Loading…
Loading…
Tender Value
₹17.8 L
EMD Value
₹35,620
Closing Date
14 Sept 2026, 4:00 pm
Executive Engineer PD 3rd Sgr
Executive Engineer PD 3rd Sgr
Construction of Toe wall/ Retaining wall including construction of toilet block and other allied works at Fairview Guest House Gupkar Srinagar.
2026_PWDJK_322189_10
e-NIT No. 14-P of 08/2026 Dated -24- 08-2026
Open Tender
Civil Works
Percentage
60 days
Executive Engineer PD 3rd Sgr
As per NIT
2 documents required · 2 mandatory
₹800
Executive Engineer PD 3rd Sgr
₹35,620
25 Aug 2026
25 Aug 2026
15 Sept 2026
25 Aug 2026
14 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearance of ground for new block cutting tree branches removing of tree roots etc incl Ground also | 10 | No | 650 | ₹6,500 |
| 2 | Earth work in excavation by manual means intrenches for foundations,drains,pipes,cables etc. (notexceeding 1.5m in width) and for shafts, wells,cesspits and the like not exceeding 10sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil Rate for a lead upto 50 meter from cutting edge | 44.02 | Cum | 673.3 | ₹29,638.67 |
| 3 | Providing and laying dry stone soling in the Trenches/ fields duly hand packed in level including ramming with iron rammers for foundation including all carriages up to 15 kms, Loading and unloading. | 4.2 | Cum | 950 | ₹3,990 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1cement :4coarsesand: 8graded stone aggregate40mm nominal size) | 4.2 | Cum | 5,202.9 | ₹21,852.18 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggre gate 20 mm nominal size) | 37.84 | Cum | 6,591.25 | ₹2,49,412.9 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering.All work upto plinth level with: 1 : 1½ : 3 (1cement : 1½ coarse sand: 3graded stone aggregate 20mm nominal size) | 12.01 | Cum | 7,788.4 | ₹93,538.68 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete up top linth level and above Plinth level.Hot rolled deformed bars | 1,200 | Kg | 123.2 | ₹1,47,840 |
| 8 | 20 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1cement:4 fine sand) | 216.09 | Sqm | 459.4 | ₹99,271.75 |
| 9 | Centering and shuttering including strutting ,propping etc.and removal of form for:Foundations, footings, bases of columnsetc.for mass concrete. | 90.51 | Sqm | 286.35 | ₹25,917.54 |
| 10 | Providing and laying of good earth in layers not exceeding 15cm in depth incld all watering, levelling , rammingetc and carriage all complete as per the directions of Engineer Incharge. | 16.43 | Cum | 750 | ₹12,322.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1078613.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].