mounting, pole mounting or floor mounting and as per site requirement. The signage shall have the integral mounting arrangements with sturdy structural frame and ACP cladding on the back side of the signage to avoid rusting and entry of dust. The LED board shall have uniform illumination with 4-8 W/ sq. ft and with brightness more than ambient light. Suitable size end cap of 1.5mm thick SS 304 should be provided. | — | — | — | 1,19,193 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
ACS1to11_compressed.pdf
ATTACHMENT
tenderdocument202602T02062026.pdf Tender document
ATTACHMENT
tenderdocument202602T02062026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .