Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹12,250
Closing Date
30 Jun 2026, 10:00 pm
Similar tender results from the same govt authority in the past 3 years.
Directorate of Municipal Administration
Sinking of borewel For drinking water supply at Idaga Maidan Ward No 08
306623
DMA/2024-25/OW/WORK_INDENT28589
Open
Water supply/sewage lines
DMA Town Panchayat Lokapur
4 documents required · 4 mandatory
₹500
₹12,250
15 Jun 2026
15 Jun 2026
30 Jun 2026
Sinking of borewel For drinking water supply at Venkateshwar Nagar
TOWN PANCHAYAT,LOKAPUR
[Paragraph 130 (a) of the Karnataka Public Works Department Code]
Sanctioned Estimate No. :
Fund Head : general fund
Estimate framed in the office of the ENGINEERING SECTION,TOWN PANCHAYAT LOKAPUR
Estimate for the work
Sinking of borewel For drinking water supply at Venkateshwar Nagar
Estimated Cost Lakhs
Administratively approved under No. Date :
Technically sanctioned under No. Date :
Estimate prepared by : Sri Prashant.A.Patil JE
Checked by : Sri
Junior Engineer Chief Officer
Town Panchayat Town Panchayat
Lokapur Lokapur
¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ
¸ÁªÀiÁ£Àå ªÀgÀ¢
Sinking of borewel For drinking water supply at Venkateshwar Nagar
¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ ªÁå¦ÛAiÀÄ°èæ UÁæªÀÄ ¥ÀAZÁAiÀÄvÀ¢AzÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ zÀeÉðUÉ G£ÀßwPÀgÀtUÉÆÃArzÀÄÝ CzÀgÀAvÉ ¸ÁªÀðd¤PÀjUÉ ¤gÀAvÀgÀªÁV ªÀÄÆ®¨sÀÆvÀ ¸Ë®¨sÀåUÀ¼À£ÀÄß PÀ°à¸ÀĪÀzÀÄ ¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ DzÀå PÀvÀåðªÀåªÁVgÀÄvÀÛzÉ ¸À£ï ªÀiÁ£Àå DqÀ½vÁ¢üPÁjUÀ¼ÀÄ, ¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ gÀªÀgÀÄ QæAiÀiÁ AiÉÆd£É gÀƦ¹ AiÉÆd£ÉUÉ ªÀÄAdÆgÁwAiÀÄ£ÀÄß ¤rzÀÄÝ EgÀÄvÀÛzÉ ,CzÀgÀAvÉ __F ªÉÄð£À__PÁªÀÄUÁjAiÀÄ£ÀÄß PÉåUÉÆ¼ÀÄîªÀzÀÄ ¸ÁªÀðf¤PÀgÀ »vÀ zÀȶ׬ÄAz Cw CªÀ±ÀåPÀªÁVzÀÄÝ , PÁgÀt CAzÁdÄ ¥ÀwæPAiÀÄ£ÀÄß vÀAiÀiÁj¹zÀÄÝ ¸À£ï 2023-24 ¸Á°£À ¯ÉÆPÉÆ¥ÀAiÉÆV E¯ÁSÉ(«zÀÄåvï/¹«í¯ï)/ PÁªÀÄUÁjUÀ¼À KPÀgÀÆ¥À C£ÀĸÀÆa zÀgÀ¥ÀnÖ : 2023-24 ¸ÀÀA¥ÀÅl – 5/ºÉ¸ÁÌA zÀgÀUÀ¼À£ÀÄß C¼ÀªÀr¹PÉÆÃAqÀÄ CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß vÀAiÀiÁj¹zÀÄÝ vÁAwæPÀ C£ÀÄªÉÆÃzÀ£ÉUÁV ªÀÄvÀÄÛ ¤AiÀĪÀiÁ£ÀĸÁgÀ F-¥ÀæPÀÆågÀªÉÄAl mÉAqÀgÀ PÀgÉAiÀÄ®Ä ªÀÄAr¹zÉ.
Estimate Cost : Lakhs
¸ÀzÀj CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß ¸À£ï 2024-25 ¸Á°£À ¯ÉÆPÉÆ¥ÀAiÉÆV E¯ÁSÉ(«zÀÄåvï/¹«í¯ï)/zÀgÀ¥ÀnÖAiÀÄ zÀgÀUÀ¼À£ÀÄß ¥ÀjUÀt¹ vÀAiÀiÁj¸À¯ÁVzÉ.
QjAiÀÄ C©üAiÀÄAvÀgÀgÀÄ ªÀÄÄSÁå¢üPÁjUÀ¼ÀÄ
¥ÀlÖt ¥ÀAZÁAiÀÄvÀ, ¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ,¯ÉÆÃPÁ¥ÀÆgÀ
TOWN PANCHAYAT,LOKAPUR
Sinking of borewel For drinking water supply at Venkateshwar Nagar
(PARA 133(i) OF K.P.W.D.)
i) Certified that Prashant A Patil Junior Engineer Town Panchayat Lokapur have personally visited the work spot, and prepared the estimate using sanctioned schedule of rates and providing most economical and safe way of executing the work.
ii) Certified that the provisions made in this estimate are not provided in any of the sanctioned estimate.
Town Panchayat Lokapur Town Panchayat Lokapur
TOWN PANCHAYAT,LOKAPUR
CHECK LIST ACCOMPANYING THE ESTIMATE
1) Face Sheet duly filled up with all relevant particulars and signed by all the concerned officers/officials is enclosed. : Yes
2) Whether administrative approval is accorded or not. If accorded the letter No. & date to be furnished. : Yes
3) General Report with all details highlighting the importance of work is enclosed or not. : Yes
4) Whether estimate is prepared as per current S.R. or not. : Yes
5) Abstract Sheet with details of specifications as per C.S.R. with all leads and lifts for all the items, is enclosed or not. : --
6) Detailed Measurement Sheet with specification as per C.S.R. with all leads and lifts, is enclosed or not. : Yes
7) Whether the approved quarry maps for different materials of construction are enclosed or not. : --
8) Rate Analysis with detailed specifications as per C.S.R. with necessary leads and lifts by adding difference in issue rate of materials duly signed for each item is enclosed or not. : --
9) If market rate is considered in the rate analysis the procedure followed as per rules is to be furnished in the form of certificate for such items with details. : --
10) Co-efficient considered in the estimate are one and the same with reference to schedule of rates approved. : No
11) Lead Statement based on approved quarry map is enclosed or not. : --
12) Measurements considered in the estimate are as per type plans approved by the competent authority is enclosed or not. : Yes
13) Whether trial pit results approved by competent authority are enclosed or not. : --
14) Approved plan, elevation and foundation details are enclosed or not : --
15) Whether provision is made in the estimate for draining away water from the building/road/bridges etc. : --
16) Whether provision is made for electricity, water supply, drainage and other items. : --
17) Whether required certificates as per conduct rule is enclosed or not. : Yes
18) Whether the work is included in programme of works or not. :
19) Whether the estimate has been neatly typed and submitted in duplicate or not. : Yes
TPC Lokapur TPC Lokapur
Town Panchayat,Lokapur
Sinking of borewel For drinking water supply at Idaga Maidan Ward No 08
SN SOR Name of item Unit Rate No L B D Qty Amount
1 O040A Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or
Basic Rate 5141
Area weightage @ 3%
2 O020 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete )
Area weightage @ 3%
0.0 O020A Borewell depth of 0 to 50 m m 1 50 1 1
Area weightage @ 3%
0.0 O020B Borewell depth of 50 to 100 m m 0.0 1 50 1 1
Area weightage @ 3%
0.9 O020C Borewell depth of 100 to 150 m m 0.0 1 50 1 1
Area weightage @ 3%
0.9 O020D Borewell depth of 150 to 200 m m 0.0 1 50 1 1
Area weightage @ 3%
0.0 O010E Borewell depth of 200 to 250 m m 0.0 1 50 1 1
Area weightage @ 3%
0.0 O010F Borewell depth of 250 to 300 m m 0.0 1 100 1 1 100
3 Supply of ISI mark 175mm nominal bore,plain and steel casing pipegrade of steel Fe 410 of wall thickness conforming to IS 4270-2001 andlatest ammendments, electrical resistance welded steel tubes, materialand conforming to IS 1387-1993 and manufactured by basic openhearth electric or basic oxygen process in random length of 5-7m bothends.threaded conforming to IS 554-1985 one end fixed with socketconforming to IS 4270-2001 and the other end with screwed pipes allshall be responsibaly free from defects. The tubes shall be responsiblestraight end should be with ISI marking weighing 25.10kg/m.pricesinclude Collar-Medium duty.
Basic Rate 1991
Area weightage @ 3%
3rd Party Report PAPER CHARGES 2150
Add for Rond Off
Junior Engineer Chief Officer
Town Panchayat Lokapur Town Panchayat Lokapur
SN Name of item Unit Rate Qty Amount
1 Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Each 5295.23 4 21180.92
0.0 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 0 to 50 m m 0.9 50 14935
0.0 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete )Borewell depth of 50 to 100 m m 0.0 50 18746
0.9 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete )Borewell depth of 100 to 150 m m 0.0 50 19900
0.9 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete )Borewell depth of 150 to 200 m m 0.0 50 23123.5
0.0 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete )Borewell depth of 200 to 250 m m 0.0 50 27100
0.0 Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete )Borewell depth of 250 to 300 m m 0.0 24 13776
3 Supply of ISI mark 175mm nominal bore,plain and steel casing pipegrade of steel Fe 410 of wall thickness conforming to IS 4270-2001 andlatest ammendments, electrical resistance welded steel tubes, materialand conforming to IS 1387-1993 and manufactured by basic openhearth electric or basic oxygen process in random length of 5-7m bothends.threaded conforming to IS 554-1985 one end fixed with socketconforming to IS 4270-2001 and the other end with screwed pipes allshall be responsibaly free from defects. The tubes shall be responsiblestraight end should be with ISI marking weighing 25.10kg/m.pricesinclude Collar-Medium duty. m 2050.73 110 225580.3 70574.41
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Borewell at Idaga Maidan.xls
Technical Information / Worksheet • 0.20 MB
RESOLUTION.pdf
Tender Document • 3.65 MB
28589.docx
Tender Document • 1.59 MB
Download all tender documents and submit your bid