| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC 70A 80 FEET ROAD JAROULI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹7.1 L Quoted ₹8.4 L | L1 | Accepted-AOC aoc |
| 2 | L1₹8.4 LRejected-Finance | ₹8.4 L | L1 | Rejected-Finance L1 |
| 3 | L1₹8.4 LRejected-Finance | ₹8.4 L | L1 | Rejected-Finance L1 |
| 4 | L1₹8.4 LRejected-Finance | ₹8.4 L | L1 | Rejected-Finance L1 |
| 5 | L1₹8.4 LRejected-Finance | ₹8.4 L | L1 | Rejected-Finance L1 |
Tender Value
₹9.9 L
EMD Value
₹98,990
Closing Date
24 Dec 2025, 3:00 pmClosed
CHIEF ENGINEER, KMC
MOtijheel
installation 06 Submersible pump at deffent places in Jarauli ward-82 Under Zone-03
2025_NNKAN_1099001_1
488/AA-2/25-26
Open Tender
Civil Works
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,990
30 Jun 2026
15 Dec 2025
24 Dec 2025
15 Dec 2025
24 Dec 2025
15 Dec 2025
Earth work in Excavation in trenches for foundation pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charge with in a distance of 50 mtr.
providing and laying in cement Concrete 1:6:12(1 Cement 6 fine sand and 12 gauge Brick Ballast norminal size 40 mm)and curing comp including cost of form work in foundation and floors etc all comp.
RCC work with Cement concrete 1:1.5:3 1 Cement:1.5 Corse sand: 3 Stone Agregate inculding all completion of work for slab
Mild steel or Iron in Reinforcement including all completion of work.
Class-150 Brick Work in (1:4) Cement mortar in foundation & plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work.
230 mm thk Class 150 brick work in (1:4) Cement mortar in Super Structrue including supply of all materials Labour and Tool And Plants etc, required for proper completion of the work.
12MM Cement Plasterin single coat o half brick wall for interior plasting upto flor two level including internal rounded angles chamfers and /or rounded angles not exceeding 80mm In girth and finishing even and smooth No extra for mixing any additive ch-13 (item no 17.58) 2nd
P/A wall putty of 1mm thick including all work.
Finishing walls with two coat of acrylic smooth exterior paint of best quality including supply of all material, labour and T&P etc. required for proper completion of the work.
P/I vitrifide tiles in different size etc all comp.
Providing PCC 1:1.5:3 with Cement, Co.Sand and 20mm Stone grit etc all work.
S/F of 15mm dia CPVC pipe of inclding all labour material
S/F of 32 mm dia CPVC pipe of inclding all labour material.
Providing and Intalation of 1.5 hp Submerible pump including all completion of work.
S/F of low density polythylene seamless one peace mulded tank and placing the same in proper position etc all work.
Cartage of Earth up to 3 Km including all completion of work.
Construction of pedestal with letter wrriting and fixing etc all work.
Add 18% G.S.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.42 MB
BOQ_2024385.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid