Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance 117 108 P BLOCK HITKARI NAGAR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.9 LRejected-Finance 804 2 P BLOCK KAKADEV KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹9.9 LRejected-Finance 180 A VIKAS NAGAR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.9 L | L3 | Rejected-Finance L3 |
Tender Value
₹10.0 L
EMD Value
₹99,538
Closing Date
17 Dec 2025, 3:00 pmClosed
C.E office
c.e office motijheel kanur nagar nigam
Improvement of fish market mal road to Ambedakar chauk ward-76 zone-1
2025_NNKAN_1095437_1
145/AA-1/2024-25
Open Tender
Civil Works
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,538
Yes
3 Apr 2026
6 Dec 2025
17 Dec 2025
6 Dec 2025
17 Dec 2025
6 Dec 2025
W in Surface Excavation no esconding 10 cm in depth but eccending 1.5 im width as well en 10 sqm on plan inchading petung out and disposal of excavated carth up to 50m and lift up to 15 man directed by the engineer in charge etc all comp
construction of granular sub base (GSB) BY providing course graded material spreading in unifrom layer etc all comp
Providing and applying tack coat with bitumen VG-10using bitumen presure distributer @ 0.30 kg/sqm (VG-10) on the prepared bitumen/granular surface cleaned ith machainical broom
Dense Graded Bituminous Macadam (DGBM) Providingand Laying dense Graded Bitumiminour macadam with 60-90 TPH batch HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading permixed with bituminour [email protected] percent by weight of total mixand filer transporting the hot mix plant to work site laying with hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandem rollers to acheive the desired compaction as per Morth Speification clause No 507 complete in all respects:
Providing and laying bitumenous concrete(B.C) with 100-120 ΤΡΗ hot mix plant producing an average out put of 75 tonnes per hour using crused aggrigtes of specified grading premixed with bituminous binder(CRMB-55)@5.4% of mix, subject to job mix
Disposal of surplus soil from site to up to 3.00km lead etc all comp.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2014921.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_2014921.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid