Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.7 LAccepted-AOC COLABA MUMBAI | L1 | Accepted-AOC L1 | |
| 2 | L2₹58.8 L+₹1.7 L (2.91%)Rejected-Finance COLABA MUMBAI | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹59.9 L+₹2.7 L (4.80%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹59.9 L+₹2.8 L (4.88%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L4 | Rejected-Finance Being other than lowest | |
| 5 | L5₹60.7 L+₹3.5 L (6.20%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L5 | Rejected-Finance Being other than lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
13 Apr 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIRS ROUTINE MAINT OF 06 NOS ELECTRIC LIFTS 08 PS13 PS LIFT MAKE OTIS AND MANNING AND OPERATION OF LIFTS FOR BLDG NO R1 R2 R13 R19 R26 R31 R33 R34 ASHA2 ASHA 4 ASHA5 TOTAL 11 NOS BUILDING IN G 14 STOREY BUILDING AT NAVY NAGAR, RS COLABA UNDER GE N
2023_MES_582609_2
8137/CWE (NW) /E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.1 L
Yes
25 Apr 2023
20 Mar 2023
15 Apr 2023
20 Mar 2023
13 Apr 2023
30 Mar 2023
20 Mar 2023 - 28 Mar 2023
Amount
Schedule A -Part- I Repairs/maintenance of lifts including carrying out daily check and periodical services of fully automatic electrical lift with power operated door simplex, collective control system with repair/maintenance of unserviceable damaged parts such as bearings bushes all type of shoes headers, hangers, car door, door locks, control cards, connector/links, welding of cracked/broken MS parts, Repairs/maintenance of unserviceable damaged door safety edge or sensor mechanical safety lock, magnetic lock or contact, car position indicator, door sill, car door sill necessary wiring hall push button assembly,Landing Operating Panel of any Size and capacity including all connected Accessories, complete with illuminated push button & direction indicator with LED display with LPT/LPC card of stainless steel inclusive of harness wiring for luminating of push button of each floors and cutting wall making good distrubed surface with masonary work to make with existing surface & cable as per requirement or safe operation of lifts minor repair to cabin, cabin light, fan etc, ensuring safety and smooth functioning of lift and disconnecting and repairs/maintenance of unserviceable/worn out parts such as warm wheel, warm shaft bushes, thrust bearing and pedestal bearing and necessary packing including overhauling, cleaning alignment of gear box assembly and after Repairs/replacement of wornout parts re-assembling and fixing with existing machine with proper alignment including complete maintanance of car top, binding of loose wire at control panel and rust painting at car top and door and allied parts with testing complete as specified and directed by Engineer-in-Charge for the following lifts :- Note : - Two mechanics shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift to carry-out rescue operation.
8 Ps (544 Kg) capacity in bldg(G+14), R-19, R-21, R-32, R-33 and Tula (Total 05 Nos lift).
13Ps (884 Kg) capacity in bldg(G+14) R-32 (Total 01 Nos lift).
Taking down old unserviceable STM- Belt PV30 -1.73S-PU-42 and supply and fixing STM- Belt PV30 -1.73S-PU-42 complete all as specified and directed by Engr in Charge
Disconnecting and taking out old/unserviceable Governer rope of size 8 mm dia(8/19 Construction) ungalvanised including necessary connection with pully in machine room and shaft pit complete with clamps, nuts bolts, and washers etc, for high rise building for 8/13/Goods lifts complete all as specified and directed by Engr in Charge
Taking down old unserviceable CEGARD MINI w/Y Cable harness along with control box and supply and fixing CEGARD MINI w/Y Cable harness along with control box in full height( 2.00 Mtr) as specified and directed by Engineer-in-Charge.
Taking Out Old unserviceable Retrofit Belt pulley and supply and fixing retrofit belt pulley complete all as specified and directed by Engr-in-Charge.
Replacement of automatic door drive unit with VVVF of 1 HP capaicity all as specified and directed by Engineer-in-Charge.
Dismantling and taking out unserviceable old landing push button box along with illuminated call button with control wiring and supply & fixing landing push button box alongwith illuminated call button with control wiring for G+14 storey building complete all as directed by Engineer-in-Charge.
Dismantling and taking out unserviceable old control panel and control wiring and supply and fixing new CAN BAS Integrated Drive based collective control panel in hinged MS powder coated cabinet with control wiring comprising with multiple microcontrolled programmed chip based, controlled by pulse modulation, complete with all safeties such as thermal overload protection, over current protection, auto phase reverse link to each other in net work and compatible to 18 KW/24HP capacity VVVF drive including proper connection with proper lugs, terminal connectors, screws and motor connection with galvanised sheet trunking 24 SWG including wiring of main motor with suitable size of stranded copper cable etc complete all as specified and directed by Engineer-in-Charge.
Disconnecting and taking out old/unserviceable shaft wiring, supply and fixing of shaft wiring in hoist way upto lower limit with PVC insulated copper conductor cable single core, 1100 Volts grade 0.75 Sqmm 24 Nos single core & 1.0 Sqmm for earth wire duly bunched with wire binding locking strip, drawing through in and including galvanised sheet metal trunking of 24 SWG up to ground floor in hoist for control to all function including in built connection for control panel, PCB, Hall push button, fire switch and lower limit switch all as specified and directed by the Engineer-in-Charge. for G+14 Storey building.
Disconnecting and taking out defective unserviceable main drive (any type) from existing control panel and supply and fixing CAN BAS Integrated drive suitable for 13 Ps lift G+14 storey building complete with all electric connection complete all as specified and directed by Engr in Charge
Disconnecting and taking out defective dynamic breaking resistance from controller and supply and fixing new aluminium covered wire wound dynamic breaking resistor to absorb the reverse energy dissipation of motor during regeneration in control operation suitable for 11.0KW/15HP motor complete all as specified and directed by Engr in Charge
Disconnecting and taking out unserviceable ARD and repair of ARD for proper operation including necessary wiring with machine and controller consisting of the following :-
Replacement of PCB Card, relay with control wiring for G+14 storey building complete all as specified and directed by Engr in Charge
Replacement of unserviceable ARD control system and commissioning and testing of new ARD system suitable for upto 15/18 KW motor including wiring with connected items in existing G+14 Storey building for 8 ps/ 13 ps/ Goods lifts 415V,50 Hz,3 phase with a speed of 1.2 mtr/sec comprising with maintenance free battery 12 V, 18 AH (04 Nos five year Maintenance free battery) to match with the existing capacity motor and controller system complete all as specified and directed by Engineer-in-Charge.
Schedule 'A' Part II Manual operation of electrically operated lifts (6Ps,8 Ps & 13Ps) per Bldg, of any make and capacity daily for 08 hrs in one shifts from 0600hrs to 1400hrs, including cleaning, taking care of entire lift installation from any pilferage, theft or damage etc complete all as directed by Engineer-in-Charge for R-1, R-2, R-13, R-19, R-26, R-31, R-33, R-34, Asha-2, Asha-4, Asha-5 ( Total 11 Nos Building) for lift attendent (11 Months) (1x11x11= 121 )
Note for item No 14.00 (i) Passes will be processed along with (after verification on signed certificate, Pass shall not be granted without submission or qualification proof & experience certificate for lift operator. In case of OEM, the qualification as applicable which shall be verified by Engineer-in-Charge before issue of passes. (ii) Each lift operator should be provided with uniform and items required for cleaning of cabin like cleaning solution, cloths, plastic chair etc. (iii) List of lift operator cum rescue operator employed should be submitted along with Police verification, Educational qualification, address proof, bank account details, experience, training certificate and getting approval from Engineer-in-charge before incorporating in work.
(iv) Lift operator should also have practical experience and shall posses thorough knowledge to rescue the passenger in case of emergency if anybody gets trapped in lifts with the help of lift operator. (v) Payment to Lift operator shall be done through aadhar linked bank account through IMPS/RTGS/NEFT only and wages which shall not be less than minimum fare wages as per Act in vouge. The contractor shall submit payment proof to Engineer-in-Charge beforeclaiming any payment. After entire satisfaction of Engineer-in-Charge the payment action shall be processed further. (vi) Lift operator (semi-skilled) shall report at lift cell as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their direction. If he is found absent or moved without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs. 1500/- per shift shall be affected. (vii) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above.
(viii) In case of malfunctioning if any noticed, lift operator shall intimate to the lift cell. (ix) In case of any necessary for rescue operation or in emergency situations, lift operator shall be capable of rescue the passenger and reacting the situation (in emergency situations) Rescue operator engaged for rescue operation shall immediately attend the complaint within 30 minutes failing which penality at Rs. 500/- per hour or part there of shall be levied. (x) Contractor shall submit the labour licenese as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (xi) Insurance coverage, compensation if any applicable or necessiated due to mis operation of lift shall be the responsibility of contractor. the quantum of compensation shall be assessed based on the BOO comprising of Lift Inspector of Maharashtra State represntatives of both agencies carrying out M&O works and routine maintenance work of lift and memebers from department. (xii) Duty roster for lift operator cum rescue operator should be submitted before starting of month and approval shall be obtained from Engineer-in-charge.
(xiii) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority . If the quoted amount is less than the estimated cost item Nos 14.00 i.e Rs. 38,73,210.00. the lowest bidder will have to depost FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (cover No 2). (xiv) The deposited amount shall be the difference between estimated cost i.e Rs.38,73,210.00. and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to with hold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withheld shall be final and binding. The withheld amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall submit 03 Nos of BGNs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be for 04 months, 08 month & 12 months respectively for the purpose of encashment release as the case may be. (xix) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working.
Monarch Enterprises
Shree Elevator Engineering Co.
shakti engineering and electrical works
Escon Elevators Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .