Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹17.4 L
Closing Date
2 Jun 2026, 12:00 pmClosed
Chief Engineer, PHED, Manipur
O/o the Chief Engineer, PHED, Khoyathong, Manipur
24 x 7 Water Supply in identified DMAs of Imphal Municipal Corporation Area (Package B Chinga DMA), Project No. 20 (B).
2026_PHED_3392_1
CE/PHE/AMRUT-2/2-286(A)/M-I (C)/2026
Open Tender
Miscellaneous Works
Turn-key
730 days
Imphal
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE Maintenance Divn No. I, PHED, Manipur
₹17.4 L
12 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
2 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Drawing, Construction, Testing, Trial run and commissioning of R.C.C. Intake well of 4.5 MLD capacity including mechanical and electrical works, connecting walkway cum pipe carrying bridge from intake well to river bund, electrically operated travelling crane and girder arrangement, construction of coffer dam with suitable foundation and other necessary ancillary units etc. complete and as directed by Engineer-in-Charge at Chinga WTP (Capacity =4.5 MLD) intake Singjamei. | - | Per Job | 1.25 | - |
| 2 | Providing, delivery, installation, testing ang commissioning of 2 (two) nos. of Vertical Turbine Pump sets for Chinga intake well 4.5 MLD (one working and one standby) having specified duty parameters and guaranteed efficiency along with necessary valves arrangement, suitable control panel board, joints accessories, gates accessories and cost of jointing materials. etc complete as per detailed specifications as directed by the Engineer-in-charge. | - | Per Job | - | - |
| 3 | Supply, installation, commissioning of 100 & 250 KVA transformers for operation of pumpsets at Chinga intake unit and Chinga WTP including erection of poles, stringing of necessary HT & LT lines and other necessary fittings, excavation for foundation work, cement concrete works in foundation for transformers as well as pole erection, earthing cable along with necessary fittings, obtaining approvals / permissions from MSPDCL/MSPCL i/c testing, commissioning complete and as directed by Engineer-in-charge. The Transformer shall be designed and manufactured conforming to Energy Efficiency Level–2 at basic insulation level as per IS:2026 (Part I & II) with latest amendments and IS:1180 (Part I–2014) with latest amendments, fitted with On-Load Tap Changer (OCTC), initial filling of oil conforming to IS:335–1993, and all necessary fittings and protection devices. Chinga WTP
i) 100 KVA – 1 number at Chinga WTP
ii) 250 KVA – 1 number at Chinga Intake. | - | Per Job | 100 | - |
| 4 | Providing, Laying of DI feeder mains with DI K7 pipe conforming to IS 12288:2002 specifications including excavation, sand bedding, jointing, backfilling, transporting and necessary road restoration works including providing and laying of DI/CI fittings (specials) and suitable DI/CI valves as per relevant IS codes and construction of masonry chambers including testing of pipe joints, fittings, valves and disinfection of all pipes, trial run and commissioning etc. complete.
Chinga zone
i) 100 mm dia - 2950.00 m
ii) 150 mm dia - 5.00 m
iii) 200 mm dia - 1089.00 m
iv) 300 mm dia - 12.00 m
Total - 4056.00 m | - | Per Job | 53 | - |
| 5 | Design, Drawing, Construction, Testing, Trial run and commissioning of 0.20 ML capacity Settling tank lower level including necessary internal pipe fittings at Chinga WTP. | - | Per Job | 10 | - |
| 6 | Design, Drawing and Construction of R.C.C. Emergency Reservoir of capacity 0.50 ML with R.C.C. slab roofing, including inlet, outlet, overflow and scour pipe connections with all necessary specials and fittings, provision of manholes with covers, air vents, internal access arrangements, installation of disinfection dosing unit and suitable water level indicator, smooth finishing of all surfaces, curing, satisfactory water-tightness test, and all allied civil, mechanical and electrical works, site development works, drainage system, providing and fixing internal pipes, pipe specials complete at Chinga WTP and as directed by Engineer-in-charge complete at Chinga WTP site as per approved design and direction of Engineer-in-Charge | - | Per Job | 11 | - |
| 7 | Providing/Supplying, installation of Horizontal Split Casing Centrifugal Pumpsets (Worthington/ Mather Platt/ Kirloskar make) with a combined discharge of 134.26 LPS each against a head of 35 m each with motors (three working and one standby) i/c ancillary units, valves, cost of jointing, and other materials complete including trial run and as directed by Engineer-in-charge.
i) 4 (four) number at Chinga | - | Per Job | 10 | - |
| 8 | Design, Drawing, Construction, Testing, Trial and commissioning of RCC Cascade Aerator of 300mm dia inlet at Chinga WTP 4.5 MLD as per relevant IS codes with necessary fittings complete and as directed by Engineer-in-Charge | - | Per Job | 22 | - |
| 9 | Design, Drawing, Construction, Testing, Trial and commissioning of 0.2 ML capacity Settling tank upper level including necessary internal pipe fittings complete at Chinga WTP complete and as directed by Engineer-in-charge. | - | Per Job | 1.25 | - |
| 10 | Providing and laying of filter media for Rapid Sand Filters conforming to IS:8419 (Part I) 1977 at Chinga WTP and as directed by Engineer-in-Charge. | - | Per Job | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_3688.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].