Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹55.1 L+₹3.9 L (7.69%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹55.3 L+₹4.1 L (8.05%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹56.0 L+₹4.8 L (9.32%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹56.8 L+₹5.6 L (10.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹97.1 L
EMD Value
₹1.9 L
Closing Date
25 Sept 2026, 4:00 pmClosed
Office ofExecutive Engineer RNB Vailoo
Office ofExecutive Engineer RNB Vailoo
Upgradation of Road from Hangalgund to Puroo road
2026_PWDJK_324857_6
eNIT43DIVISIONVAILOO
Open Tender
Civil Works
Percentage
240 days
Vailoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Yes
Centralized Pooling Account
₹1.9 L
Yes
1 Oct 2026
16 Sept 2026
26 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH CUTTING:- Earth work in bulk excavation by mechanical means (Hydraulic excavator) over areas ( exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan), including disposal of excavated earth lead upto 50 metres and lift upto 1.5 m, as directed by Engineer-in Charge. (ALL KINDS OF SOIL) | 2,116.63 | cum | 164.2 | ₹3,47,557 |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. (a Beyond 30 cm girth upto and including 60 cm girth. | 17 | NO | 332.31 | ₹5,649.29 |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. (b) Beyond 60 cm girth upto and including 120 cm girth. | 26 | NO | 1,475.48 | ₹38,362.43 |
| 4 | RCC SPUN PIPES :- Supply and laying of RCC spun pipes of different dia as per requirement at site, including earth cutting , laying of cushion over pipes and laying of pipes in proper grade complete as per direction of engineer incharge including cost of pipes and carriage from source to site all job complete ( 450 mm dia) | 34.16 | RM | 3,559.32 | ₹1,21,586.44 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sites and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m including all job complete | 590 | CUM | 225.18 | ₹1,32,855.61 |
| 6 | P/L dry Stone Soling/ Backfiling (100mm size) duly hand packed consolidated with hand rammers complete Job | 430.02 | CUM | 847.46 | ₹3,64,423.89 |
| 7 | Providing and laying in position cement concrete of 1:4:8 ratio excl cost of centering shuttering and carraige all work in foundation using coarse sand and 40mm nominal size aggregates complete job | 63.75 | CUM | 4,561.36 | ₹2,90,786.45 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 614.7 | CUM | 5,778.52 | ₹35,52,053.17 |
| 9 | Centering and shuttering i/c strutting propping etc and removal of formwork for:- Drain / Edge wall | 2,678 | SQM | 251.04 | ₹6,72,290.48 |
| 10 | P/F of PVC Weep holes (75mm) in proper line and gradient complete job | 200 | NO | 169.49 | ₹33,898.4 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1096223.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .