| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.8 L+₹9,532.62 (1.10%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹8.8 L
EMD Value
₹9,000
Closing Date
8 Mar 2024, 3:00 pmClosed
Block Development Officer (VP)
BDO Office Mathur
Krishnagiri Dt Mathur Block AGAMT II 2024-25 1 Work of Construction of Threashing floor at Olaipatti Village in Salamarathupatti Panchayat Package No MTR 60
2024_RDTN_437992_1
RocNo6477_2023_R10dt29_02_2024
Open Tender
Civil Works - Others
Item Rate
180 days
BDO Office Mathur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
Yes
BDO Office Mathur
21 Sept 2024
4 Mar 2024
8 Mar 2024
4 Mar 2024
8 Mar 2024
4 Mar 2024
4 Mar 2024
Amount
1.Providing Threshing Floor (15 X 15m) at Olaipatti Village H/O Salamarathupatti.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.)
Supply and fixing of MS pipe 50mm including cost and conveyance of all materials & labour charges etc., complete
Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers.
Provision for writing Name board
Provision for bituman pad Charges
Provision for Photographics charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Periyanayagi enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .