Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-Finance | L1 | Accepted-Finance LOWEST | |
| 2 | L1₹9.0 LAccepted-Finance | L1 | Accepted-Finance LOWEST | |
| 3 | L2₹9.9 L+₹93,025 (10.4%)Rejected-Finance | L2 | Rejected-Finance HIGHEST |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
17 Dec 2018, 12:00 pmClosed
SE EDC Mathura
Near Kali Mandir, Mathura Cantt, Mathura
Proposed work for Maintenance of Damaged 11KV/LT Line due to (Brunt Cable, Theft and M and R Work) at various place under 33/11 KV Sub Station Datiya and Ading place in the jurisdiction of E.D.D.-IV, Goverdhan, Mathura
2018_DVVNL_278073_1
129/EDC(M)/2018-19
Open Tender
Electrical Works
Item Rate
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,062
DVVNL Agra
₹9,000
Yes
30 Nov 2020
29 Nov 2018
19 Dec 2018
29 Nov 2018
17 Dec 2018
29 Nov 2018
Amount
Carriage of 8.5 Mtrs. long PCC pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 9 Mtrs. long PCC pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 9/11 Mtrs. long ST pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Replacement of 8.5 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
Replacement of 9 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
Replacement of 9/11 Mtrs. Long damaged ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
Erection of single pole structure on 8.5 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure on 9 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure on 9/11 Mtrs long ST Pole including fitting of all relevant accessories as per RESPO norms.
Dismantling of existing damaged Double Pole structure on 8.5/9/11 Mtrs. long PCC/ST pole by opening all relevant accessories.
Erection of Double pole structure on 8.5 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure on 09 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure on 9/11 Mtrs. long ST pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.
Removal of ACSR Weasel conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
Removal of ACSR Dog/Raccon conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
Removal of Arial Bunch Conductor 3x50 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
Removal of Arial Bunch Conductor 3x95 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Dog/Raccon conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x50 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x95 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
Construction of T pole/ Section pole for LT Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work
Construction of T pole/ Section pole for 11 KV Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work
Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc.
Dismantling of 25/63/100 KVA Transformer erected on the Single Pole/Double pole/Plinth structures and removal consumers connections thereof.
Mounting of 25/63/100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.
Body and neutral earthing of 250 KVA and above transformer installed by digging of pit up to water level depth (approx. 100 FT) and then inserting 1-1/4” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.
Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Dismentling/Removal of damaged 11 KV XLPE Cable size 3x70/3x120 sq.mm. from existing 11/33 KV line double poles and trench after digging.
Dismentling/Removal of damaged 11 KV XLPE Cable size 3x185/3x300 sq.mm. from existing 11/33 KV line double poles and trench after digging.
Laying of various size 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Laying of various size 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Fixing of 11 KV Cable Jointing Kit 3x120/3x185 sq.mm outdoor/indoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.
Fixing of 11 KV Straight Through suitable for 3x120/3x185 sq.mm outdoor/indoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.
Dismentling/Removal of damaged 11 KV Guarding from existing line. The work includes cost of labour, T&P etc.
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
Shri Krishna Construction Company
Vivek Electricals
Bidder Name
Shri Krishna Construction Company
RAJENDRA BHARDWAJ
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .