Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹87.5 L C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | L1 | - | |
| 2 | L2₹89.0 L+₹1.5 L (1.71%) C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | L2 | - | |
| 3 | L3₹89.7 L+₹2.2 L (2.47%) C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | L3 | - | |
| 4 | L4₹97.2 L+₹9.7 L (11.1%)Financial bid opened C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL | L4 | Financial bid opened | |
| 5 | - | - | - |
| Sl No | Description | Qty | Unit | M/S SKYLINE AIRCONDITIONING ENGINEERS PVT LTD L3 | M/s Shri Shiv Shakti Enterprises Jabalpur MP Jabalpur L4 | KAMLESH KUMAR OJHA L2 | GD ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1 | ELECTRICAL WORK | - | - | -4.19 ₹89,66,522.57 | 3.9 ₹97,23,637.35 | -4.9 ₹89,00,076.15 | -6.5 ₹87,50,337.75 Lowest |
Tender Value
₹93.6 L
EMD Value
₹1.9 L
Closing Date
12 Sept 2024, 3:00 pmClosed
EE(E)-Jabalpur
Om Prakash Mishra
52-A, NIRMAN SADAN
C/O BUILDING FOR 125 MM PSAPDA CCC MANUFACTURING PLANT AND PROCESS CUM STORAGE BUILDING ALONG WITH AC PLANT AND CHANGE ROOM AT ORDENANCE FACTORY KHAMARIA JABALPUR SH PROVIDING HEAT PUMP FOR ROOM NO 15 HOT WATER PIPE LINE HOT WATER PUMP CONTROL PANEL
87411
17/EE(E)/JABALPUR/2024-25
OPEN
Electrical Works
NCB
4 months
Jabalpur, Madhya Pradesh
10 documents required · 10 mandatory
₹1.9 L
Not Applicable
12 Sept 2024
4 Sept 2024
12 Sept 2024
12 Sept 2024
11 Sept 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT17.pdf
document • 1.80 MB
SOQ17.pdf
document • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .