| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-Finance | ₹14.6 L | L1 | Accepted-Finance accept |
| 2 | Rejected-Technical | - | - | Rejected-Technical Required Documents not uploaded |
| Sl No | Description | Qty | Unit | V.ANBURAJA H1 |
|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 40 | m3 | 263.5 ₹10,540 Lowest |
| 2.00 | Supplying and Filling foundation and basement with filling M sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 12 | m3 | 362.4 ₹4,348.8 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 16 | m3 | 5,639.6 ₹90,233.6 Lowest |
| 4.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete | 30 | m3 | 7,574.9 ₹2,27,247 Lowest |
| 5.00 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 2,300 | kg | 91.8 ₹2,11,140 Lowest |
| 6.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | ||||
| 6.01 | Below Basement | 74 | m2 | 489 ₹36,186 Lowest |
| 6.02 | Above Basement | 133 | m2 | 978 ₹1,30,074 Lowest |
| 7.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | ||||
| 7.01 | Below Basement | 10 | m3 | 8,099 ₹80,990 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹18,000
Closing Date
23 Feb 2026, 3:00 pmClosed
Executive Officer
Executive Officer Uthiramerur Town Panchayat
MLA Fund 2025-26 -Construction of PDS shop in Karuneegar street in Uthiramerur Town Panchayat
2026_DTP_658307_1
40/2026
Open Tender
Civil Works
Works
Uthiramerur Town Panchayat
As per Tender documents
3 documents required · 3 mandatory
₹0
₹18,000
Yes
3 Jun 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 40 | m3 | - | - |
| 2 | Supplying and Filling foundation and basement with filling M sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 12 | m3 | - | - |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 16 | m3 | - | - |
| 4 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete | 30 | m3 | 1 | ₹30 |
| 5 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 2,300 | kg | 1 | ₹2,300 |
| 6Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | |||||
| 6.01 | Below Basement | 74 | m2 | 65 | ₹4,810 |
| 6.02 | Above Basement | 133 | m2 | 65 | ₹8,645 |
| 7Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | |||||
| 7.01 | Below Basement | 10 | m3 | 65 | ₹650 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tendernotice.pdf
Tender Documents • 0.95 MB
BOQ_789752.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].