| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹77.7 LAdmitted-Finance | -0.11% | ₹77.7 L | L1 | Admitted-Finance |
| 2 | L2₹77.8 LAdmitted-Finance | -0.05% | ₹77.8 L | L2 | Admitted-Finance |
Tender Value
₹77.8 L
EMD Value
₹1.6 L
Closing Date
7 Apr 2026, 3:00 pmClosed
Superintending Engineer
Meerut Circle
Tourism Development and Beautification of Sant Shiromunny Ravidas Aashram/Mandir Village Latifpur, Vikaskhand Nakud, District Saharanpur.
2026_UPHDB_1126510_1
834/G-12/23 date 10-03-2026
Open Tender
Civil Works
Percentage
180 days
Village Latifpur, Vikaskhand Nakud, District Sahar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Engineer CD Meerut 04 Saharanpur
₹1.6 L
Yes
18 Apr 2026
18 Mar 2026
7 Apr 2026
18 Mar 2026
7 Apr 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil | 120.52 | cum | 133.11 | ₹16,042.42 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 37.39 | cum | 5,108.49 | ₹1,91,006.44 |
| 3 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | 143.06 | SQM | 232.51 | ₹33,262.88 |
| 4 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 51.5 | cum | 525.32 | ₹27,053.98 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 20.6 | cum | 1,592.65 | ₹32,808.59 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum foundation | 27.43 | cum | 6,783.64 | ₹1,86,075.25 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 40.04 | SQM | 294.08 | ₹11,774.96 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 6.17 | cum | 8,628.26 | ₹53,236.36 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 82.56 | SQM | 720.9 | ₹59,517.5 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 26.36 | cum | 8,628.26 | ₹2,27,440.93 |
stage.html
html • 0.03 MB
technical_2100779.pdf
techsummary_2100779.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
biddocument2_compressed.pdf
Tender Documents • 7.07 MB
BOQ_2100779.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].