Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹11.0 LAccepted-AOC | ₹11.0 L | H1 | Accepted-AOC Accepted |
| 2 | H2₹11.0 LRejected-AOC | ₹11.0 L | H2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | Raveendra g H2 | D M Srinivasab H1 |
|---|---|---|---|---|---|
| 1.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. | 27.16 | cu.m | 263.78 ₹7,164.26 | 312 ₹8,473.92 |
| 2.00 | Filling of basement with filling earth in layers not more than 15cm thick wall rammed watered and compacted complying with standard specification. | 18.82 | cu.m | 45.85 ₹862.90 | 55 ₹1,035.10 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 6.14 | cu.m | 5,454 ₹33,487.56 | 5,555 ₹34,107.70 |
| 4.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Below basement | 18.8 | cu.m | 6,149.8 ₹1.2 L | 6,149.8 ₹1.2 L |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angleBelow GL | 34.32 | sq.m | 547 ₹18,773.04 | 547 ₹18,773.04 |
| 6.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle above GL | 140.37 | sq.m | 1,095 ₹1.5 L | 1,095 ₹1.5 L |
| 7.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs Below GL | 24.09 | cu.m | 9,357.78 ₹2.3 L | 9,357.78 ₹2.3 L |
| 8.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 1.95 | MT | 91,932.1 ₹1.8 L | 91,932.1 ₹1.8 L |
| 9.00 | Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with special ceiling putty. etc., complete complying with standard specifications and as directed by the departmental officers. | 102.65 | sq.m | 184.25 ₹18,913.26 | 184.25 ₹18,913.26 |
| 10.00 | CC1:2:4 Mix using 20mm metal including cost and conveyance and labour charges etc, Complete | 0.36 | sq.m | 6,854.92 ₹2,467.77 | 6,854.92 ₹2,467.77 |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
2 Sept 2025, 3:00 pmClosed
Bdo pallipat
Bdo pallipat
construction of kalaiarangambuilding at Bommarajapetin SKR Pet Panchayat
2025_RDTN_596550_1
1927/2025/A2
Open Tender
Civil Works - Others
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
Yes
20 Feb 2026
25 Aug 2025
2 Sept 2025
25 Aug 2025
2 Sept 2025
25 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_712908.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid