Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
6 Aug 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
(PH-31)
ENGG
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V which ever is less ; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b)(1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.
Defination of Similar Work :- Any Civil Engineering work consisting of execution of earthwork in formation and any type of bridges. Note: If tendered work does not include minor bridges, it should be deleted from Similar work also.
21 conditions · 8 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The original BG (in lieu of Bid Security) should be delivered in person or through post/courier so as to reach the official nominated (i.e.OS/Tenders/Engg/HYB Division) within before closing date for submission of bids.(i.e., excluding the last date of submission of Bids). Railway will not assume any responsibility for any delay in case the BG is sent through courier/postal department. Any BG received by post/courier on or after the closing date of bid submission shall not be taken.
AII the instructions furnished in the Technical Compliance / Commercial Compliance / Custom / Undertakings / General instructions / Undertakings are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
Tender value is including escalation of (-)15% (minus Fifteen percent) on CPWD DSR rates. Tenderer should note this before quoting the rates
Secunderabad-Mahbubnagar (UP&DN) - Re-alignment of curves - 4 Nos.
88_DRM_W_HYB_26
88_DRM_W_HYB_26
Open
Works - General
12 Months
Hyderabad, Telangana
₹0
₹6.7 L
6 Aug 2026
15 Jul 2026
23 Jul 2026
74 items across 4 schedules · ₹3,34,44,973.99 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| lift | — | — | — | — | |
| 1 | Turfing with sods, 10cm thick and 20cm square closely laid. | 100 Sqm | 1700.00 | 5,867.53 | 99,748.01 |
| and at the of be of | — | — | — | — | |
| 2 | With 3 horizontal bamboo / balli members of minimum 50mm dia. spaced equally | RM | 3000.00 | 134.69 | 4,04,070 |
| on for by | — | — | — | — | |
| 3 | Up to 40 m long rail panel | RM | 5400.00 | 7.89 | 42,606 |
| 4 | of of of to 3.A be or | ERC | 1500.00 | 44.66 | 66,990 |
| by | — | — | — | — | |
| 5 | Rail section of 52Kg and above | Each | 300.00 | 110.77 | 33,231 |
| 6 | per of by | TRM | 8000.00 | 22.66 | 1,81,280 |
| the all | — | — | — | — | |
| 7 | Under Traffic Block Conditions: | cum | 3750.00 | 45.35 | 1,70,062.5 |
| 8 | & the all as of of be 1. P. per | Each | 130.00 | 1,443.86 | 1,87,701.8 |
| 9 | all to line as of | cum | 5000.00 | 44.61 | 2,23,050 |
| and bed the of & per etc. in for | — | — | — | — | |
| 10 | km | TRM | 2600.00 | 255.83 | 6,65,158 |
| 11 | the to out of of as | Each | 16.00 | 55,660.88 | 8,90,574.08 |
| any line to all in- | — | — | — | — | |
| 12 | Maximum Shifting / Slewing up to 1 metre | TRM | 2580.00 | 178.64 | 4,60,891.2 |
| 13 | 1 | TRM | 1030.00 | 214.4 | 2,20,832 |
| of a of per of 25 | — | — | — | — | |
| 14 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 4900.00 | 118.77 | 5,81,973 |
| lift. rail site of of (3) be if | — | — | — | — | |
| 15 | Without Rail tensor | TRM | 6000.00 | 43.36 | 2,60,160 |
| 16 | cut of out or of by (2) of | Each | 45.00 | 1,567.39 | 70,532.55 |
| (3) (4) of in / 1. or the pre the in out of | — | — | — | — | |
| 17 | For day time block working | TRM | 4000.00 | 16.42 | 65,680 |
| 18 | For night time block working | TRM | 4000.00 | 18.4 | 73,600 |
| per not be of the If per | — | — | — | — | |
| 19 | BCM/FRM/UNIMAT (7.5 KVA generator and 12x500 W) | Night | 26.00 | 3,524.13 | 91,627.38 |
| 20 | CSM / DUO / 3X with or without DGS (7.5 KVA generator and 8x500 W) | Night | 26.00 | 3,310.06 | 86,061.56 |
| all lift in- per of Rail per of | — | — | — | — | |
| 21 | 60 Kg - 110/90 UTS - Outside Track | Each | 300.00 | 212.2 | 63,660 |
| 22 | 60 Kg - 110/90 UTS - On Running Line | Each | 300.00 | 270.31 | 81,093 |
| all all by No. | — | — | — | — | |
| 23 | Outside Track | Each | 600.00 | 50.55 | 30,330 |
| 24 | On Running Line | Each | 600.00 | 64.84 | 38,904 |
| 25 | on the | Each | 150.00 | 34.01 | 5,101.5 |
| end & | — | — | — | — | |
| 26 | With Contractor's hard wood block | Each | 40.00 | 2,736.89 | 1,09,475.6 |
| to or on and to of all | — | — | — | — | |
| 27 | size | Each | 30.00 | 6,231.22 | 1,86,936.6 |
| 28 | of to | Each | 30.00 | 5,388.98 | 1,61,669.4 |
| as | — | — | — | — | |
| 29 | For erection | Each | 60.00 | 220.96 | 13,257.6 |
| 30 | For removal | Each | 60.00 | 179.15 | 10,749 |
| by | — | — | — | — | |
| 31 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 450.00 | 870.14 | 3,91,563 |
| Schedule total | ₹59,68,568.78 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SpecificationsforTrackBallast.pdf
ATTACHMENT
ConditionsCurves.pdf
ATTACHMENT
SpecialConditionsforPaymentofSteel_1.pdf
ATTACHMENT
LaboratorySplconditionslatest.pdf
ATTACHMENT
ContractorseMBrecord.pdf
ATTACHMENT
GCC2022_compressed.pdf
ATTACHMENT
concretemixdesignsystemimprovements.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf Approved brand
ATTACHMENT
Tenderdocument24.09.2024_1.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .