Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | ₹10.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.9 LRejected-Finance A 15 ASHOK PURAM COLONY HAFIZBAGH VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹10.9 L | L2 | Rejected-Finance Higher Rate |
| 3 | L3₹10.9 LRejected-Finance FATEHPUR | ₹10.9 L | L3 | Rejected-Finance Higher Rate |
| 4 | L4₹11.0 LRejected-Finance | ₹11.0 L | L4 | Rejected-Finance Higher Rate |
| 5 | L5₹11.5 LRejected-Finance NONE | ₹11.5 L | L5 | Rejected-Finance Higher Rate |
Updated dates
Tender Value
₹19.8 L
EMD Value
₹2.0 L
Closing Date
17 Feb 2026, 12:00 pmClosed
Office of the EE PD PWD Pratapgarh
Office of the EE PD PWD Pratapgarh
Renewal of Bichhur Praimery school To Beerapur bazar Link Road
2026_CEALD_1112428_98
227/26M/E-Tendering/2026 Dated 24.01.2026
Open Tender
Civil Works - Roads
60 days
Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.0 L
5 Jun 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
Particulars of works
Providing, laying, spreading and compacting stone aggregates of 53-22.4 mm sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type-B of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 3 as per MORD Specification.405 incluidng labour cess,Royalty. Quarry from Shankargarh (Excluding GST)
Providing and applying tack coat with bitumen using bitumen VG-10, pressure distributor @ 0.30 Kg/Sqm. on the prepared bitumin surface cleaned with hydralic broom, As per MORD specification 503 (Excluding GST)
Providing, laying and rolling of open - graded premix surfacing of 20 mm compacted thickness with 13.2 mm crushed stone grit @ 0.18cum/10sqm and 11.2 mm size crushed stone grit @ 0.09cum/10sqm from approved quarry and bitumen @ 1.46Kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, also mixing in a suitable plant or by mixall, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades, including cost of material, labour, plant, machinery and T&P. Complete as per MORD Specification No.508(II) .including the cost of bitumenVG-10, Labour T&P etc.(Excluding GST)
Providing and laying seal coat type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.5 mm crushed stone grit @ 0.09cum/ 10sqm from approved quarry and bitumen/emulsion @0.65kg/sqm including cost of material, labour, plant, machinery, mixall and T&P. Complete as per MORD Specification No.510(ia) including the cost of bitumen VG-10, Labour T&P etc.(Excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_2060215.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid