Er Sudheer Kumar SE CHC DTPS Kasimpur
Office of the SE CHC DTPS Kasimpur Aligarh
Miscellaneous Fabrication and repairing work on various equipment of CHP Cleaning and Upkeeping of CHP and Fuel Oil Facility Area in general shift Maintenance of different equipment installed in CHP Decantation of Fuel Oil Maintenance
2023_RVUNL_798679_1
STET-02/CHC/CHD-I/DTPS/2023-24
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Office of the SE CHC DTPS Kasimpur Aligarh
As per Tender Documents
4 documents required · 4 mandatory
₹4,602
SAO CFA AND BO HTPS KASIMPUR ALIGARH
₹78,000
20 May 2023
24 Apr 2023
10 May 2023
24 Apr 2023
8 May 2023
24 Apr 2023
24 Apr 2023 - 8 May 2023
Amount
Replacement of different size of conveyor drums.
Greasing/overhauling of conveyor drums.
Repairing of conveyor drum of any size.
Replacement of gear coupling /pin bush coupling between motor and redactor at belt feeder/wagon tippler/electric wagon pusher.
Replacement of electric winch trolley wheel shaft of conveyor bearing at conveyor 5A/5B.
Replacement of rope shaft of electric winch trolley of conveyor 5A/5B.
Replacement of driving steel wire rope by new one of length 615 meters at conveyor 5A/5B.
Repairing of driving steel rope of length 615 meters at conveyor 5A/5B.
Fabrication and replacement of raw coal bunker grating.
Repairing of raw coal bunker grating.
Fabrication and fitting of rubber scrapper on return side of conveyor at coal discharge hopper of conveyor.
Fabrication and installation of tension trolley / device at conveyor system/belt feeder system.
Replacement/repair of pulley/wheel or any other component of tension trolley device at conveyor system/belt feeders.
Replacement of inhaul/outhaul rope by new / old one.
Replacement of sheave assembly of inhaul/outhaul system.
Repairing/overhauling of sheave assembly of inhaul/outhaul system.
Replacement of gear coupling/pin bush coupling of redactor to drum or redactor to motor of any conveyor.
Overhauling of wheel support assembly of Russian wagon tippler.
Overhauling of R/G box of any conveyor/Russian wagon tippler/ TRF wagon tippler.
Replacement of R/G box of any conveyor / Russian wagon tippler/ TRF wagon tippler.
Welding of clits at rail line of plate form of Russian wagon tippler.
Repairing /overhauling of swinging feeder.
Repairing/replacement of scrapper at any conveyor.
Repairing/replacement of damper at any conveyor.
Re-railing the derailed coal wagon
Empty coal wagon
Loaded coal wagon
Fabrication and replacement of centre plate at TP-1/TP-2.
Fabrication and replacement of side plate at hopper of any conveyor.
Repairing / Replacement of Horizontal shock absorbers.
Repairing of platform.
Repairing of wheel foundation Assembly
Fabrication and erection of Top beam of tippler rotor.
Replacement of bush and Pin of connecting leaver.
Repairing and strengthening of cage gear
Repairing and strengthening of middle disc
Overhauling /Replacement of rest wall roller and roller system of RWT.
Repairing and strengthening of rest wall
Alignment of guide roller
Repairing of cradle beam
Replacement of suspension of wheel assembly of pusher
Repairing/ replacement of wheel assembly of pusher
Replacement of ceiling / hook of crane
Repairing of trolley of pusher
Replacement of bush of wheel
Repairing of trolley platform
Replacement of kamani
Repairing / replacement of buffer
Reloading of ceiling on pulley
Re railing of tension trolley on channel
Fabrication and erection of new foundation of redactor of swinging feeder.
Fabrication and erection of new foundation of motor of swinging feeder or winch trolley.
Fabrication & erection of opening of swinging feeder.
Alignment of winch trolley Track of Conveyor no. K-5A/5B.
Fabrication & Erection of Pipe of shower.
Laying of water line of 63 mm dia
Fabrication and Erection of L-Band.
Erection of Isolating Valve 40 mm dia.
Drilling of holes of 4 mm dia on pipe
Fabrication and erection of Flange joint.
Fabrication & Erection of support.
Repairing of any key way and key of any shaft by welding and machining.
Repairing of bore of gear coupling
Motor Side of conveyor K-3A/3B
Drum side of conveyor K-3A/3B
Motor side of conveyor K-1,K-2A/2B,K-4A/4B & K- 5A/5B
Drum Side of conveyor K-1,K-2A/2B,K-4A/4B & K- 5A/5B
Motor /rotor side of Russian coal crusher
Repairing/replacement of fire hydrant valve 63mm.
Laying of fire hydrant line up to a length of 10 mtrs.
Fabrication and installation of hold back system using gear socket and lock.
Repairing of grating of hoppers of Russian wagon tippler with help of rail line pieces.
Repairing of grating of hopper of swinging feeder.
Repairing beam of Russian Wagon Tippler/swinging feeder.
Replacement of beam of Russian Wagon Tippler /Swinging feeder.
Repairing/Replacement of valve of different size of conveyor shower system.
Repairing of roof of swinging feeder
Fabrication of bearing cover of redactor of electric pusher/Rest wall roller system.
Greasing of gear coupling between motor to Redactor or %Redactor to drum of different conveyor/B.F./RWT
Replacement of counter weight ceiling of Inhaul/ outhaul system.
Top-up of oil of RG Box of conveyor/B.F./RWT/TRF Tippler/Swinging feeder/ Electric winch trolley.
Strengthening of any transfer hopper by providing supports between hopper and conveyor structure along with side plates
Strengthening of motor foundation/ RG Box foundation of any conveyor system/ RWT/ TRF Tippler.
Replacement of any damaged ceiling of tension trolley of any conveyor -
Fabrication of motor/ RG Box foundation of any conveyor system/ RWT/ TRF Tippler
Replacement of any channel along with its support up to 5 meter of any conveyor system.
Fabrication and erection of grating of conveyor 3A/3B
Replacement of fluid coupling of any conveyor of TRF system.
Replacement of damaged coil of vibrating feeder-
Replacement of pinion of swinging feeder/ electric winch trolley
General Cleaning (Unit is Running Condition/ under Forced shut-down ) as per scope of work mentioned at ‘A’
Schedule of Quantities & Rates FOR ‘B’ COAL CRUSHER
Removal of old & worn out hammer set of Russian crusher after opening the crusher body.
Fitting of new hammer set after weighing them.
Balancing of old &used hammer set by re-moralizing & cutting.
Fitting of old & used balanced set of hammer by reversal of direction of complete hammer set.
Taking out of damaged rotor assembly.
Fabrication of old rear /front side grating from 20/40mm.
Replacement of 20mm /40mm thick rear side grating.
Replacement of 20mm /40mm thick front side grating.
Removal of rear half body of crusher after cutting pieces of the top hopper.
Removal of front half body of crusher after cutting pieces of top hopper
Refitting of rear half body of crusher & fitting of removed pieces on top hopper.
Refitting of front half body of crusher & fitting of removed pieces on top hopper
Replacement of crusher beam liner.
Fabrication of square plate.
Replacement of square plate
Fabrication & replacement of complete crusher body liner.
Fabrication of bypass damper.
Replacement of bypass damper.
Fabrication of crusher by pass grating.
Replacement of crusher by pass grating.
Fabrication & replacement of any one liner of crusher body.
Repairing of moving trolley having 3 no front gratings.
Repairing of rear side stationery grating, Frames.
Fitting of repaired rotor assembly.
Removal of damaged / useable rotor bearing no.3656/22356.
Fitting of new /useable rotor bearing no.3656/22356.
Removal of coupling of crusher rotor.
Removal of coupling of motor rotor.
Fitting of coupling of crusher rotor.
Fitting of coupling of motor rotor.
Removal of rotor of motor.
Fitting of rotor of motor.
Static balancing of crusher rotor.
Shifting of crusher motor stator from crusher house to turbine hall.
Shifting of crusher stator from turbine hall to crusher house.
Shifting of crusher rotor from crusher house to turbine hall.
Shifting of crusher rotor from turbine hall to crusher house.
Repairing of crusher half body ( rear /front ) by 25mm/32mm thick ms plate.
Greasing of bearings of crusher rotor.
Removal of chocking of crusher from coal.
Tightening of 22nos foundation bolts of crusher.
Hard facing in the working surfaces of coal crusher hammers (69nos) by welding process.
Alignment of crusher rotor with motor rotor.
Remetalizing of Coal Crusher Hammers (69 Nos.) by welding process
Matching of white metal bearing of motor rotor
Schedule of Quantities & Rates FOR ‘C’( TRF W/T)
Rubber lining on rest walls of TRF Wagon Tippler.
Strengthening of platform Bottom structure of TRF Wagon Tippler.
Fabrication of grating of hopper of TRF Wagon tippler.
Replacement of grating of hopper of TRF Wagon tippler.
Fabrication & Erection of hopper of vibrating feeder.
Schedule of Quantities & Rates FOR ‘C’(RUSSIAN W/T)
Repairing / replacement of vertical shock absorbers.
Strengthening of flanges of pipe bracing at non-driving end.
Repairing and strengthening of top beam of tippler rotor.
Repairing of rail rim of middle Disc.
Repairing / Overhauling of guide rollers.
Strengthening of cradle beam.
Strengthening of bottom beams of platform.
Rubber lining on Rest walls.
Replacement of worn out plate form rails.
Fabrication & erection of hopper of belt feeder.
Repairing / overhauling of stop rollers of Russian wagon tippler.
Checking / tightening & replacement of bolts provide for fixing the spur gear at both the sides of tippler.
Alignment of pinion to spur gear & gear box.
Repairing/ replacement of pinion shaft/ pinion.
SERVICING/GREASING / OILING OF THE BUSHES/BEARINGS OF TRF & ELECTRIC PUSHER:-
Servicing & greasing / oiling of the bushes of tippler pulleys (Sheeves) which are given as below:- (TRF)
Bushes of Drum & Counter weight pulleys (Sheeves).
Bushes of wire rope carrying drum.
Bushes of wire rope carrying drum.
Replacement of worn out/ damaged bushes & shaft (Pin) of inhaul/outhaul system big pulley (Sheeve).
Replacement of worn out/ damaged tension trolley pulley(Sheeve)/bushes & shaft of pulley of inhaul/outhaul system.
Replacement of worn out/ damaged bushes & shaft (pin) of counter weight pulley (Sheeve).
Schedule of Quantities & Rates FOR ‘D’ CONVEYOR BELT
Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process.
A.1000mm wide conveyor belt.
B. 1200mm wide belt.
C. 1400mm wide belt.
Removal of Old damaged/partly useable and laying of new/reusable belt.
Dragging of belt on Conveyor Super-structure.
Fastener Jointing on belt.
Shifting of Conveyor belt from ‘0’M to + 30M at conveyor 5A/5B.
Repairing of torn out belt by stitching with G.I. wire.
Repairing the damaged fastener joint by stitching with G.I. wire.
A- Upto half Joint length.
B- More than half joint length.
Refixing of side rubber which comes out from its place(one side)
Removal of old/damaged side rubber, fabrication of new side rubber and fixing it on its place.
Dismantling and refitting of discharge hoppers of wagon tippler (above belt feeders) for replacement/re-jointing of conveyor belt of belt feeder.
Patch work of repairing of small cuts of 10x100Cm size by fixing rubber with cold solution by preparing the surface properly.
Schedule of Quantities & Rates FOR ‘E’
Fabrication and replacement of complete mother plate 10/12 mm of any hopper of conveyor system. Size of hopper 850 to 1200 mm width and 4 to 5 meter height.
Fabrication and replacement of complete liner plate 8/10 mm of any hopper of conveyor system. Size of hopper 850 to 1200 mm width and 4 to 5 meter height.
Fabrication and replacement of complete single plate 10/12 mm of hopper of any transfer point. Size of hopper 850 to 1200 mm width and 4 to 5 meter height
Repairing of any hopper by patch work with following size MS plate:-
a) Up to 300x300 mm.
b) Up to 400x400 mm.
c) Up to 600x600 mm.
d) Up to 850x400 mm.
e) Up to 850x600 mm
Fabrication and replacement of supporting structure of any conveyor.
Strengthening of overhead conveyors by use of plates, angles, channels and joints.
Schedule of Quantities & Rates FOR ‘F’ Repairing and greasing of conveyors rollers & drums
Servicing of Rollers:-
Steel rollers of 1200 mm conveyor
Steel rollers of 1400 mm conveyor
Steel rollers of 1000 mm conveyor
Rubberized roller 1200 mm conveyor
Rubberized roller 1400 mm conveyor
Rubberized roller 1000 mm conveyor
Return roller 1200 mm conveyor
Return roller 1400 mm conveyor
Return roller 1000 mm conveyor
Greasing/Servicing of bearing of drums
Bearing of drive drum of 1400 mm conveyor
Bearing of drive drum of 1200 mm conveyor
Bearing of drive drum of 1000 mm conveyor
Bearing of driven drum of 1400 mm conveyor
Bearing of driven drum of 1200 mm conveyor
Bearing of driven drum of 1000 mm conveyor
Bearing of snub drum of 1400 mm conveyor
Bearing of snub drum of 1200 mm conveyor
Bearing of snub drum of 1000 mm conveyor
Greasing of bearings of counter weight pulleys of 1400/1200 mm conveyor
Bearing of counter weight pulley of 1400 mm conveyor.
Bearing of counter weight pulley of 1200 mm conveyor.
Bearing of counter weight pulley of 1000 mm conveyor.
Servicing/Greasing of guide rollers of Winch trolley of conveyor K-5A&5B.
Repairing idler frame of any conveyor.
Decantation of LDO/LSHS from BTPN rakes by making connection for unloading and making disconnection after unloading.
Decantation of LDO/LSHS from Road Tankers by making connection for unloading and making disconnection after unloading.
Cleaning of FO/LDO/LSHS storage tanks
Cleaning of FO/LDO/LSHS storage tanks of 1000 KL capacity
Cleaning of FO/LDO/LSHS storage tanks of 500 KL capacity.
Cleaning of settling tanks of 100 KL Capacity
Cleaning of underground pits.
Section ‘B’
Rotary Pump- Capacity 200Kl/hr. Motor capacity 55 KW.
Russian Pump- Capacity 150 Kl/hr. Motor capacity 50 KW.
Gear Pump- Capacity 75 Kl/hr. Motor capacity 37 KW.
Complete overhauling of secondary oil pumps:
Drainage Pump- Capacity 5KW.
Channel Pump- Capacity 5 KW.
Cleaning of Filters
Rotary/Russian Pump
Gear Pump
Repairing of Steam/oil Valves of Different Sizes
Attending lighting complaints and assistance in electrical Maintenance of 6.6 KV/ 0.4KV switch gear and motors in shift for one year as per scope of work. Time of Shift [20:00 Hrs to 06:00 Hrs. (02 Hrs Rest)]
Star O and M Group
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .