| 1 | L1₹7.7 CrAdmitted-Finance | ₹7.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.4 Cr+₹67.1 L (8.73%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹8.4 Cr+₹67.1 L (8.73%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GUHANSANJEEVI ENTERPRISES L1 | M s Kumaresan and co L2 |
|---|---|---|---|---|---|
| 1.00 | Check surveying and pit marking of tower locations including cost of all labour, lead, lift, hire charges for T&P etc complete. | 22 | Loc. | 2,000 ₹44,000 Lowest | 2,000 ₹44,000 Lowest |
| 2.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard gravelly soil | 1,706 | Cum | 110 ₹1,87,660 Lowest | 150 ₹2,55,900 |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In soft distengrated rock not requiring blasting | 244 | Cum | 170 ₹41,480 Lowest | 200 ₹48,800 |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In medium rock and dense medium rock not requiring blasting | 244 | Cum | 300 ₹73,200 Lowest | 400 ₹97,600 |
| 5.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring blasting | 122 | Cum | 600 ₹73,200 Lowest | 800 ₹97,600 |
| 6.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring Wedging and chesiling | 122 | Cum | 900 ₹1,09,800 Lowest | 1,200 ₹1,46,400 |
| 7.00 | Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 6 | Loc. | 19,000 ₹1,14,000 Lowest | 30,000 ₹1,80,000 |
| 8.00 | Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 9 | Loc. | 23,000 ₹2,07,000 Lowest | 40,000 ₹3,60,000 |
| 9.00 | Fixing of templates, stub and cleat for QD tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 1 | Loc. | 31,000 ₹31,000 Lowest | 80,000 ₹80,000 |
| 10.00 | Fixing of templates, stub and cleat for D tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 2 | Loc. | 23,000 ₹46,000 Lowest | 40,000 ₹80,000 |
Tender Value
Refer Docs
EMD Value
₹6.4 L
Closing Date
21 Jan 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Earth work excavation, Stub Setting, Concreting, Supply, Transporting and Erection of DC tower with Supply , Transport and Stringing of 6 nos Panther conductor ,1 no Earth wire by making LILO of proposed 110KV line from Uddanapalli 230KV SS to Kempat
2024_EB_513805_1
TP1-27/2024-25 OF CE/TP1/CNI
Open Tender
Civil Works
Works
270 days
ULIVEERANAPALLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6.4 L
Yes
27 Feb 2025
24 Dec 2024
22 Jan 2025
24 Dec 2024
21 Jan 2025
24 Dec 2024
Amount
Check surveying and pit marking of tower locations including cost of all labour, lead, lift, hire charges for T&P etc complete.
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In medium rock and dense medium rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring Wedging and chesiling
Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for QD tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for D tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete.
Providing shoring and shuttering with CW Scantlings and planks including cost of all materials, labour etc., complete.
PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead,lift and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P etc complete.as directed by the Engineer at site.
PCC 1:2:4 using 20 mm HB Stone for tower foundation with steel form work for frustum shaped foundation and chimney including cost of cement of approved brand including all materials labour, lead,lift curing , consolidation, hire charges for T&P, etc complete.as directed by the Engineer at site.
RCC 1:1.5:3, using 12 to 20mm HBG metal for foundation , Frustum and chimney concrete with form work including cost of cement of approved brand including all materials labour, lead,lift curing , consolidation, hire charges for T&P, etc complete.as directed by the Engineer at site.but excluding the cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete
Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete
Transport and erection of towers including sorting out of tower members, tightening punching the bolts and nuts whereever necessary, patch painting, cutting of angles wherever necessary, minor fabrication workss, final checking, cost of T & P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials,adhering to the BOCW act 1996 and rules 2006 without any compromise all leads and lifts etc., complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Under LC condition.
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of ST fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete.
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of ST fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Under LC condition
Providing well supported trussels using 7.5 cm to 10 cm and above dia bamboo post with necessary bracing on either side road crossing upto 5m height for supporting to the power conductor and earth wire during paying out of conductor and tensioning operation including cost of all materials lead, lift etc., complete
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Supplying and fixing of name board of size 0.75 x 0.45m using 18 gauge MS Sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labour, lead, lift, etc., complete..
Painting with two coats of anticorrosive paint over tower leg at a height of 45 cm including all cost of materials,labour, lead lift etc complete
Arranging and availing line clear in HT/LT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT/ LT, lines earthing lead, lift, T&P etc., complete.
Tack welding of bolts & Nuts in the newly erected towers up to bottom cross arm level including of three tack weld for each bolts & Nuts hire charges of welding machine, cost of welding rods, transporting charges and painting with cold galvanizing and tightening of bolts wherever necessary including cost of all materials, labour, lead, lift,, transporting hire charges etc. complete.
Labour charges for transport of 3 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For span Under LC condition
Labour charges for transport of 3 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For span
Labour charges for transport of 3 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Km
Labour charges for transport of 6 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For span
Labour charges for transport of 1 No. of Earthwire , Payingout, stringing and jubmering of earthwire with fittings etc complete.As directed by the Engineer at site. For span
Supply, transporting and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supply, transporting and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
Supply, transporting and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Labour charges for dismantling of existing 110 KV GCR type tower and including all tools and plants etc complete.
Labour charges for dismantling of 3 Nos Panther conductor including cost of all materials, lead, lift, labour and cost of T&P etc complete As directed by the Engineer at site.
Labour charges for releasing and Re-stringing of 3 Nos Panther conductor including cost of all materials, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor, transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC condition
Labour charges for releasing and Re-stringing of 1 No. of Earthwire , jubmering of earthwire with fittings etc complete.As directed by the Engineer at site. Under LC condition
Labour charges for Releasing of 8 units of 120 KN Disc Insulators and it is reused to same line work including all cost of labour,lead, lift, T & P etc complete. under LC Condition
Labour charges for Releasing of 7 units of 90 KN Disc Insulators and it is reused to same line work including all cost of labour,lead, lift, T & P etc complete. under LC Condition
Labour charges for fabrication, painting and erection charges for DP structure Heavy section tower parts ie., section weight above 14 kg including all cost of labour,lead, lift, T & P etc complete.
Labour charges for fabrication, painting and erection charges for DP structure Light section tower parts ie., section weight below 14 kg including all cost of labour,lead, lift, T & P etc complete.
Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supply of line materials ACSR Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials Earthwire as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials 120 KN Tension Insulator as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply, transport and fixing of Single Tension fittings for panther as per design drawing and specifications.
Supply, transport and fixing of Single Suspension fittings for Panther as per design drawing and specifications.
Supply, transport and fixing of SB damber for panther as per design drawing and specifications.
Supply, transport and fixing of Mid span joint for Panther as per design drawing and specifications
Supply, transport and fixing of Repair sleeve for Panther as per design drawing and specifications
Supply, transport and fixing of 16 mm dia. U Bolt and Nuts/ Hanger rods as per design drawing and specifications
Supply, transport and fixing of Single Tension fittings for Earthwire as per design drawing and specifications.
Supply, transport and fixing of PA Rod for Panther conductor as per design drawing and specifications.
Supply, transport and fixing of Droper rod for Panther conductor as per design drawing and specifications.
Supply, transport and fixing of Aluminioum Earth Bond as per design drawing and specifications.
Supply, transport and fixing of Mid span joint for Earth wire as per design drawing and specifications.
Supply, fabrication, painting of RS joist MS channels, Angles Heavy section , section weight above 14 kg as per department approved drawing/design including stacking of parts, transporting of parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 , The governing standards should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supply,of RS joist MS channels,Angles light section , section weight below 14 kg as per department approved drawing/design including stacking of parts, transporting of parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 , The governing standards should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Dismantling of GI Tower Angle in AS IS WHERE IS CONDITION clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.25,000/-)
Dismantling of ACSR panther conductor in AS IS WHERE IS CONDITION clearing from the site on cost to paid to TANTRANSCO including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.85,000/-)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M s Kumaresan and co (BID ID -1233610)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .