| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.6 LAccepted-AOC BHAGWANPURA DISTY SYSYTEM CONCRETE LINING M 15 WITH 10 ENHANCED CAPACITY FROM RD 28900 42528 OFFTAKING AT RD 90200 R 2ND PATIALA FEEDER | ₹32.6 L Quoted ₹33.0 L | L1 | Accepted-AOC Lowest rates |
| 2 | L2₹33.9 LRejected-AOC NEAR LAKAR KANDA DARSHAN SINGH MC WALI GALI PREM NAGAR KOTKAPURA | SRI MUKTSAR SAHIB | PUNJAB | 151202 | ₹33.9 L | L2 | Rejected-AOC High rates |
| Sl No | Description | Qty | Unit | M/S DARSHAN SINGH CONTRACTOR L2 | ASHOK KUMAR BANSAL GOVT CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete
in all | 6,421.78 | cum | 101 ₹6.5 L | 100 ₹6.4 L |
| 2.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres | 266.61 | cum | 191 ₹50,922.51 | 191 ₹50,922.51 |
| 3.00 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 122.32 | cum | 6,731 ₹8.2 L | 6,610 ₹8.1 L |
| 4.00 | 10mm thick cement plaster 1.4 on sides walls | 292.76 | sqm | 184 ₹53,867.84 | 172 ₹50,354.72 |
| 5.00 | 10mm thick cement plaster 1:4 on bed and top | 81.97 | sqm | 142 ₹11,639.74 | 132 ₹10,820.04 |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed | 2.57 | cum | 5,765 ₹14,816.05 | 5,465 ₹14,045.05 |
| 7.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 24.23 | cum | 3,864 ₹93,624.72 | 4,294 ₹1.0 L |
| 8.00 | Lowering, jointing of RCC NP-2 plain end pipes 500 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. (committee labour rate) | 4,509.97 | M | 289 ₹13.0 L | 277 ₹12.5 L |
| 9.00 | jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No)(committee labour rate) | 47.5 | M | 84 ₹3,990 | 81 ₹3,847.50 |
| 10.00 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank | 0.9 | qtl | 10,847 ₹9,762.30 | 10,847 ₹9,762.30 |
Updated dates
Tender Value
₹82.8 L
EMD Value
₹1.7 L
Closing Date
6 Nov 2025, 1:00 pmClosed
Executive Engineer Lehal Canal Division Patiala
Executive Engineer Lehal Canal Division WRD Punjab Patiala
CORRECTED ESTIMATE FOR LINING OF WATER COURSE OF O/L R.D 13090/L OF MOHALGWARA DISTRIBUTARY DISTY. BY LAYING OF U/G PIPELINE OF 500 mm BABARPUR, DISTT.PATIALA
2025_WR_150541_1
58 dated 23.09.2025
Open Tender
Civil Works - Canal
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹1.7 L
Lehal Canal Division WRD Punjab Patiala
5 May 2026
23 Sept 2025
6 Nov 2025
23 Sept 2025
6 Nov 2025
23 Sept 2025
1 Oct 2025
Amount
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
10mm thick cement plaster 1.4 on sides walls
10mm thick cement plaster 1:4 on bed and top
Reinforced cement concrete 1:2:4 hand mixed
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing of RCC NP-2 plain end pipes 500 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. (committee labour rate)
jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No)(committee labour rate)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators)
Centreing &shuttering for Concerte faces
Providing & Fixing of Steel Shutter Gate Assembly in Main Pipeline complete in all respect
CTD bars
M/S DARSHAN SINGH CONTRACTOR (BID ID -695344)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_304942.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid