Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-Finance MAHESMATI MALDA | L1 | Accepted-Finance Offered lowest rate | |
| 2 | L2₹43.8 L+₹54,213.79 (1.25%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹44.2 L+₹99,502.19 (2.30%)Rejected-Finance 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
7 Oct 2024, 5:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Supply, installation, commissioning and trial operation of electro-mechanical components at Arsenic Iron Removal Plant of Araidanga (Zone-II) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte.
2024_PHED_745723_9
WBPHED/EE/MLMD/NIeT_13 of 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
120 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.1 L
Yes
14 Nov 2024
18 Sept 2024
21 Oct 2024
18 Sept 2024
7 Oct 2024
18 Sept 2024
Amount
Supply, Delivery and storage at site of horizontal Split casing Centrifugal Pumping Machineries with baseplate, flexible coupling, coupling guard, foundation bolt etc. having the following specification : (Pumps suitable for PLC operated unmaned operation facility and pumping water from CWR to OHR) Discharge :- 78 m3 per hour Generated Head :- 35 MWC This item will be procured based on yield test report of T/W and best efiiciency point as per direction of EIC. H-Q-P Curve of pumps in test bed has to be submitted during the delivery.
Supply, Delivery and Storage at site horizontal foot mounted induction motor suitable for the pump duty mentioned above in item no. 1.00 with adequate margin conforming to IE 4 energy efficient, 1440 RPM, AC, 3 Phase, 50 Hz. +/- 5%, 415 V +/- 10%, Class F insulation with temperature rise limit to Class F/B insulation, Ambient temperature 50 degree centrigade conforming to IS/IEC 60034, IP 55, S1 duty as per technical specification. Routine test certificate of Induction Motor has to be submitted during delivery
Supply, delivery and storage at site 150 mm dia double flanged Cast Iron manually operated non-rising spindle sluice valve generally conforming toIS:14846 PN-1.0.:-N.B. : Test Certificate to be produced for each valve. (AT SUCTION SIDE OF PUMP )
Supply, delivery and storage at site of CI doble flanged single door swing check 150 mm dia N.R.V as per IS : 5312, Part-I, PN-1.0. :-N.B. : Test Certificate to be produced for each valve. (AT DELIVERY SIDE OF PUMP)
Cast Iron Wafer type Three phase Actuator (Rotork range, three phase 415 V,multiturn electrically actuated) operated Butterfly Valve of dia 150 mm (P.N-1.0) as per (IS-13095 IP-68) Test Certificates from both the manufacturer are to be submitted at the time of delivery (AT DELIVERY SIDE OF PUMP)
Supply, delivery and storage at site 150 mm dia double flanged Cast Iron manually operated non-rising spindle sluice valve generally conforming toIS:14846 PN-1.0.:-N.B. : Test Certificate to be produced for each valve. (AT COMMON DELIVERY HEADER )
Supply, delivery and storage at site 80 mm dia Cast Iron kinetic double orifice air released valve as per relevant IS, PN-1.0. :-N.B. : Test Certificate to be produced for each valve. (AT COMMON DELIVERY HEADER )
Supply, Delivery and Storage at site MS Dismantling Joint DN 150 mm PN 1.0 ( for Delivery side of pump )
Supply, Delivery and Storage at site MS Dismantling Joint DN 150 mm PN 1.0 ( for Common header of pump )
Supply, Delivery and Storage at site Bourdon type pressure & compound gauges, 150 mm dia cast Aluminium Dial with , SS internal, DN 15 GI impulse line with three way cock. Pressure Guages (0 - 15 kg/cm2)
Supply, Delivery and Storage at site of 150 mm dia , thickness 5.4 mm MS Black Pipe conforming to IS:1239 PART-1 (2004) (For Suction, Delivery & Delivery Header) along with necessary fittings viz. flanges, bolts, nuts, gaskets , 150 mm X 125 mm Ecentric Reducer, concentric enlarger 150 X 100 mm etc. as reqd. to make the installation complete in all respect.
Supply, Delivery and Storage at Site 2 mm. thick CRCA Sheet Steel Enclosed Cubical type Indoor Floor Mounted 415 Volt PDB cum MCC Panel having required Feeders with PLC. Incomer (125 A)- 2 nos, Outgoing feeder(20 HP, S-D)- 2 nos, Valve Actuator Starter-2 nos, Cholrinator Starter (1 HP, DOL)- 1 no, PLC cum Control starter- 1 no , Power Feeder.
200 Amps, 415 V Porcelin based rewireable type male female kit Kat fuse unit with extension strip
Supply, Delivery and storage at site 1.1 KV Grade 50 mm2 3½ core XLPE insulated Al. armoured Cable
Supply, Delivery and storage at site 1.1 KV Grade 10 mm2 3 core XLPE insulated copper Cable. (From MCC Panel to motor. )
Supply, Delivery and storage at site 1.1 KV Grade 25 mm2 4 core XLPE insulated Aluminiun armoured Cable. (From AIRP Pump house to Tube Well Site )
Supply, Delivery and storage at site 1.1 KV Grade 6 mm2 3 core XLPE insulated Al. armoured Cable (From MCC Panel to actuator for power )
Supply, Delivery and storage at site 1.1 KV Grade 1.5 mm2. 12 core pvc insulated Copper control Cable (From MCC Panel to actuator for control )
Supply, delivery and storage at site of Electromagnetic Type Flowmeter with separate transmitter with suitable length interconnecting cable for measuring flow of clear water. Flow sensing element shall have IP 68 degree of protection. Flow meter shall be opearted at 220 V and shall have flow rate and flow totalisation (DN 150 mm)
Providing earthing & lightning protection for Pump house and electrical installation as per ISS and IE rules. (Earth pit 2 nos + 2 L/A)
Supply and fixing of GI perforated cable tray at Pump house for laying of incoming & outgoing power and control cables to and from MCC Panel, motor and other electrical accessories having proper M.S. structural support as per direction of EIC.
Supply delivery at site and storage of indoor illumination arrangement like suitable size wire, switch ,switch board ,tube light fitting ,exhaust fan ,ceilling fan , LED outdoor fixture complete as per NIT specification.
Supply delivery at site and storage of safety equipment like suitable capacity Fire Extinguisher , sand bucket ,fire bracket, rubber mats, shock treatment chart and first aid box,chair ,table ,415 volt danger board complete.
Supply, delivery and storage at site of automatically controlled 0-200 LPH and maximum pressure of 12kg/cm2 diaphragm type Chlorinator with built in relief valve & diaphragm rupture indicator, pressure gauge, pressure switch, base plate, flexible coupling guard for pump & motor, foundation boltn suction and discharge flange and with storage tank of dosing solution of 200 Ltr. capacity and the prime mover to be coupled with pump of 2 HP, 3 phase, 1450 RPM squirrel cage induction motor, Motor will be IE2/IE3. for accurate dosing of Chlorine solution into the water by connecting metering pump. (Make of machine as per attached vendor list of PHED)
Installation and commissioning of the above supplied chlorinator with all accessories, PVC tank and drawing of power line as per IE Rule by supplying of necessary wire and continuous earthing. This cost include the cost of all necessary CC foundation (atleast 200mm height) with concerete mixture ( Sand, cement, stone, chips) and neat cement finish by supplying of all required materials and testing the entire set as per direction of EIC. (Power will be feed from PLC panel of pumping machinery)
Supply delivery and installation storage of 40 KVA Power Correction arrangement.
Installation of all items as mentioned in Sl.No. 01 to 19 including construction of Pump foundations, pipe supports, valve supports, laying of cables with necessary jointing materials, earthing arrangement of motors, starters, including supply of all erection items viz. rubber gaskets, nuts & bolts etc., including cost of welding etc. as required for complete installation including making slope of floor and arrangement of removing gland leckage water as per Hydraulic standard & IE rules in compliance upto entire satisfaction of EIC.
Painting of the installation (viz. pumps,valves, pipe lines etc. by two coats of epoxy paint (colour to be decided by EIC) over a coat of primer as per direction of EIC.
Testing & Commissioning of the entire installation i.e. Pumps, Motors,valves etc. as in Sl no. 1 to 19 as per direction and to the entire satisfaction of E.I.C.
ADD GST @ 18%
ADD Cess @ 1%
DEY ENTERPRISE (BID ID -5672110)
DAS CONSTRUCTION (BID ID -5674984)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .