Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹446.4 CrAdmitted-Finance NTPC LIMITED EPROCUREMENT PORTAL | ₹446.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹472.1 CrAdmitted-Finance | ₹472.1 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Power Mech Projects Limited L1 | Rds Project ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Currency 1 (INR) | 1 | Lumpsum | 4,46,40,00,000 ₹446.4 Cr | 4,72,10,00,000 ₹472.1 Cr |
| 2.00 | Currency 2 (JPY) | 1 | Lumpsum | - | - |
| 3.00 | Currency 3 (USD) | 1 | Lumpsum | - | - |
Tender Value
₹497.7 Cr
EMD Value
₹5.0 Cr
Closing Date
6 Jan 2020, 11:00 amClosed
A K Singh
Sanjeev Malik Executive Director-III National Highways and Infrastructure Development Corporation Limited
widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 (Package- 7) on Aizawl-Tuipang Section of NH-54 in the State of Mizoram on EPC mode with JICA loan assistance.
2019_NHIDC_525276_1
NHIDCL/ NH-54-Miz-2017-18-158 /Package-7
Open Tender
Civil Works
1278 days
Mizoram
Please refer Tender documents.
5 documents required · 5 mandatory
₹50,000
Yes
GM NHIDCL
₹5.0 Cr
NHIDCL HQ
24 Aug 2020
6 Dec 2019
7 Jan 2020
6 Dec 2019
6 Jan 2020
26 Dec 2019
6 Dec 2019 - 20 Dec 2019
20 Dec 2019
Amount
Currency 1 (INR)
Currency 2 (JPY)
Currency 3 (USD)
Rds Project ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid