Tender Value
Refer Docs
Closing Date
16 Apr 2026, 5:30 amClosed
NHIT Eastern Projects Private Limited
Unit 325, 3rd Floor, D21 Corporate Park, Sector 21, Dwarka, Dhulsiras, New Delhi-110077
Request for Proposal (“RFP”) issued by NHIT Eastern Projects Private Limited (NEPPL) for Engagement of Agency/Firm for Flexible Pavement works on four-lane of Lakhnadon – Mahagaon – Khawasa (NH-44) with a project length of 107.35 km in the state of Madhya Pradesh.
NEPPL/FY26-27/RFP/Lakhnadon – Khawasa/Flexible Pavement Works 02
NEPPL/FY26-27/RFP/Lakhnadon – Khawasa/Flexible Pavement Works 02
RFP
Madhya Pradesh
9 Apr 2026
9 Apr 2026
16 Apr 2026
Milling of existing bituminous pavement to a depth of 50mm and disposal of scarified material within all lifts and leads upto 1000 metres.
Providing and applying tack coat with cationic bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqmt on the prepared bituminous/milled surface and cleaned with mechanical broomer and as per relevant clauses of section-503 of MORTH (Fifth Revision) Technical specifications @ 0.25 kg per sqmt (normal bituminous surfaces) and @ 0.30 kg per sqmt (milled surfaces). Source of Emulsion: Hincol & IOCL only.
Bituminous Concrete Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % by weight of total mix of mix and filler, transporting the hot mix to work site, laying with an Electronic Sensor paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem and pneumatic tyre rollers to achieve the desired compaction as per clause 507 of specification. Source of Bitumen : IOCL/HPCL/BPCL
Providing and laying Mastic Sheet of 3 mm thickness over the deck surface of the structure, including cleaning of deck surface, making the substrate free from dust, dirt, laitance and loose particles, heating, placing and aligning the mastic sheet to the specified location, pressing/rolling to ensure proper bonding, cutting and joint sealing, complete as per specifications and as directed by the Engineer-in-Charge.
Total Amount in Rs.>>
Note: Material & Testing shall be done as per NHAI/MORTH specification
* The Quantities mentioned in BoQ may vary up to ± 25% of original BoQ quantity of single BoQ item subject to maximum of ± 20% of original Contract price. The decision of the Employer shall be final and binding on the contractor
Measurments Sheet
Milling the existing granular road surface to a depth of 50mm and disposal of scarified material within all lifts and leads upto 1000 metres.
Providing and applying tack coat with cationic bitumen emulsion using emulsion pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications.
BITUMINOUS CONCRETE :-Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.25 percent by weight of total mix and filler , transported to site with VTS , laid over a previously prepared surface,finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50mm compacted thickness with specified grade of Bitumen ,Excluding prime/tack coat with Bitumen ( VG40)
Mastic Sheet Providing and Laying of Mastic Sheet of 3 mm thickness
Total Amount in Rs.>>
Measurment Sheet for Maintenance Work (RHS)
Total >>>
Total Qauntity for BC
Total Qauntity for Milling
Total Qauntity for Tack Coat
Measurment Sheet for Maintenance Work (LHS)
Total >>>>
Total Qauntity for BC
Total Qauntity for Milling
Total Qauntity for Tack Coat
CHAPTER-11
HORTICULTURE
For Large Project
Unit = Running metres 200 plants and 800 shrubs in two rows in one km length of road where width of verge is 3m and above.
Taking output = 1000 metres
a) Labour
Mazdoor
b) Machinery
Water tanker6 KL capacity
c) Material
Plants
Shrubs
Manure sludge/Farm yard manure
Pesticide
Cost of water
d) Overhead charges
e) Contractor's profit
Rate per Km = (a+b+c+d+e)
Unit = km
Taking output = one km
a) Labour
Mazdoor
b) Machinery
Water tanker6 KL capacity
c) Material
Manure Sludge / farm yard manure at site
Cost of water
Replacement of casualties @ 10 per cent
Plants
Shrubs
Pesticides
d) Overhead charges
e) Contractor's profit
Rate per Km for one year = (a+b+c+d+e)
Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year
Unit = Each
Taking output = 10 trees
a) Labour
Mazdoor for planting
Mazdoor for maintenance for one year
b) Machinery
Water tanker6 KL capacity
c) Material
Sapling 2 m high 25 mm dia
Farm yard manure
Pesticide
Cost of water
d) Overhead charges
e) Contractor's profit
Cost for 10 trees = a+b+c+d+e
Rate per trees = (a+b+c+d+e)/10
Structure Details
Major
Level Data Sheet For PUP @ 296 + 970( For New Construction )
Earth work Quantity calculation as per P & P from km ( RHS ) ( Considering Earth Filling )
At Median Edge
Service Road Detail
Chainage
Original Proposal
Earth work Quantity calculation as per P & P from km ( RHS ) ( Considering Cutting )
At Median Edge
Service Road Detail
Thk in MM
Total
Chainage
Rutting Locations
Section-I
Total >>>
Section-II
Total >>>
Total Length>>>
Maintenance of Existing Carriagway-Locations
Milling Stretches
Total >>>
Lead Statement as per SSR 2022-23
Stone Aggregate
Bitumen
Heating and Unloading of Bulk Bitumen
Cement
Cement
Steel
Bituminous Concrete Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % by weight of total mix of mix and filler, transporting the hot mix to work site, laying with an Electronic Sensor paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem and pneumatic tyre rollers to achieve the desired compaction as per clause 507 of specification.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
metadata.json
RAW_JSON
RFP - Flexible Pavement 02 LMK NEPPL 09.04.2026.pdf
TENDER_DOCUMENT • 6.39 MB
Annexure C3 BOQ_VJ_F - LK_Flexible+Pavement_Repair-2026.xlsx
TENDER_DOCUMENT • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .