Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-Finance | ₹5.5 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹5.5 LRejected-Finance | ₹5.5 L | L2 | Rejected-Finance L2 bidder |
Tender Value
₹5.2 L
EMD Value
₹10,500
Closing Date
12 Jan 2026, 6:00 pmClosed
Executive Engineer
HPPWD DIVISION KOTKHAI
Improvement of Link Road from Darkoti Road to Krarali Kiari HB 0/00 to 1/816 C/o B/wall at various damaged / sliding RDs between Km 0/200 to 1/800
2026_PWD_125021_16
PW-KD-E-Tender/2025-26-9212-16 dtd 30-12-2025
Open Tender
Civil Works - Roads
45 days
Kotkhai
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹10,500
16 Jun 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing & making Gabion structure with mechanically woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012 ,MORTH Clause 2500, of requred size, Mesh Type 10x12 (D=100mm with tolerance of = 2%) Zinic+coated, Mesh wire diameter 2.7/3.7mm, Mechanically edged/selvedged with paritions at every 1 m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing , all complete as per direction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
22.pdf
Tender Documents • 4.58 MB
BOQ_184076.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid