| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹4.7 L (2.17%)Admitted-Finance PLOT NO 5 SATHYAM GARDEN UYIRIYAL POONGA ROAD GORIMEDU SALEM 636 008 | SALEM | SALEM | TAMIL NADU | 636008 | ₹2.2 Cr+₹4.7 L (2.17%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹9.9 L (4.56%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹2.3 Cr+₹9.9 L (4.56%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹21.2 L (9.78%)Admitted-Finance 2 947 NELLAI NAGAR DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | 636701 | ₹2.4 Cr+₹21.2 L (9.78%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹27.2 L (12.6%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.4 Cr+₹27.2 L (12.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BVD Power Private Limited L1 | RAJ ENGINEERING CONTRACTOR L2 | M s Kumaresan and co L3 | MANICKAVASAGAM L4 | K DHINAKARAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Check surveying and pit marking including hire charges for T & P all labour charges, lead, lift, etc., complete. | 91 | Loc. | - | - | - | - | - |
| 2.00 | Clearing of light jungle between tower location | 45,500 | m2 | - | - | - | - | - |
| 3.00 | Earth work excavation for depositing on bank for tower foundation with initial lead, in all class of soil etc., complete.,for Hard gravelly soil | 3,936 | m3 | - | - | - | - | - |
| 4.00 | Earth work excavation in soft disintegrated rock for foundation not requiring blasting | 1,312 | m3 | - | - | - | - | - |
| 5.00 | Earth work excavation in medium and dense medium rock not requiring blasting for foundation | 656 | m3 | - | - | - | - | - |
| 6.00 | Earth work excavation in Hard rock requiring Control blasting for foundation | 656 | m3 | - | - | - | - | - |
| 7.00 | Labour charges forTransport & setting of Stub & Cleat and bolt & nuts, including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For GCR | 25 | Loc. | - | - | - | - | - |
| 8.00 | Labour charges forTransport & setting of Stub & Cleat and bolt & nuts, including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For HCR | 38 | Loc. | - | - | - | - | - |
| 9.00 | Labour charges forTransport & setting of Stub & Cleat and bolt & nuts, including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete.For KCR | 28 | Loc. | - | - | - | - | - |
| 10.00 | PCC 1:3:6, using 20mm HBG metal for foundation without form work including cost of cement all materials, labour, lead, lift, etc., complete. | 130 | m3 | - | - | - | - | - |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
8 Jan 2020, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru.vi.ka Industrial Estate, Guindy, Chennai -32.
Earth work excavation, Stub setting, Transporting ,erection of tower, Stringing of Panther conductor 6 Nos. And GI EW 7/3.55mm 1 No. For LILO of the existing BKB II Thiruchengode 110 KV feeder at the proposed Nallur 230/110 KV SS. ReachI(Loc.1-91)
2019_EB_150681_1
TP1-089/2019-20
Open Tender
Civil Works
Works
120 days
NALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.5 L
Yes
19 Feb 2020
9 Dec 2019
9 Jan 2020
9 Dec 2019
8 Jan 2020
9 Dec 2019
Amount
Check surveying and pit marking including hire charges for T & P all labour charges, lead, lift, etc., complete.
Clearing of light jungle between tower location
Earth work excavation for depositing on bank for tower foundation with initial lead, in all class of soil etc., complete.,for Hard gravelly soil
Earth work excavation in soft disintegrated rock for foundation not requiring blasting
Earth work excavation in medium and dense medium rock not requiring blasting for foundation
Earth work excavation in Hard rock requiring Control blasting for foundation
Labour charges forTransport & setting of Stub & Cleat and bolt & nuts, including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For GCR
Labour charges forTransport & setting of Stub & Cleat and bolt & nuts, including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete. For HCR
Labour charges forTransport & setting of Stub & Cleat and bolt & nuts, including Hire charges, transport and erection of templates, dismantling after stubsetting and transport from loc to loc etc., complete.For KCR
PCC 1:3:6, using 20mm HBG metal for foundation without form work including cost of cement all materials, labour, lead, lift, etc., complete.
PCC 1:2:4 using 20mm HBG Stone for foundation with steel form work including cost of cement all materials labour etc., complete.for Chimney and frustum
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete.
Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and transporting charges etc., complete.
Providing muffing copping with PCC 1:2:4 using 12-20mm HBG metal with form work including cost of cement all materials, labour, lead, lift, etc., complete.
Providing pipe type earthing using earth pipe and GI earth wire supplied including all labour and cost of earth pipe, etc., complete
Providing special earthing arrangements for Terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip including all cost of materials lead lift etc complete.
Plastering with C.M 1:3 12mm thick including cost of cement, all materials labour etc., complete.
Labour charges for Transport & Erection of tower including sorting out of tower parts at site, unloading at site,tighting and punching of bolts, nuts for final checking, including all lead lift labour etc. complete.for Normal Tower
Labour charges for Hoisting of single unit of Disc 7 nos of 110KV 90 KN insulator with single Suspension fittings, labour, lead, lift etc., complete. (90 KN Insulator supply by Board)
Labour charges for Hoisting of single unit of Disc 8 nos of 110KV 120 KN insulator with single tension fittings labour, lead, lift etc., complete. (120 KN Insulator supply by Board)
Providing trussel for High way Road crossings and Telephone lines during paying out, rough sagging and tensioning of power conductors and earth wire including cost of bamboo, coir and labour etc., complete.
Providing temporary stays during rough sagging and tensioning including excavation, refilling and dismantling the stays after tensioning etc., complete.
Labour charges forTransport, Paying out, jointing, rough sagging,& tensioning of 6 No. ACSR Panther conductors including clipping, providing SB dampers and jumpering in tension points transport of all materials from stores to site & fixing of all the other accessories, labour, leads and lifts etc., complete.
Labour charges for Paying out,Sagging and tensioning of 1no GI earth wire (7/3.55mm )to the required clearance, clipping using necessary clamp, tools with cost of required tension and suspension fittings and fixing of all the other accessories, labour, leads and lifts etc., complete.
Labour charges for Releasing and lowering of 8 units of single tension insulator with fittings including all labour lead lifts, and T & P etc complete.(under LC Condition)
Labour charges for releasing lowering and restringing of exsiting 3 Nos of Panther conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete.(under LC Condition)
Labour charges for releasing, Lowering and restringing of existing 1 No of7/3.55mm GI earthwire including lead, lift, labour and cost of T&P etc comple.(under LC Condition)
Labour charges for fixing Loop jumpers and removal of the same after commissioning of the 110 line including cost of all materials, labour lead lift T&P etc complete
Arranging and availing of LC on HT/LT power lines and lowering and retensioning after stringing is completed including all labour etc., complete
Painting with best quality of anti-corrosive black paint for a height of 1.00m from the top level of coping including cost of paint all labour etc., complete.
Labour charges for Tack welding of bolts and nuts in towers up to bottom cross arm using diesel generator sets and applying cold galvanizing paint including cost of all materials, lead and hire charges etc., complete.
Providing shoring and shuttering with CW scantlings and planks including cost of all materials, labour etc., complete.
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete
Labour charges for Tree cutting Small including cost of all materials, lead, lift, labour and transporting charges etc., complete.
Labour charges for Tree cutting Big including cost of all materials, lead, lift, labour and transporting charges etc., complete.
Labour charges for fixing number plate, phase plate and danger board including lead lift etc
Fabrication, supply and fixing in position of the Name Board made of steel sheet 18 Gauge (1.25mm)thick and Letter painting over the board as directed by the Engineer in charge of the work.
Supply of number plate as directed by the Engineer in charge of the work including all labour etc., complete
Supply of Danger boards as directed by the Engineer in charge of the work including all labour etc., complete
Supply of Phase plates(Set of three)as directed by the Engineer in charge of the work including all labour etc., complete
(Tower Parts) Fabrication, Supply of tower parts including cutting, drilling holes, galvanizing as per IS 2629-1985 and IS 4759 -1966 with hot dip process as per Technical specification as directed by the engineer in charge of the work including cost of all materials, galvanizing charges, all labour, lead and lift etc., complete.
Supply of standard G.I Bolts and nuts of various sizes and transporting of Bolt and nuts to site including all taxes and duties,freight charges etc.,complete.The raw material standard should be as per IS 2062 and for galvanising as per I.S.2633 and 6745(Latest code).The governing standards for towers should be as per the specified IS Codes directed by the Departmental Engineer at site.supply of GI bolts and nuts.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
RAJ ENGINEERING CONTRACTOR
M s Kumaresan and co
MANICKAVASAGAM
K DHINAKARAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_181294.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .