Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
| 5 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
8 Apr 2026, 6:00 pmClosed
Executive Engineer
PMGSY Division Thathri
Permanent Restoration work of PMGSY Division Thathri
2026_JKRRD_147069_12
Permanent Restoration work
Open Tender
CIVIL
Percentage
45 days
Thathri
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer
₹1.1 L
23 Apr 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:: All kinds of Soil | 726.04 | Cum | 256.85 | ₹1,86,483.37 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 27.38 | Cum | 6,591.25 | ₹1,80,468.43 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | 312.33 | Cum | 5,402.9 | ₹16,87,487.76 |
| 4 | Dry Random Rubble Masonary with hard stone in foundation and plinth: (Without bond Stone) Nallah | 228.67 | cum | 2,793.8 | ₹6,38,858.25 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering.All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 58.96 | cum | 5,733.6 | ₹3,38,053.06 |
| 6 | Back filling with stones behind abutment, wing walls and return walls complete as per drawing and technical specifications. Stone Boulder Nallah nominal size 225mm: | 183.96 | Cum | 937.9 | ₹1,72,536.08 |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1
cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 62.8 | sqm | 416.5 | ₹26,156.2 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 161.6 | sqm | 286.35 | ₹46,274.16 |
| 9 | Hand-packing stones in wire-crates; including cost of stones and excluding Cost of Crates | 1,062.72 | cum | 1,071.15 | ₹11,38,332.53 |
| 10 | supply of Wire- Crates with 4mm dia G I Confirming to IS 280 &4826 in 100mmX100mm incl. 10% extra for laps and Joint incliding all lead lift and Carriages | 123 | No | 6,000 | ₹7,38,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.29 MB
BOQ_228623.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .