Tender Value
₹28.8 Cr
EMD Value
₹15.9 L
Closing Date
7 Aug 2026, 3:00 pmClosed
Yes (up to 3 members)
Yes (up to 3 members)
Two Packet System
Normal Tender
Yes
19/06/2026 15:00
Lowest to Highest
120 days
Expenditure
Capital (Works)
Above/Below/Par
PRD/CON/ER
13 conditions · 2 needing a document upload
As defined in the attached RFP document.
As defined in the attached RFP document.
33 conditions · 19 needing a document upload
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- V and shall be valid for a period of 90 days beyond the bid validity period. In case, submission of Bid Security in the form of Bank Guarantee Bond, following shall be ensured: i.A scanned copy of the Bank Guarantee bond shall be uploaded on e- Procurement Portal (IREPS) while applying to the tender ii.The original Bank Guarantee bond should be delivered in person in the office of CAO/Con/ER before closing date for submission of bids (i.e. excluding the last date of submission of bids). iii.Non submission of scanned copy of Bank Guarantee bond with the bid on e-tendering portal (IREPS) and/or non-submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. iv.The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. v.The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected. vi. The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for Project Supervision Services Agency (PSSA) for providing PROJECT SUPERVISION SERVICES at various construction sites under CE/Con/III/Eastern Railway, Asansol Division" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. vii. The envelope shall be addressed to the officer and address as mentioned in the tender document. viii. If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement of BG Bond.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
Attestation of documents may be self attested or attested by a Gazetted Officer.
This tender complies with PUBLIC PROCUREMENT POLICY ORDER-2017 dated 15.06.2017. Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Bidder should ensure minimum 70% payment of accepted rate or estimated rate as mentioned in tender document and NIT, whichever is higher, towards each personnel. Necessary supporting documents are to be produced by the agency along- with each On A/c Bill to the executive for verification. Payments of on A/C bills shall be made only after the proof of the same in previous bill.
Bidders are advised to carefully read the terms and condition of RFP document in detail before submitting their offers.
The Pre-bid meetings will be held in Hybrid mode i.e. in person and Video Conference (VC) on 19.06.2026 at 15:00 Hrs. The link of pre-bid meeting for joining through Video Conference (VC) is : https://calendar.app.google/aqT61ez4uTrJePmH8
Appointment of Project Supervision Services Agency (PSSA) for providing PROJECT SUPERVISION SERVICES at various construction sites of Asansol Division under Chief Engineer/Con-III, Eastern Railway, Kolkata.
01WTCAOCER2026-27
01WTCAOCER2026-27
Open
PSSA (Project Supervision Services Agency)
48 Months
Kolkata, West Bengal
₹0
₹15.9 L
5 Jun 2026
5 Jun 2026
24 Jul 2026
19 Jun 2026
59 items across 7 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 24,49,58,256 | ||
| — | 48.00 | — | — | ||
| Team leader cum Project Manager (01 No.) | — | — | — | 1,11,27,635.52 | |
| — | 240.00 | — | — | ||
| Resident Engineer (Civil) (05 Nos.) | — | — | — | 3,48,17,167.2 | |
| — | 96.00 | — | — | ||
| Resident Engineer (Electrical) (02 Nos.) | — | — | — | 1,47,93,114.24 | |
| — | 96.00 | — | — | ||
| Resident Engineer (Signal &Telecom) (02 Nos.) | — | — | — | 1,47,93,114.24 | |
| — | 624.00 | — | — | ||
| Sector Expert / Site Engineer (Civil) (13 Nos.) | — | — | — | 5,54,75,415.84 | |
| — | 144.00 | — | — | ||
| Sector Expert / Site Engineer (Bridge) (03 Nos.) | — | — | — | 1,17,07,488 | |
| — | 480.00 | — | — | ||
| Sector Expert / Site Engineer (Electrical) (10 Nos.) | — | — | — | 4,17,49,891.2 | |
| — | 432.00 | — | — | ||
| Sector Expert / Site Engineer (Signal &Telecom) (9 Nos.) | — | — | — | 3,90,97,257.12 | |
| — | 96.00 | — | — | ||
| Sector Expert / Site Engineer (P/Way) (2 Nos) | — | — | — | 85,95,153.6 | |
| — | 48.00 | — | — | ||
| Sector Expert / Site Engineer (Traffic/Operation) (1 Nos) | — | — | — | 42,67,339.68 | |
| — | 96.00 | — | — | ||
| Sector Expert / Site Engineer (Land Acquisition) (2 Nos) | — | — | — | 85,34,679.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Corrected RFP Document
ATTACHMENT
PreBid-PMSTender-Final.pdf
ATTACHMENT
CorrigendumNo.03.pdf
ATTACHMENT
Agreement Important major bridges
ATTACHMENT
APPENDIXIVofRFP_ASN.pdf
ATTACHMENT
Agreement Andal
ATTACHMENT
FinalAgreement_compressed1.pdf
ATTACHMENT
FinalAgreementSitarampurByepass_.pdf Agreement Sitarampur byepass
ATTACHMENT
CorrectedRFPdocument-PSSATender.pdf
ATTACHMENT
FinalAgreement-Importantmajorbridges.pdf
ATTACHMENT
FinalAgreement-Ch.189.40KmtoIRCh.205.000Km.pdf
ATTACHMENT
FinalAgreementSitarampurByepass_.pdf
ATTACHMENT
PreBid-PMSTender-Final.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .