Office of EE PHE Division Reasi
Office of EE PHE Division Reasi
Installation, testing Commissioning of pumpstes, electromechanical components other allied works at Bhawan-stage one Boondian of SMVDSB
2023_PHE_212261_1
ENIT NO.PHER/13 OF 2023-24
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
120 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Jul 2023
16 May 2023
23 May 2023
16 May 2023
22 May 2023
16 May 2023
Amount
INSTALLATION of Pump sets Bhawan Stage one 16000 GPH X 180m head :- Foundation Block( 2 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (02 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (2 nos) :-Installation of new 16000 GPH X 180M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Delivery manifold (01 Nos):-:-Fabrication of delivery manifold out of M.S. pipe 10-15 feet length by plugging both the ends by welding 1 No. blind flange at each end and placing in position and required height outside the pump room and anchoring by laying of RCC Cubical blocks 2 nos. Of required size over the manifold with required foundation of blocks beneath the manifolds and curing properly the RCC cubical blocks for proper strength and finally the delivery manifold to be connected with the Rising main by creating a hole of required size in the delivery manifold by gas cutting making v-groove all along the circumference of the cut by way of joining of rising main to the manifold by proper welding work in a precise manner-1Job Suction Line (02 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(2no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(2 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 35sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets at Boondian 10000 GPH X 330m head:- Foundation Block( 1 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (01 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (1 nos) :-Installation of new 10000 GPH X 330M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Suction Line (01 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(1no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(1 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 35sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets at boondian 10000 GPH X 330m head :- Foundation Block( 1 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (01 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (1 nos) :-Installation of new 18000 GPH X 330M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Suction Line (01 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(1no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(1 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 70sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump set of 10000 GPH x 230m at pump room Hut Bhawan :- Foundation Block( 1 NOs):-Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (01 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (01 nos) :-Installation of new 10000 GPH X 230M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Suction Line (01 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(1no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(1 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-Providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 50 sq mm All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets of 16000 GPH x 180m at pump room Bhawan Stage-0:- Foundation Block( 3 NOs):-Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (03 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (03 nos) :-Installation of new 16000 GPH X 180M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Delivery manifold (01 Nos):-:-Fabrication of delivery manifold out of M.S. pipe 10-15 feet length by plugging both the ends by welding 1 No. blind flange at each end and placing in position and required height outside the pump room and anchoring by laying of RCC Cubical blocks 2 nos. Of required size over the manifold with required foundation of blocks beneath the manifolds and curing properly the RCC cubical blocks for proper strength and finally the delivery manifold to be connected with the Rising main by creating a hole of required size in the delivery manifold by gas cutting making v-groove all along the circumference of the cut by way of joining of rising main to the manifold by proper welding work in a precise manner-1Job Suction Line (03 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(3no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(3 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed -120 HP at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 35sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets 16000 GPH x 220m at pump room Bhawan stage-0:- Foundation Block ( 2 NOs):- Modification of existing foundation block by way of cutting, beveling and welding of existing block. Job includes. Modification as per the pump casing. Job includes all sorts of labour & carriage charges. Complete job. Carriage (02 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (02 nos) :-Installation of new 16000 GPH X 220M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Delivery manifold (01 Nos):-:-Fabrication of delivery manifold out of 200 mm M.S. pipe 10-15 feet length by plugging both the ends by welding 1 No. blind flange at each end and placing in position and required height outside the pump room and anchoring by laying of RCC Cubical blocks 2 nos. Of required size over the manifold with required foundation of blocks beneath the manifolds and curing properly the RCC cubical blocks for proper strength and finally the delivery manifold to be connected with the Rising main by creating a hole of required size in the delivery manifold by gas cutting making v-groove all along the circumference of the cut by way of joining of rising main to the manifold by proper welding work in a precise manner-1Job Suction Line (02 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(2no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 70 & 50 sq mm All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets 16000 GPH x 180m at pump room Bhawan Stage-1:- Foundation Block( 2 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (02 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (2 nos) :-Installation of new 16000 GPH X 180M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Delivery manifold (01 Nos):-:-Fabrication of delivery manifold out of M.S. pipe 10-15 feet length by plugging both the ends by welding 1 No. blind flange at each end and placing in position and required height outside the pump room and anchoring by laying of RCC Cubical blocks 2 nos. Of required size over the manifold with required foundation of blocks beneath the manifolds and curing properly the RCC cubical blocks for proper strength and finally the delivery manifold to be connected with the Rising main by creating a hole of required size in the delivery manifold by gas cutting making v-groove all along the circumference of the cut by way of joining of rising main to the manifold by proper welding work in a precise manner-1Job Suction Line (02 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(2no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(2 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 35sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets 10000 GPH x 330m at pump room Thanda Sulla :- Foundation Block( 1 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (01 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (1 nos) :-Installation of new 10000 GPH X 330M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Suction Line (01 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(1no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(1 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed -120 HP at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 35sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets 10000 GPH x 330m head at pump room Boondian:- Foundation Block( 1 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (01 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (1 nos) :-Installation of new 10000 GPH X 330M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Suction Line (01 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(1no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(1 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed -120 HP at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 35sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
INSTALLATION of Pump sets 18000 GPH x 330m at pump room Boondian:- Foundation Block( 1 NOs):- Construction of R.C.C. foundation block as per pump size inside the pump room at pump room for installation of pumping units by excavation of soil to finish with required dimensions of the pit, removal of excavated material and disposing off the same outside the pump room at suitable place as per site conditions. The job also includes demolishing the existing flooring of requisite area with jack hammer, high carbon steel chisels and sledge hammer, providing and laying of crushed stones 40 mm and ramming properly. Laying of one layer of 1:3:6 concrete mass 30 mm thick. Fabrication & Providing of steel foundation bolts of – 6 Nos. having threaded portion at one end and an anchor at the other end. Also providing fabrication of steel hexagonal nuts and washers for the foundation bolts. Fabrication of steel reinforced cuboidal structure of requisite size for the foundation block out of T.M.T steel bars 10 mm thick by way of cutting, the steel bars of required length and placing in position at proper spacing longitudinally and transversally and binding with black annealed wire them properly so that internal cube meshes of 6” size are formed. Job includes fabrication charges as well hirer charges of welding set. Lowering the reinforced/cuboidal steel structure in the pit and then placing the base frame of the pump over the steel reinforced cuboidal steel structure making proper leveling and alignment of the base frame over the cuboidal steel structure. Placing the threaded end of the foundation bolts in upright vertical position at required distance in position and in alignment after lowering through holes of base frame. Binding of the foundation bolts with the steel mesh of cuboidal steel reinforced structure at various spots and then fastening the base frame over the reinforced steel structure by tightening the nuts of the foundation bolts, simultaneously ensuring proper leveling and alignment of the base frame over the reinforced cuboidal steel structure. The job further includes laying of M-20 grade cement concrete block including steel reinforcement, machine mixing laying and compaction with vibrator using stone aggregate 1:11/2:3 mix (1 cement 11/2 coarse sand and 3 graded stone mixture of specified grade of nominal size 20mm) including binding chemical up to top level from inside the base frame and up to the bottom line of base frame from outside of the base frame – also plastering the exposed surface of block. Construction of drain for draining out the occasional leakage water of pump. Also repairing of damaged flooring wherever required with cement concrete mixture using chemical bonding material for smooth finish of the flooring of the pump room, and proper curing of cement works for proper strength for a minimum of 07 days. The whole job also includes cost of material and carriage charges for all material from various sources by Mech. Transport as well as head load, hire charges of shuttering material, vibrator and concrete mixture and welding set, POL for vibrator and concrete mixture, labour charges for laying of foundation block, including skilled and semi-skilled workers deployed for execution of job. Carriage (01 nos ):-Carriage of pumping machinery (pump, motor, coupling set, base frame to site of work by Mech. Transportation and Head Load up to Pump Room. The job also includes dismantling the pumping unit, unfastening the coupling bolts, nuts, bolts of the base frame for separating each component viz. motor pump, coupling set, base frame etc., for their proper handling and carriage. Installation (1 nos) :-Installation of new 18000 GPH X 330M. Head H.C. pump set on the foundation blocks at pump room by way of providing and fitting of bolts with nuts and washers for fitting of new pump and motor on each base frame, Also leveling of pump and motor in proper alignment with each other. Tightening the nut bolts of the base frame. Providing and fitting graphite gland packing with fitting of pump glands. Coupling the pump and motor by way of fixing of coupling bolts. Job includes cost of graphite gland packing, nut bolts of the base frame and labour charges for skilled and semiskilled workers deployed for execution of job. Suction Line (01 Nos) :- Fabrication of suction line of dia equivalent to pump inlet dia, for each pump set out of M.S. pipes, cast iron sluice valve- 1 No. for each line , M.S. bends - quantity as per site requirement. MS flanges – qty as per site requirement for connecting pump suction inlet to suction manifold/sump tank. The job includes cutting the pipe in required lengths as per alignment/layout condition of the suction line at site, the cut edges have to be grinded to give them smooth and even surface for proper welding. Welding the flanges to bends and to the pipe pieces at proper ends, and then joining of the suction line to the suction manifold by way of proper welding works in precise manner. Also fitting of sluice valve at appropriate place in the suction line and joining of the other end of the suction line to the pump suction inlet by providing fitting of hexagonal fasteners and rubber insertion sheet. Job also involves creation of a hole of appropriate size in the wall and then properly dressing the hole by cement concrete mix for passing through of the suction line. Delivery Line(1no):- Fabrication of delivery line of dia equivalent to pump outlet dia for each pump set , out of M.S pipe cast steel reflex valve 1 no., cast steel sluice valve 1 No. M.S. bends– qty. as per site requirement M.S. flanges qty. as per site requirement for connecting pump delivery outlet to the delivery manifold. The job involves cutting the pipe in required lengths as per alignment/layout conditions of delivery line at site, the cut edges have to be grinded with grinder to give them smooth and even surface for proper welding. welding the flanges to bends and to the pipe pieces at proper ends in a precise manner, fitting of sluice valve and reflex valve at appropriate place in the delivery line and jointing of one end of the delivery line to pump delivery outlet by providing and fitting of hexagonal fasteners and rubber insertion sheet then jointing the other end of the delivery line to the delivery manifold by creating a hole of required size in the manifold by gas cutting and then jointing to the delivery manifold by way of proper welding work in a precise manner making v-groove all along the circumference of the cut and butt welding. Job also includes creation of a hole in the wall and then dressing to appropriate size by cement concrete mix for passing through it the delivery line of the pump. The whole job includes cost of material i-e., M.S. Pipes, Reflex Valve, Sluice Valve welding rods, M.S. flanges, M.S. bends, nut bolts, rubber insertion sheet, oxygen acetylene gas used and POL used by DG set, hire charges/carriage charges of welding set, DG set, gas cutting apparatus and labour charges for skilled and semi-skilled workers deployed for execution of job. LT control Panel(1 NO):- Installation, Testing and Commissioning of LT Control Panel of 415 volts, AC 3 phase, 50 HZ for motor Installed -132 KW at pump room. Testing and Commissioning of control panel by making connecting to incoming terminals and outgoing terminal of control panel. The job includes providing/ Laying/ fitting of suitable PVC copper conductor properly thimbles at the ends. Testing the performance of the panel on no load and on full load. The job includes the cost of all types of material and labour and carriage charges. Painting:-Cleaning all the surfaces of suction and delivery lines by scrubbing with emery paper, sand paper, wire brushes and then applying a single coat of red oxide primer, drying out at moderate temperature then applying two coats of black synthetic enamel paint for smooth and even shades. Job includes cost of material and labour charges. Cables :-providing and fitting of following size of PVC insulated copper cable with thimbles :- 1. Providing and fitting of copper cables 70sq mm & 50 sq mm. All the cables shall be of requisite current carrying capacity as per the equipment and shall be routed through the flexible conduit and firmly connected to the electric points of stabilizer, main switch starter and motors. Chemical Earthing:- Providing and fixing of Chemical Earthing by way of digging of pit approximately 2Mtr. Providing and fitting of copper electrode with chemical material and Providing and laying of copper wire with proper nut-bolts. Complete job includes cost of material, labour charges, and tools-tackles for working at site. Complete job includes the cost of material and labour charges for skilled and semi-skilled workers deployed for execution of work. Testing Commissioning:-Testing commissioning of the newly installed pumping units pump room along with allied starting and controlling devices for their smooth functioning. Rectifying the faults noticed during testing and also setting, adjusting the instruments of the panel Board , LT Control Panel and tightening of each cable thimbles of electrical points of stabilizer, main switch, starters and motors and realignment/leveling of pump & motor and checking the leakage of water from suction and delivery line if any. Job includes labour charges for skilled and semiskilled workers deployed to complete the job.
PARVEEN ENGINEERING WORKS
Chenab Infrastructure Pvt. Ltd.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .