| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.6 LAccepted-AOC | ₹56.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹59.2 LRejected-AOC | ₹59.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Mahadevi K L1 | J Elango L2 |
|---|---|---|---|---|---|
| 1.001.Providing Drainage With Cover slab In MGR Street in Ayapakkam Panchayat UNDER CMDA FUND | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 94.13 | cum | 262 ₹24,662.06 Lowest | 300 ₹28,239 |
| 3.00 | Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 11.77 | cum | 2,049 ₹24,116.73 Lowest | 2,100 ₹24,717 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 11.77 | cum | 5,752 ₹67,701.04 Lowest | 5,800 ₹68,266 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc footing including cost and conveyance and all labour charges etc. | 355.4 | sqm | 545 ₹1,93,693 Lowest | 600 ₹2,13,240 |
| 6.00 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 0.74 | mt | 91,399 ₹67,635.26 Lowest | 92,399 ₹68,375.26 |
| 7.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance and all labour charges etc. | 30.64 | cum | 6,499 ₹1,99,129.36 Lowest | 6,599 ₹2,02,193.36 |
| 8.00 | Reinforced Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance and all labour charges etc. | 10.97 | cum | 8,809 ₹96,634.73 Lowest | 8,909 ₹97,731.73 |
| 9.00 | Cost and Supply of Man hole Cover SOR P-55 SLNO-238 | 22 | nos | 1,855 ₹40,810 Lowest | 2,855 ₹62,810 |
| 10.002.Providing interlocking Paver Block Road In Gayathri Nagar 1st Main Road and 2nd Main Road at Ayapakkam Panchayat UNDER CMDA FUND | |||||
Tender Value
₹57.4 L
EMD Value
₹58,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Project Director
DRDA Tiruvallur
Providing Pavar Block road and Drainage with cover slab 2 works in Ayapakkam panchayat Under CMDA fund Pac.VKM 06
2026_RDTN_651818_1
0818/2026/A7 Dt.04.02.2026
Open Tender
Civil Works
Item Rate
120 days
Villivakkam
as per eligible criteria
5 documents required · 5 mandatory
₹0
₹58,000
Yes
11 Jun 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
7 Feb 2026
1.Providing Drainage With Cover slab In MGR Street in Ayapakkam Panchayat UNDER CMDA FUND
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc footing including cost and conveyance and all labour charges etc.
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance and all labour charges etc.
Reinforced Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance and all labour charges etc.
Cost and Supply of Man hole Cover SOR P-55 SLNO-238
2.Providing interlocking Paver Block Road In Gayathri Nagar 1st Main Road and 2nd Main Road at Ayapakkam Panchayat UNDER CMDA FUND
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Cement Concrete 1:3:6 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete.
Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Flooring with paver blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges ( 80MM thick block)
Painting in white wash colour wash Two Sides Corewall inclouding cost and conveyance and other labour charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tech_bid_VKM_06.pdf
Tender Documents • 0.58 MB
BOQ_781594.xls
BOQ • 0.35 MB
PRICE_BID_VKM_06.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].