Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹22.5 Cr+₹1.5 Cr (7.31%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹23.2 Cr+₹2.2 Cr (10.7%)Admitted-Finance 1ST FLOOR CHITRAKOOT 230 A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | L3 | Admitted-Finance | |
| 4 | L4₹24.5 Cr+₹3.6 Cr (17.0%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Veenus Engineering L2 | AKA Logistics Private Limited L3 | STAR OANDM GROUP L4 | PHOENIX SOLUTIONS L1 |
|---|---|---|---|---|---|---|---|
| 1.00Rates for Part A | |||||||
| 1.10 | Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Apron Feeders, Dribble feeders, Conveying Systems, Transfer Chutes, Skirt Boards, Grizzly Feeders, Roller Screens, Coal Crushers, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors etc. The work also includes all types of maintenance such as Mechanical / Electrical / C&I (PLC) of all CHP equipments. Operation and Maintenance of Dust Extraction system, Dust Suppression System, Coal Sampler & Analyzer system, Ventilation system, Water sprinkling System, Pre wetting system, AC system, Sump Pumps, Compressors (De-watering Pump), Dewatering of tunnels and trenches including railway demurrage charges. (As per detailed scope of work attached as Annexure-VI). | 12 | Per Month (for 1st year) | 1,17,41,184.47 ₹14,08,94,213.64 | 1,21,38,150.27 ₹14,56,57,803.24 | 1,28,42,048.4 ₹15,41,04,580.8 | 1,09,54,619.23 ₹13,14,55,430.76 Lowest |
| 1.20 | Operation of equipment for feeding coal to the bunkers of Unit-I | 12 | Per Month (for 1st year) | 1,34,983.47 ₹16,19,801.64 | 1,39,547.22 ₹16,74,566.64 | 1,47,639.64 ₹17,71,675.68 | 1,25,940.66 ₹15,11,287.92 Lowest |
| 1.30 | Operation of equipment for feeding coal to the bunkers of Unit-II | 12 | Per Month (for 1st year) | 1,34,983.47 ₹16,19,801.64 | 1,39,547.22 ₹16,74,566.64 | 1,47,639.64 ₹17,71,675.68 | 1,25,940.66 ₹15,11,287.92 Lowest |
| 1.40 | Cleaning and House Keeping of entire Coal Handling Plant including Control Rooms, Electrical Rooms, Buildings, open cable trenches, Wagon Tipplers, Apron Feeders, Dribble feeders, Transfer Chutes, Skirt Boards, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors and Coal Bunkers etc. Deployment of Stone Pickers for picking of stones, and other foreign material from running conveyors, removal of wild grass etc including Horticulture & Beautification activities of complete CHP, Cleaning of Road, Trenches, Drains in CHP area etc. (As per detailed scope of work attached as Annexure-VI). | 12 | Per Month (for 1st year) | 12,80,857.48 ₹1,53,70,289.76 | 13,24,162.87 ₹1,58,89,954.44 | 14,00,951.82 ₹1,68,11,421.84 | 11,95,050.29 ₹1,43,40,603.48 Lowest |
| 1.50 | Operation & Maintenance of Heavy Machinery such as Diesel Locomotives, Bulldozers, Loaders, Cranes, Dumpers and Excavators etc. (As per detailed scope of work attached as Annexure-IX). | 12 | Per Month (for 1st year) | 8,52,039.21 ₹1,02,24,470.52 | 8,80,846.39 ₹1,05,70,156.68 | 9,31,927.16 ₹1,11,83,125.92 | 7,94,959.41 ₹95,39,512.92 Lowest |
| 1.60 | Upkeep/Maintenance of Marshalling yard (As per detailed scope of work attached as Annexure-X). | 12 | Per Month (for 1st year) | 4,93,300.64 ₹59,19,607.68 | 5,09,978.98 ₹61,19,747.76 | 5,39,552.94 ₹64,74,635.28 | 4,60,253.45 ₹55,23,041.4 Lowest |
| 1.70 | Charges per MT for Collection and preparation of coal samples from Indian coal rakes at RGTPP. (As per detailed scope of work attached as Annexure-XI). However, firm will be paid monthly charges on the basis of actual quantity of Indian coal received in that month. | 44,58,000 | Per MT (for 1st year) | 0.55 ₹24,51,900 | 0.56 ₹24,96,480 | 0.6 ₹26,74,800 | 0.51 ₹22,73,580 Lowest |
| 1.80 | Charges per MT for Collection and preparation of biomass samples from trucks received at RGTPP. (As per HPGCL SOP). However, firm will be paid monthly charges on the basis of actual quantity of biomass accepted. | 3,90,000 | Per MT (for 1st year) | 5.24 ₹20,43,600 | 5.41 ₹21,09,900 | 5.73 ₹22,34,700 | 4.89 ₹19,07,100 Lowest |
| 1.90 | Charges per rake for Videography of complete sampling and analysis of imported coal (As per detailed scope of work attached as Annexure-XII). However, firm will be paid monthly charges on the basis of actual number of imported rakes received in that month. | 70 | Per Rake (for 1st year) | 8,042.41 ₹5,62,968.7 | 8,314.32 ₹5,82,002.4 | 8,796.47 ₹6,15,752.9 | 7,503.63 ₹5,25,254.1 Lowest |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
25 Aug 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NEERAJ SACHDEVA
CE RGTPP Khedar Hisar
Operation and Maintenance of 2400 TPH Automated CHP at RGTPP, Khedar
2026_HBC_536824_1
202653496AE4 603F 4EE9 AA51 A606FCF10CF7712PGC
Open Tender
Civil Works
Works
1185 days
KHEDAR
As per NIT
2 documents required · 2 mandatory
₹1,180
₹50 L
Yes
14 Sept 2026
27 Jul 2026
27 Aug 2026
27 Jul 2026
25 Aug 2026
27 Jul 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rates for Part A | |||||
| 1.1 | Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Apron Feeders, Dribble feeders, Conveying Systems, Transfer Chutes, Skirt Boards, Grizzly Feeders, Roller Screens, Coal Crushers, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors etc. The work also includes all types of maintenance such as Mechanical / Electrical / C&I (PLC) of all CHP equipments. Operation and Maintenance of Dust Extraction system, Dust Suppression System, Coal Sampler & Analyzer system, Ventilation system, Water sprinkling System, Pre wetting system, AC system, Sump Pumps, Compressors (De-watering Pump), Dewatering of tunnels and trenches including railway demurrage charges. (As per detailed scope of work attached as Annexure-VI). | - | Per Month (for 1st year) | - | - |
| 1.2 | Operation of equipment for feeding coal to the bunkers of Unit-I | - | Per Month (for 1st year) | - | - |
| 1.3 | Operation of equipment for feeding coal to the bunkers of Unit-II | - | Per Month (for 1st year) | - | - |
| 1.4 | Cleaning and House Keeping of entire Coal Handling Plant including Control Rooms, Electrical Rooms, Buildings, open cable trenches, Wagon Tipplers, Apron Feeders, Dribble feeders, Transfer Chutes, Skirt Boards, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors and Coal Bunkers etc. Deployment of Stone Pickers for picking of stones, and other foreign material from running conveyors, removal of wild grass etc including Horticulture & Beautification activities of complete CHP, Cleaning of Road, Trenches, Drains in CHP area etc. (As per detailed scope of work attached as Annexure-VI). | - | Per Month (for 1st year) | - | - |
| 1.5 | Operation & Maintenance of Heavy Machinery such as Diesel Locomotives, Bulldozers, Loaders, Cranes, Dumpers and Excavators etc. (As per detailed scope of work attached as Annexure-IX). | - | Per Month (for 1st year) | - | - |
| 1.6 | Upkeep/Maintenance of Marshalling yard (As per detailed scope of work attached as Annexure-X). | - | Per Month (for 1st year) | - | - |
| 1.7 | Charges per MT for Collection and preparation of coal samples from Indian coal rakes at RGTPP. (As per detailed scope of work attached as Annexure-XI). However, firm will be paid monthly charges on the basis of actual quantity of Indian coal received in that month. | 0.1 | Per MT (for 1st year) | - | - |
| 1.8 | Charges per MT for Collection and preparation of biomass samples from trucks received at RGTPP. (As per HPGCL SOP). However, firm will be paid monthly charges on the basis of actual quantity of biomass accepted. | 0.58 | Per MT (for 1st year) | - | - |
| 1.9 | Charges per rake for Videography of complete sampling and analysis of imported coal (As per detailed scope of work attached as Annexure-XII). However, firm will be paid monthly charges on the basis of actual number of imported rakes received in that month. | - | Per Rake (for 1st year) | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_615962.xls
BOQ • 0.34 MB
corrigendum.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .