| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 CrAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹12.2 Cr+₹12.9 L (1.07%)Rejected-AOC VILLAGE SOTHSAL P O MOKDOMNAGAR DISTRICT BIRBHUM | L2 | Rejected-AOC L2 BIDDER | |
| 3 | L3₹12.8 Cr+₹70.4 L (5.83%)Rejected-Finance 14 1 1 HRIDAY KRISHNA BANERJEE 1ST BY LANE KADAMTALA HOWRAH W B | HOWRAH | WEST BENGAL | 711101 | L3 | Rejected-Finance EMD TO BE REFUNDED | |
| 4 | L4₹13.8 Cr+₹1.7 Cr (14.1%)Rejected-Finance | L4 | Rejected-Finance EMD TO BE REFUNDED | |
| 5 | Not Admitted-Fee/PreQual/Technical VILL P O BAHIRI PASCHIMPARA P S BOLPUR DIST BIRBHUM PIN 731240 | BOLPUR | BIRBHUM | WEST BENGAL | 731240 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
13 Feb 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (CIVIL)
1ST ADMINISTRATIVE BUILDING, CITY CENTRE, DURGAPUR
CIVIL WORKS
2026_ADDA_991411_1
ADDA/DGP/ED/N-70/2025-26(SL-1)
Open Tender
CIVIL WORKS
Percentage
540 days
CITY CENTRE, DURGAPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25.8 L
11 Mar 2026
21 Jan 2026
16 Feb 2026
21 Jan 2026
13 Feb 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. By manual means : From 50 mm to 100 mm thick | 15,688 | Sq m | 30.4 | ₹4,76,915.2 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth Up to 150 mm | 16,103 | Sq m | 14.4 | ₹2,31,883.2 |
| 3 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works) | 5,073 | Cu m | 37.3 | ₹1,89,222.9 |
| 4 | Extra for carriage of all kinds of earth by Mechanical Transport Carriage up to total lead of 3.0 km. { 2.00 Km + 1.00 Km Vide Item No - 3} | 5,073 | Cu m | 106.9 | ₹5,42,303.7 |
| 5 | Supplying, spreading and consolidating an uniform and homogeneous mixture of Stone Dust and Sand (mixed in proportion of 3 : 1 by volume and by any approved method as per direction of Engineer-in Charge) to the required thickness in layers at 97% Proctor Density (not less than 1.7 gm/cc) with power roller to proper gradient and camber, including watering as necessary, lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary complete as per Specification including all incidental charges of roller, cost of fuel & lubricants. | 1,975 | Cu m | 1,406.12 | ₹27,77,087 |
| 6 | Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(iii) Grading – III | 1,151 | Cu m | 1,771.73 | ₹20,39,261.23 |
| 7 | Grading – V | 1,323 | Cu m | 1,841.69 | ₹24,36,555.87 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). 250 mm compacted thickness | 5,180 | Cu m | 1,970.86 | ₹1,02,09,034.6 |
| 9 | Prime Coat Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For WBM / WMM Surface: (with primer @ 1.0 kg/sqm) ( SS Grade of Cationic Emulsion) | 25,900 | Sq m | 28.78 | ₹7,45,402 |
| 10 | Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces (Using Bitumen Emulsion at the rate of 0.275 kg per sqm.). treated with primer . ( RS Grade of Cationic Emulsion) | 25,900 | Sq m | 8.89 | ₹2,30,251 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
TenderBook.pdf
Tender Documents • 1.98 MB
BOQ_2424007.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .