| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹10.6 LAdmitted-Finance PO DHAN SINGH WALA GONIANA DISTT BATHINDA | GONIANA | BATHINDA | PUNJAB | ₹10.6 L | L2 | Admitted-Finance |
| 3 | L3₹10.6 LAdmitted-Finance | ₹10.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S H.S. CONSTRUCTIONS, BATHINDA L2 | P K TRADERS L3 | DB CONTRACTORS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 142.85 | Cum | 163 ₹23,284.55 | 164 ₹23,427.40 | 157 ₹22,427.45 |
| 2.00 | Dismantling: Lime concrete,cement concrete of 1:6:12 or leaner mix. | 3.36 | Cum | 370 ₹1,243.20 | 368 ₹1,236.48 | 355 ₹1,192.80 |
| 3.00 | Dismantling: Reinforced cement concrete. | 14.47 | Cum | 2,000 ₹28,940 | 1,990 ₹28,795.30 | 1,901 ₹27,507.47 |
| 4.00 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 81.84 | Sqm | 188 ₹15,385.92 | 187 ₹15,304.08 | 181 ₹14,813.04 |
| 5.00 | Centring and shuttering for columns (Square or rectangular or poly gonal in plain) | 76.04 | Sqm | 425 ₹32,317 | 425 ₹32,317 | 411 ₹31,252.44 |
| 6.00 | Cement Concrete 1:6:12 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 14.49 | Cum | 2,292 ₹33,211.08 | 2,292 ₹33,211.08 | 2,215 ₹32,095.35 |
| 7.00 | Cement Concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 1.2 | Cum | 2,286 ₹2,743.20 | 2,287 ₹2,744.40 | 2,209 ₹2,650.80 |
| 8.00 | Cement Concrete 1:2:4 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 12.48 | Cum | 2,386 ₹29,777.28 | 2,387 ₹29,789.76 | 2,305 ₹28,766.40 |
| 9.00 | Reinforced cement concrete M20 mechanically batch mixed using batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 18.56 | Cum | 2,762 ₹51,262.72 | 2,763 ₹51,281.28 | 2,669 ₹49,536.64 |
| 10.00 | Reinforced cement concrete M20 mechanically batch mixed using batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure | 5.43 | Cum | 3,431 ₹18,630.33 | 3,432 ₹18,635.76 | 3,315 ₹18,000.45 |
Tender Value
₹12.6 L
EMD Value
₹25,200
Closing Date
10 Apr 2026, 3:00 pmClosed
Sr.Xen CWD PSTCL Patiala
O/o Sr XEN Civil Works Division Flat no. 28, Officers Flat Complex, PSTCL , Near 23 No. Fatak, Patiala
WORK OF CONSTRUCTION OF 220 KV BUS COUPLER AT 220 KV S/S BAGHAPURANA
2026_POWER_163905_1
57/2025-26
Open Tender
Civil Works
225 days
220 KV Substation Baghapurana
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,200
Yes
21 Apr 2026
17 Mar 2026
13 Apr 2026
17 Mar 2026
10 Apr 2026
17 Mar 2026
Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Dismantling: Lime concrete,cement concrete of 1:6:12 or leaner mix.
Dismantling: Reinforced cement concrete.
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centring and shuttering for columns (Square or rectangular or poly gonal in plain)
Cement Concrete 1:6:12 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement Concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement Concrete 1:2:4 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type
Reinforced cement concrete M20 mechanically batch mixed using batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth
Reinforced cement concrete M20 mechanically batch mixed using batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure
First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth.
First Class Burnt Brick Work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level.
115mm thick brick wall in cement sand mortar 1:4 without reinforcement in foundations and plinth
Conglomerate floor 25mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material
Conglomerate floor 50mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material
12.5 mm thick cement plaster 1:3
12.5 mm thick cement plaster 1:4
12.5 mm thick cement plaster 1:5
20mm thick Cement Plaster 1:4 in two coats work
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete (Labour Rate)
Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications.
Cable Racks of varios sizes
Providing and Fixing Angle iron Nozzing 50x50x3 for cable trenches
Suppling and Hoisting of Ferro Cement Trench Covers of size 1'9" x 2'6" T-4 Type
Suppling and Hoisting of Ferro Cement Trench Covers of size 2'2" x2'2" T-3 type
Cement Slurry of cement to sand ratio 1:6 with cement content not less than 150kg/100 sqm
Suppling & laying of gravel as per AOR
Concrete 1:5:10 with crushed stone & 25 mm Stone Aggregate Laying PCC Flooring as per AOR
P&F Template along with foundation bolts as per drawing
Recovery of steel scrap
Carriage of material rates
Cement
Steel
Fine sand
Carriage and Difference of material rates
12/13.2 mm Crushed Bajri
Bricks
10mm/ 11.20 mm Crushed Bajri
Coarse Sand
Stone Metal 40mm
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
2TandCBuscouplerbaghapurana.pdf
Tender Documents • 0.54 MB
3techspec.pdf
Tender Documents • 2.61 MB
4220kVBusCouplerDNITBaghapurana.pdf
Tender Documents • 1.22 MB
BOQ_331947.xls
BOQ • 0.36 MB
1MainpageBuscouplerBaghapurana.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid