Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.4 LAccepted-AOC | L-1 | Accepted-AOC Accepted | |
| 2 | L-2₹10.0 L+₹2.5 L (32.6%)Rejected-Finance | L-2 | Rejected-Finance As
evaluated
by
committee |
Tender Value
₹10.7 L
EMD Value
₹26,900
Closing Date
10 Apr 2019, 5:30 pmClosed
SE PURCHASE AND WORK SSTPP DONGALIA
FLOOR 3RD ADMIN BUILDING SE PURCHASE AND WORK SSTPP DONGALIA
Grouting work to prevent leakage in the wagon tippler I and II, Secondary Crusher of Phase-I in CHP area, DM Plant, CW flow meter tank in Transformer Yard area, FOPH Building drain oil tank of Phase-I at SSTPP, Dongalia.
2018_MPPGC_207_1
WT-735
Open Limited
Civil Works - Others
Item Rate
60 days
SE PURCHASE AND WORK SSTPP DONGALIA
As per NIT
9 documents required · 9 mandatory
₹1,000
Payable To
₹26,900
Yes
16 Apr 2020
8 Feb 2019
12 Apr 2019
8 Feb 2019
10 Apr 2019
8 Feb 2019
Drilling holes 16-20mm dia for a depth 40mm to 50mm inside concrete at a spacing 300 to 450mm or as decided by Engineer incharge ,cleaning the hole by jet of water and inserting 15-20mm dia GI/PVC nipple at an inclination in epoxy putty. Grouting to be injected after 24 hours at all height and levels etc complete to the satisfaction of Engineer Incharge (Cost of Epoxy putty included)
Providing and injecting cement base grout with Polymer as per manufacturers specification of approved brand of supreme Bituchem, Krisna Conchem ,Fosroc,Dr.Beck Ciba or equivalent make by means of gun or pump at pressure of 5 to 7 Kg per sqm .First nipple to be closed after inclination and second un-till the grout flows out ,return pressure at any nearest end to be checked by pressure gauge .Injection grouting includes all pump rent Grouting equipment ,Scaffolding etc complete After grouting is completed after 24 Hours ,out the nipples and seal it with polymer modified mortar as per direction of Engineer incharge .Payment to be made by Weight of cement base grout consumed .
Water proofing treatment for expansion joints including opening of joint cleaning all labour T&P Overhead expenses Scaffolding etc complete in required length ,filling of sealant of approved quality manufactured by supreme Bituchem, Krisna Conchem ,Fosroc,Dr.Beck Ciba or equivalent make as per direction of Engineer incharge
Excavation in any type of strata /soil incuding and depositing the the excavated material little away from the place including all labour tools etc complete as per direction of Engineer incharge
Filling of foundation by the material obtained from excavation (as obtained in item No4) in layers not exceeding 150mm ,watering ,compaction etc complete.
SAI SUNDARAM IRP SYSTEMS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .